) M "' 2
- J L i-* d u vgm e mw?A 9 e,Q M*!*f*.M"A/J.d.1a AT
'\\ ! \\ "
m
^
21 A -
4'JEGUAnDS it.PORMA TION CLASSIFICATICN JODifKTT APPLY T01HIS PAGE WHEN g
EPARATED FROM ATTACILMENT Tennessee Valley Authonty. Post Office Box 2000, Soddy-Daisy. Tennessee 37379-2000 January 16, 1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - BASELINE PHYSICAL SECURITY / CONTINGENCY PLAN (PSP /CP), REVISION O, DATED NOVEMBER 20, 1995 Enclosed is the subject item along with instructions for updating NRC Copies 6 through 11.
The baseline revision to the SQN PSP /CP is being submitted pursuant to 10 CFR 50.54(p).
Tais revision was necessary to address the new security equipment and access control methodologies implemented at SQN as a result of the security upgrade program.
The effective date of this revision coincides with the declaration of the site perimeter for the SQN security upgrade program. provides an executive summary of the changes to the PSP /CP. is Revision O of the PSP /CP.
The material enclosed herewith contains safeguards information as defined by 10 CFR 73.21, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the material should not be placed in the Public Document Room.
The information is being sent by certified mail, and the signed receipt will signify that you have received this information and acknowledge that it contains safeguards material to be protected in accordance with 10 CFR 73.21.
9601240079 960116 PDR ADOCK 05000327 F
PDR 3,
1 23M ap 3
I g t
SAFEGUARDS INFORMATION 1
--. n p,
g mw -
g p - = -
4 g p q 4 g l.1 " a t,'/ 1 d.1 b~ m -
,,31V 1' L MA w v
.1 i"
U.S. Nuclear Regulatory Commission c/JEGUAHD6 INIV)RMATION CLASSIPICATICM Page 2 X)ES NOT AfPLY TO 3115 PAGE THEN 2PARATED FROH AiTACHMENT January 16, 1996 L
If you have any questions concerning this issue, please telephone S.
D. Gilley at (423) 843-7427.
1 Sincerely, R.
H. Shell Manager SQN Site Licensing
Enclosures:
(copies 6-9) i cc U.S. Nuclear Regulatory Commission (copies 10-11)
Region II i
P. O.
Box 2257 Atlanta, Georgia 30301 i
Mr. D.
E.
LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 l
SAFEGUARDS ::NFORMATICN
/ Cd"7]
A g g - CCL)m%.;O d p*A r~ -~ ~ A 7 m O T u
-~ w
,j-f
,a aAFEQUAMid (NmitMATION CLGilflCAT105 ENCLOSURE 1 30E8 NOT APPLY TO THIS PAGE WHEN 2EPAEATED FBtMt ATFACHMEhT TVA Nuc! car is completing installation of a major physical security upgrade program (PSUP) at SQN.
This PSUP consists of a total renovation of the security systems which when complete, will exceed the capabilities of the existing labor intensive manual system. It includes the following:
Installation of redundant high speed, high capacity state of the art security computer system.
New vital area (VA) door cardreadet n.h Local Intelligence Units (LIUs), which contain microprocessors capable of controlling access to doors should a loss of communication with the security computer occur.
Biometrics recognition system using handgeometry to perform identification of a security badge holder prior to admittance to the PA. This redundant stand alone system provides the ability to perform access control should a loss of communication with the security computer occur.
New protected area (PA) perimeter fencing and state of the art intrusion detection systern (IDS),
consisting of E-Field, Infrared, Microwave, E-Flex, and Optimesh.
New closed circuit television system (CCTV) consisting of high resolution solid state caracras with automatic call up, pan tilt and zoom, and video recording capabilities.
New uninterruptable power supply (UPS).
New Access Control Portal (ACP).
New vehicle sally port.
Upgraded central and secondary alarm st::tions (CAS/SAS).
Upon completion ofinstallation of this $37 million plus upgrade, TVAN will no longer rely on a large armed security force to compensate for antiquated security systems, but can replace compensatory omcers with technology installed by the PSUP that will exceed existing capabilities. Examples of some measures that will no longer be required are as follows:
Armed ACP omcer and armed administrative control omccrs will be replaced by unarmed omccrs based on the security upgrade and that these omeets are not required to be armed by 10 CFR 73.55, NUREG-0908, and NUREG-1045. This change does not reduce the number of armed responders committed to in this plan.
Additional armed plant foot patrols and armed administrative control omccrs to compensate for outdated VA door hardware will be replaced with new VA cardreaders, electromagnetic loc ks and LIUs.
Security badge issue omccrs will be replaced with handgeometry readers at PA portal.
Additional CAS/SAS operators manually !ogging alarms to compensate for outdated systern replaced with automated paperless system.
TVAN Security is prepared to submit a Revision 0 Security Plan to support operation of the new s>1tems installed under the PSUP. Changes under this plan meet the requirements for submittal under 10 CFR 50.54 (p), as they do not reflect reductions in levels of security commitments or take exceptions to current regulatory requirements. Revision 0 changes reformat the plan to create a more user friendly redue:d volume document, eliminate redundancy and the identification of resisions affected by the PSUP.
SAFEGUARDS INFORMATION
SAFEGUARDS INFC'RMAM~
.sAFEOUAilDe L%ng (gg M M APPLY 70 nnS PAGE WHEN 3EFARATBD FRON A1TAQlMEhT TVAN Security is confident that use of the new systems by TVAN's well trained and qualified guard force under commitments outlined in the Revision 0 Security Plan will meet or exceed all regulatory requirements. This Plan provides a high level of assurance that the security force can successfc.lly defend against any contingency identified within the design basis threat.
1 i
SAFEGUARDS INFORMATION