ML20096F326
| ML20096F326 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/30/1992 |
| From: | Hayes K ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20096E715 | List: |
| References | |
| NUDOCS 9205210052 | |
| Download: ML20096F326 (4) | |
Text
,
OPERATING DATA REPORT DOCKET NO:
50-313 DATE:
h.ay_52 1992 COMPLETED BY: K. R._llayes_
TELEPil0NE:
L501) 964-3535 OPERATING STATUS 1.
Unit Name: Arkansas Nuclear One - Unit '
2.
Reporting Period: April 1-30. 1992 3.
Licensed Thermal Power-(Mu ):
2 568 2
4.
Nemeplate Rating (Gross IlWa):
902.74
=
5.
Design Electrical Rating (Not MWe):
850 6.
Maximum Dependable Capacity (Gross MWe): _
Py 7.
Maximum Dependable Capacfty (N3t MWe);
d36 8.
If Cnanges Occur in Capacity Ratings (Items Number 3 Through 7) Since__
Last Report, Give Reason:
- f l
9.
Power Level To Which Rentr1cted.
If Any-(Not MWe):.Nonn 10.
Reasons For Restrictiorn.
If Any:
None
.. - ~. -
RQHTil YR-10-J)AIE CJHiplaI1YE 11.
Hours in Reporting Parlod...
719.0_
2,903.0 152,226.0 12.
Number of Hours Reactor was Critical.....................
0.0 1,416.S 107,277.7 13.
Reactor Reserve Shutdown Hours 0.0 0.0 5,044.0 14.
Hours Generator On-Line...... -
0.0 1,416.1 105.148.9 15.
Unit Reserve Shutdown liours..
0.0 0.0 817.5 16.
Gross Thermal Energy Generated
( M Wil )........................
0.0 3,557,599.0 238,73% O 3 17, Gross Electrical Energy Generated (MWH) 0.0 1,225,900.0 79,504. 4t.0. s 18.
Net Electrical Energy Generated (MWil)
-4,228.0
- 1,166,144.0
-75,541,392.',
19.
Un't Service Factor..........
0.0 48.8 69.1-20.
Unit Availability _ Factor.....
0.n 48,8 69.6 6
21.
Ur x-Capac:lt)-Factor (Uning HDC Net)..............
-0.7 48.1 59.4
(
22.
Unit Capacity Tactor-e _-
(Using DEC bt)
-0.7.
47.3
-58.4-23.
Unit Fotcod Outage Rate......
0.0 0.0-12.3:
24.
Shutdowns Scheduled Over Next. 6 Months _(Type, Date, and Duration 'of Each):
'1R10 Refuelingmoutage began et (0007 hrs) on-February 29 1992e The outage Insted-70 days.
- 25.
If Shut Down At End of Report Period. - Estimated Date ofi Star 5 p: May A 1992 26.
Units in' Test Status (Prior-to Commercial Operation):
Forect9t-Achieyed INITIAL CRITICALITY 08/06/74 INITIAL ELECTRICITY 08/_17/74 COMMERCIAL OPERATION 1_2f_19474+
9205710052 920515 PDR ADOCK 05000313 R
PDn 4_,
,i-
..__..___.______._____._m
--m-
b a
4 AVERAGE DAILY UNIT POWER i.EVEL-DOCKET NO:
50-313
. UNIT:
One DATE:
May_5 1992-1 C0hPI.ETED BY: L_R. Ilayes TELEP110NE:
150_11 964-5535 MONTH April, 1992 3
DAY AVERAGE DAILY POWER LEVEL (MWo-Net) 1..............
-5 2..............
-5 3..............
~5 4..............
-S 5..............
6.............
7.............
8..
-3 9..............
-3 10
...c......;..
-3 1:
-3 12.............
-5 13.............
-5 o
14.............
-5 15.
-4 16.............
-5 17.............
-6 18.............
=-5 19.............
-5 20.............
-6 21.............
-7 22.............
--7 23.............
-7 24..............
-18 25..-...........
.-18 26.............
-7 27-.............
-7 28.............
.-6 29.............
-6 30.............
--7
(-
AVGSt ~- 6 INSTRUC110N Onth;sl format, list the average daily unit power llevol in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
MONTitLY OPERATING REPORT OPERATING
SUMMARY
APRIL, 1992 UNIT ONE Unit One was off-line the entire month continuiug the-1R10 refueling outage..
i r
s 1.
l l
L___---___-_2_--__-___-.__-
_ = -
- - _ _ :. L.
A 6
u UNIT SHUTDOWFS AND POWER REDUCTIONS REPORT FOR APRIL, 1992 DOCKET NO.
50-31 UNIT NAME ANO Unit-l' DATE May 4 1992 COMPLETED BY K. R. Hayes TELEPHONE (501) 964-5535 Methed of Licensee ~
Cause 5 Corrective' Duration Shutting Event-System Component Action to 5
No.
Date
]Dg>e (Hoursl:
Reason Down Reacter'-
Report (i.
Code' Code -
Prevent Recurrence 92-01
.920401 S
719 C
4 NA NA~
N4 Unit offline continuing 1R10. refueling cutage.
l I
l i
l l
-l 8'
3 2
F: Forced-Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain)' 1-Manual for Preparation of Data
- B-Maintenance. or Test 2-Manual Scram.
Entry Sheets for Licensee 3-Automatic Scram.
Event Repr et (LER) File (NUREG--
C-Refueling 4-Continuation 1022)
D-Regulatory Restriction E-OperatoriTraining 6 5-Load Reduction 5
License-Examination 9-Other
' Exhibit I - Same Sourco F-Administrative.
'G-Operational-Error.(Explain)-
H-Other (Explain).
_