ML20096G388
| ML20096G388 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 05/15/1992 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20096G392 | List: |
| References | |
| LIC-92-180R, NUDOCS 9205260057 | |
| Download: ML20096G388 (1) | |
Text
4
. ~.. -..,,.
Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 May 15, 1992 LIC 92-180R V. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
Transmittal of Fort Calhoun Station (fCS) Cycle 14 Core Operating Limits Report in accordance with FCS Technical Specification 5.9.5, attached is a copy of the Cycle 14 Core Operating Limits Report.
If you should have any questions, please contact me.
Sincerely, W5. U W. G. Gates Division Manager Nuclear Gperations WGG/sel Attachment c:
LeBoeuf, Lamb, Leiby & MacRae D. L. Wigginton, NRC Senior Project Manager S. D. Bloom, NRC Project Engineer R. D. Martin, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident Inspector S E O I, 6 d I
j 4s-str4 Empeyment eth taualop;ortanrty
~
\\
9205260057 920515 Malenemale l
PDR ADOCK 05000205 3