Forwards Tier 1 Design Certification Matl for GE ABWR Design Stage 3,including Design Descriptions & Proposed ITAAC for All ABWR Sys for Which Design Certification Being Sought
ML20097A364
Person / Time
Site: 05200001
Issue date: 05/30/1992
From: Marriott P
GENERAL ELECTRIC CO.
To: Pierson R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20097A369 List:
References
MFN-121-92, SLK-9274, NUDOCS 9206020300
Download: ML20097A364 (2)


Text

g g;.

q

?

GE Nuclear Energy May 30,1992 MFN No.12192 i

Docket No. STN 52 001 SLK 9274 Document Control Desk U.S. Nuclear Regulatory Ccmmission Washington, D.C. 20555 Attention:

Robert C. Pienon, Director Standardization and Non-Power Reactor Project Directorate

Subject:

Tier i Design Certification Material for the GE ABWR Design Stage 3 Submittal Enclosed are thirt) four (34) copies of the Stage 3 GE ABWR Tier 1 Design Certification material.

This Stage 3 material includes the following:

Design descriptions and proposed inspections, tests, analyses and acceptance criteria (ITAAC) for all of the ABWR systems for which design certification is being sought.

Tier I entries for generic issues such as equipment qualification and radiation protection. This generic material includes technical issues for which certification will be based on approval of design acceptance criteria (DAC).

Interface requirements and associated ITAAC as called for by 10 CFR Part 52 for t ose portions of the plant fer which design certification is not being sought.

h

4. lefinition of the site-related parameters which have been used as input to the "AWR design process.

This submittal represents fulfillment of the GE commitment to submit Stage 3 Tier i material by the end of May 1992.

The enclosed material does not include the following infonnation:

1.

Comprehensive responses to ITAAC-related NRC comments received by GE in the last few weeks.

, e r, o n n C, ti v v (i d

g60$d Shi bM A

l Document Control Desk Docket No.52-001

. U.S. Nuclear Regulatory Commission MFN No.12192 May 29,1992 Page 2 2.

Tier I material for the Human Factors Engineering (11FE)/ main control room design process. This issue is being actively reviewed by GE-NRC and by mutual agreement is not addressed in the enclosed Stage 3 submittal. The llFE material will be added to the attached Tier I document when a mutually acceptable version is in place.

3.

Any proposed road map material beyond that presented in the Stage 2 submittal.

GE believes there is an understanding that preparation of road maps is an after-the-fact exercise which can best be undertaken following resolution of NRC comments on th Tier I material.

GE views the enclosed document as draft in the sense that we fully anticipate technical interactions with the staff and modifications of the enclosed material similar to the process which has occurred on earlier Tier 1 submittals. GE believes mutually acceptable schedules should now be established for NRC comments /GE responses on the entire Tier 1 package. We believe this schedule discussion should be an agenda item for the upcoming June 8 GE/NRC management meeting in San Jose.

Sincerely,

/

i P.W. Magiott, Manager Regmatory and Analysis Services M/C 444, (408) 925-6948 cc: F. A. Ross (DOE)

N. D. Fletcher (DOE)

C. Poslusny, Jr.

(NRC)

R. C. Berglund (GE)

J. F. Quirk (GE)

-