Director, Office of Resource Management July Monthly Operating Report August 10, 1984 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395 UNIT V.
C.- SUMMER.I DATE 08/09/84 COMPLETED BY G.
A.
Loignon TELEPHONE (803) 345-5209 MONTH JULY 1984 1
I DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
-)
(MWe-Net)
(MWe-Ne t) l 1.
694 17.
-08 2.
689 18.
-08 3.
686 19.
-07 4.
687 20.
-07 5.
686 21.
-12 6.
684 22.
-12 1
7.
682 23.
-13 8.
685 24.
-18 9.
684 25.
-33 10.
681 26.
-33 11.
679 27.
49 12.
675 28.
253 13.
679 29.
189 14, 92 30.
363 15.
-20 31.
665 16.
-08 8409QO O
O PDR R
m.x
- Director,l Office of-Resource Managenent
- July Monthly Operating Report
-Page 2 August ~ 10, 1984 ATDCHMENT II OPERATING DATA REPCRT DOCKET NO.
50/395 UNIT V. C. SG9ER I DATE 08/09/84 00NIEEED BY. G. - A. Icignon TELEPHONE (803) 345-5209 LOPERATING S'IMUS
' l'. Reporting Period:
JULY 1984 Gross Hours in Reporting Period: 744
- 2. Currently Authorized Power Ievel (MWt):
2775 Max. Depend. Capacity (M6e-Net):
885 Design Electriml Rating (MWe-Net):
900
. 3. Power Ievel to which restricted (If Any)(Mie-Net): N/A
~
. 4. Reasons for Restrictions (If Any): N/A j-t THIS K)tml YR TO DATE CWUIATIVE
- 5. Nunber of Hours Reactor Was Critimi 450.9 3,857.2 3,857.2
- 6. Reactor Reserve Shutdom Hours 0
0
- 0
- 7. Hours Generator on Line 416.4 3,707.4 3,707.4-
- 8. Unit Reserve Shutdom Hours 0
0 0
- 9. Gross Thernal Ehergy. Generated (21H) 833,316 9,626,900 9,626,900-
- 10. Gross Electrical Ehergy Generated (Mel) 267,820 3,202,569 3,202,569
- 11. Net Electrical Ehergy Generated (MGI) 247,805 3,046,600 3,046,600
- 12. Reactor Service Factor 60.6 75.5 75.5
- 13. Reactor Availability Factor 60.6 75.5 75.5 14.-Unit Service Factor 56.0 72.5 72.5 r
l
- 15. Unit Availability Factor 56.0 72.5 72.5 i
- 16. Unit Capacity Factor (Using K)C) 37.6 67.4 67.4
- 17. Unit Capacity Factor (Using Design MWe) 37.0 66.2.
66.2
- 18. Unit Forced Outage Rate 44.0 11.3 14.3
- 19. Shutdoms Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling, Septenber 1984, 60 Days.
- 20. If Shut Down at Ehd of Report Period, Ektimated Date of Startup: N/A
- 21. Units in 7bst' Status (Prior to Consnerical Operation):
FOREK2ST M2iIEVED Initial Criticality -
N/A 10-22-82 j
Initial Electricity N/A 11-16-82 02mnercial Operation N/A 01-01-84 i
t w
-w--
- s
--<-+y-
-**-=*re-"
- r'---
-*m
-r
-w-e-
-'*-+*--e--w
+ - = - - - -
--~~-v-%
Director, Of fice of Resource ' Management July Monthly Operating Report Pege 3 August 10,11984 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50/395 UNIT V.
C.
SUMMER I DATE 08/09/84 COMPLETED BY G.
A.
Leignon TELEPHONE (803) 345-5209 (1)
METHOD OF (2)
TYPE SHUTTING DOWN F: FORCED DUPATION THE REACTOR OR CORRECTIVE ACTIONS /
NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER COMMENTS 7
840714 F
321.2 A
1
- 7) Shutdown to repair Steam Generator tube leak.
8 840729 F
6.4 A
3
- 8) Trip on Lo-Lo Steam Generator level caused by Feedwater Reg. Valve erratic operation.
L Director,' Office of/ Resource ManagementJ July Monthly Operating Report Page 4 August-10, 1984 4
ATTACHMENT /IV NARRATIVE.
SUMMARY
. OF OPERATING EXPERIENCE The Virgil-C. Summer Nuclear Station, Unit-No. 1, operated at approximately 80% power through July 13,1984.
On July 14, 1984, power was reduced and the generator taken off line at 0518 hours0.006 days <br />0.144 hours <br />8.564815e-4 weeks <br />1.97099e-4 months <br /> to allow repairs to the "B" steam generator.
The plant entered Mode 3 at 0602 hours0.00697 days <br />0.167 hours <br />9.953704e-4 weeks <br />2.29061e-4 months <br />.
One leaking tube was ~ found and plugged.
7 On1 July 29,.1984, at 0459' hours, the reactor tripped on Lo'-Lo steam generator level from 60% power.
The Feedwater-Reg. Valve positioners-had been replaced during the steam generator repairs and were. exhibiting irregular behavior.
i On July 31, 1984, the plant was operating-at approximately 90%
power.
Power was being increased tx) 100%.
Initial refueling is scheduled to begin in late September 1984.
r i
i r
1 5
s F
a r
s
--y
,y
+ ---
,--,,,nr y
p ree, >, -
s -v.-
nn-,.e p
-n,,,
wrm r,
ww-w m ye e.,>..n<-
---. - -. -,+,.-
. i
}
'OFFSITE DOSE CALCULATION ' MANUAL
SUMMARY
OF CHANGES REVISION 6 k
Pages i and li:- These arelself-explanatory clerical changes to
~
- reflect ~ incorporation of this revision into the Offsite Dose' Calculation Manual.
Pages 1.0-40 and 2.0-51:
.This-change.to Figures 1.4-1 and 2.5-1 i
was made to clarify. the original intent of ' the figures.
The figure
. titles now explicitly reference the' surveillance requirements of Technical, Specifications 3.11.1.3'and 3.11.2.4.
In addition, an denotes those portions of the system that actually reduce t -
radioactive materials in the effluents and 'are required to: meet the i
92 day operability demonstration cycle.