Text
.
CV b
'8 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 JOHN S. KEMPER VICE-PR FSID ENT ENGtNEEM4NG AND RESE ARCH '
- Mr. A. Schwencer, Chief '
Docket Nos.:
50-352 Licensing Branch No. 2 50-353 Division of Licensing U. S. Nuclear Regulatory Ccmnission
. Washington,'D.C. 20555
Subject:
Limerick Generating Station, Units 1 and 2 Mditional Information for Licensee Qualification Branch
Reference:
1)
Telecon between NRC, Bob Benedict, and PECO, Dave Honan, on May 9, 1984.
2)
Telecon between NRC, Bob Benedict, and PECO on August 24, 1984.
Attachment:
Draft FSAR Page Changes File:
GOVT 1-1 (NBC)
Dear Mr. Schwencer:
The reference 1) telecon requested additional information on PECO's policy regarding periodic review of administrative procedures.
Pursuant to the reference 2) telecon, this information is provided in the attached draft FSAR page changes and will be incorporated into the FSAR revision scheduled for October,1984.
If you require any additional information, please do not hesitate to contact us.
Sincerely, IM RDC/gra/08298405 cc: See Attached Service List O
DO O
3
'l s
7 -._
-y
[q cc: Judge' Lawrence Brenner -
(w/o enclosure)
' Judge Peter A.-Morris (w/o enclosure)
JJudge Richard F. Cole-,.
-(w/o~ enclosure)
(w/o' enclosure)
Troy B. Conner,'.dr., Esq.
Ann P. Hodgdon,LEsq.
'(w/o enclosure)
. Mr. ' Frank R. Romano (w/o' enclosure).
'Mr. Robert L.' Anthony (w/o enclosure)
-Maureen Mulligan (w/o enclosure)
Charles W.~ Elliot, Esq.
(w/o enclosure)
Zori G. Ierkin, Esq.
(w/o enclosure)'
Mr.: Thomas Gerusky (w/o enclosure)
Director,* Penna. Emergency (w/o enclosure)
Management Agency Angus R. Love, Esq.
(w/o enclosure)
David Wersan, Esq.
(w/o enclosure)
Robert J. Sugarman, Esq.
(w/o enclosure)
Martha W. Bush,-Esq.-
(w/o enclosure)
Spence W.: Perry, Esq.
(w/o enclosure) day M. Gutierrez, Esq.
(w/o enclosure)
Atomic Safety & Licensing (w/o enclosure)
. Appeal Board Atomic Safety S Licensing (w/o enclosure)
. Board Panels-
- Docket'S Service SectIon (w/o enclosure).
~
Mr. James Wiggins.
(w/o enclosure)
.Mr.-Timothy R. S. Campbell (w/o enclosure) e.
Y r-
gy DRAET LGS FSAR 13.5 PLANT PROCEDURES-Safety-related activities performed by the plant staff shall be
-governed by written and approved procedures of a type appropriate to the circumstances and activity, and shall be carried out in accordance with those procedures.
Where appropriate for determining that important activities have been satisfactorily
_ accomplished, quantitative or-qualitative acceptance criteria
'shall be.-included.
The Philadelphia Electric Company (PECo) utilizes the operating experience gained at Peach Bottom Atomic 5
Power Station -' Units 2 & 3-(boiling-water reactor (BWR) units similar to. Limerick Generating Station) in the development of-the
. procedures.
As fully described below, PECo has implemented ANSI N18.7 -
1976/ANS 3.2, Section 5-as modified by Nuclear Regulatory Commission'(NRC) Regulatory Guide 1.33 (Rev 2),. paragraphs C.1-and.C.5.b through C.S.j, as these documents apply to operating.
.staffcactivities, ~ in the preparation, content, and control-of.
procedures.
~
It is planned that most administrative and operating procedures
'will be-in effect at least six months prior to fuel loading of LUnit 1.
.The; procedures will'be~ implemented with sufficient lead time.to ensure-that operating personnel can become familiar with
.them.
PECo recognizes the benefits of using the preoperational testing phase to demonstrate the adequacy of operating procedures
'and, where practicable, this will be accomplished.
'The:following paragraphs describe:the types of procedures to be employed by station operating' personnel in the conduct of
- safety-related activities.- These procedures are normally
! prepared by_the station operating staff.
However, organizations
'providing technical support and consultants may assist in
- procedure development.
The procedures and revisions thereto are reviewed by-the-Plant Operations Review Committee-(PORC), or by a subcommittee; appointed by-PORC, and are approved by the. Station g
-Superintendent or Assistant Station Superintendent prior to use.
13.5.1. ADMINISTRATIVE PROCEDURES I
Administrative procedures generally include those that establish station management policy, those that control activities-that involve interfaces amongJdisciplines.or groups supporting plant operations, and,those that establish criteria for procedures and activities implemented by tne plant-staff and support
. organizations.- Administrative procedures shall be prepared in sufficient detail so that tasks are performed in a consistent, LefficientLmanner and to ensure that the necessary reviews and approvals are performed.
~
. -1 13.5
..: 6 3
- ~
DRAET'*
~
~
- pre Lg as/ an-/m/w e2 -a-,-,A
/ga anew ss /su /y&ah; 6 aey spais xaahsssee se</ymd2 msbo?iee paeedas, asaa&de preedas ~hasL a M paa k
- and 15#1 Ayk6 ptseec se xawed s/ s yes<e/
aeney x de das a afash-d w p es a.
74 m uu kaase-,Aac/dda K&
pee &d Jeyeney
-faysa sm xe1%/ 6 mse pnee da,es u
N N
N8 N
- secamat esmpan jsd24s eSaryc.
.id NO[/w st s
A;WsnLmsaWyCesde peedn e, &
dsgs-.
Ban)e: ;nedsse hsAwesAAsh ;wyeam ads %f
- seeeway elanges,. a paee4/a as ys/d Adler;of #m
- h%yans.#e de ps/le aesgv of ra 7%e h
,ias asso/ aahef soa' xe, ewe yneed/es sm A ;#bwyw yerdemance of a /sd< J arsdxe w/
yaeedae yea de paa4x
/>
eweeA
,