ML20096E277

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to VT Yankee Cycle 18 Core Performance Analysis Rept. Rept Presents Design Info,Calculational Results & Operating Limits Re Operation of Cycle 18 of Plant
ML20096E277
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/16/1996
From: Duffy J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096E279 List:
References
BVY-96-05, BVY-96-5, NUDOCS 9601220098
Download: ML20096E277 (1)


Text

f" l

L VERMONT YANKEE NUCLEAR POWER CORPORATION

+

Ferry Road, Brattleboro, VT 05301-7002 f

ENGINEERING OFFICE 580 MAIN STREET BOL TON. MA 0:740 (508)779-6711 January 16,1996 BVY 96-05 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

a.

License No. DPR-28 (Docket No. 50-271) l

Subject:

Vermont Yankee Cycle 18 Core Performance Analysis Report 4

Enclosed for your convenience is Revision 1 of the Vermont Yankee Cycle 18 Core Performance Analysis Report, dated November 1995. This report presents design infomiation, calculational results and operating limits pertinent to the operation of Cycle 18 of the Vermont Yankee Nuclear Power Station. Revision 1 incorporates the recently analyzed Loss of Stator Cooling event.

Should you have any questions regarding the enclosed material, please contact this office.

l Sincerely, l

VERMONT YANKEE NUCLEAR POWER CORPORATION f

James J. Duffy Licensing Engineer Enclosure c:

USNRC Region I Administrator USNRC Resident inspector-VYNPS USNRC Project Manager-VYNPS 9601220098 960116

[$g[

PDR ADOCK 05000271 P

PDR gg, 320076'

.,