ML20096F265

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 to Emergency Plan for Triga Reactor Facility. Gender Refs Removed from Plan.Changes Do Not Decrease Effectiveness of Plan
ML20096F265
Person / Time
Site: U.S. Geological Survey
Issue date: 05/13/1992
From: Danni Smith
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096F269 List:
References
NUDOCS 9205200318
Download: ML20096F265 (2)


Text

.

.2 sm-I #h United States Department of the Interior M 01 Ol.OGIC AI St R\\ l Y

  • w.

IlON 2$046 N1 S.

973 Y

"m' M

DLNVi R I1 DLRAL CLN1LR DLN\\TR. COLORADO $022$

n orm emno BRANCH OF GEOCHEMISTRY May 13, 1992 Ref: Docket 50-274 Document Control Desk U.S. Nuc1 car Regulatory Commission Washington, D.C.

20555 Sirst Enclosed are three copies of Revision 4 of the Emergency Plan for the U.S. Geological Survey TRIGA Reactor Facility.

The plan was revised as permitted by 10 CFR 50.54(q) and this report is submitted accordingly.

The USGS Reactor Operations Committee reviewed the changes to the Emergency Plan and found them to not decrease the effectiveness of the plan.

The changed text areas of the plan are marked with a vertical line in the left margins on the respective pages.

Explanations of the changes are as follows, with page numbers referring te +he Revision 3 copy.

Throughout the document, gender references to personnel were eliminated, e.g. he, his, him, etc.

1.

p.2, Section 2. - Added definition of assembly area and made other minor grammar changes.

2.

p.3, Section 3.1 - Corrected spelling of " relating".

3.

p.4, Section 3.1.1.2 - last paragraph, added "in consultation with the Health Physicist".

4.

Figure 4 Changed solid line from Health Physicist to Reactor Health Physicist to a dashed line.

Also clarified Health Physicist to be Central Region Health Physicist.

5.

p.7, Section 4.2.3.2 - Clarified "five times this-level" to be 500 mrom.

g5200318920513 p

ADOCK 0500op74

\\\\\\

199 nu Poa

a

~

6.

p.13, Section 4.7.1 Next-to-last paragraph, corrected spelling of " biennially".

7.

p.13, Section 4.7.2 Removed specific review and audit requirements from plan and referenced the Technical Epecifications.

Alao specified that writter, agreements and call lists will be updated biennially, not to exceed 30 months.

Please contact Tim DeBoy at (303) 236-4726 if you have questions regarding this emorgency plan revision or need further details.

Sincerely,

)

g.

/

f),,/ /

~'

A

,/

David B. Smith Reactor Administrator Copy to:

U.S. Nuclear Regulatory Commission ATTN: Mr. L.J. Callan 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Tim DeBey, USGS, MS 424

- - - - _ _ - - - _