Text

-_-_-__- . _--__ __________ __- _ ____ _________ ______ ____ ____ _ _ _ _ _ _ _ _ _ _ _

  • / 'ouwn Nxw Dpeavg Ccnimny

. 0051 cPtco (kw I?95

  • B!tmof am, A!at>:rta 35201

, Teleprow POS Bf,8 SudG h k J, D. Woodard

  • h $ h .

j' ~e F's

, "jt ur soueeo ecanc sc.:em May 11, 1992 Docket No. 50-364

~

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Unit 2 Mo01hly Operatina Datajlgport _

Gentlemen:

Attached is the April 1992 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications, if you have any questions, please advise.

Respectfully submitted, b nk .-

b.Woodard AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 9205150170 920430

l. f

),Q u s

PDR ADOCK 05000364 R PDR j, ,

)

__ ._ _ _ _ . . . _ _ _ . . _ _ _ _ _ . - . _ _ . _ . _ _ _ _ _ _ . ~ , _ _ . _ _ _ . . _ _ _ -

<s

~'

JOSEPH H. PARt.EY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OP OPERATIONS April, 1992 The cycle 8-9 refueling outage continued through the month of April.

The following major safety related maintenance vas performed during the month i of April:

1. Completed 10 year ISI inspection of the reactor vessel.  !

l

2. Eddy current inspections vere performed on 100 percent of the available tubes in all three steam generators (SGs). As a result j of this inspection a total of 42 tubes vere plugged, 29 vere ~

repaired and 217 vere designated as P* tubes in the three steam generators. The tube plugging was completed on April 22, 1992.

3. Complcted fuel reload. Inspected fuel for condition and damage.
4. Performed testing and maintenance en various safety-related hydraulic and mechanical snubbers.
5. Performed testing and maintenance on A and B train RHR rystems.
6. Performed various desigr. changes on the Reactor Coolant and H!!SI systems.
7. Refurbished the 2A, 2B, and 20 accumulator discharge valves.
8. Disassembled, inspected and re.naired various MSIVs.
9. Performed testing and maintenance on AFV system.

1

10. Some service water pipe was replaced with stainless steel.
11. Removed the excess flow check valves on the letdovn line.
12. Removed whip restraints on pressurizer surge line.
13. Miscellaneous corrective and preventive maintenance was performed l on the diesel generators.
14. Repaired servise water return line on 2B diesel generator.
15. Performed safety related MOV testing and preventive maintenance tasks.

t 4

_ _ , . ,m - , . . , , . _ - , , . - . - , , _ . -

n  %,- ,n.-

a .,

OPERATING DATA REPORT DOCKET NO. 50-364 j DATE May 6, 1792 i l

COMPLETED BY- D. N. Hoce TELEPHONE (205TEW51b6 l l

I OPERATING STATUS '

l6tes l

1. Unit Names _

Joseph H. Farley - Unit 2 _ _ _

1) Cumulative data sine.e
2. Reporting Period: April 1992 7-30-81, date of (
3. Licensed Thermal Power (HVt): 27632 commercial operation. l
4. Nameplate Rating (Gross MVe): _ __ 130
5. Design Electrical Rating (Net HVe): 677 ~
6. Maximum Dependable Capacity (Gross HVe): 864.1 7._ Maximum Dependable Capacity (Net HVe): 8 2 4 . 0_ _ _ ~ ,
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasonst N/A
9. Power Level To Vhich Restr!cted, If Any (Ret HVe): N/A ~~~
10. Reasons For Restrictions, If Any N/A

'this Month Yr-to-Date Cumulative

11. Hours In Reporting feriod 719.0 2,903.0 94,272.0
12. Number Of Hours Reactor Vas Critical 0.0 1,565.1 80

^~

4797T 0.0 07U TU

13. Reactor Reserve Shutdown Hours ~
14. Hours Generator On-Line 0.0"- 1,546 I 79,474.6 0.0 0.0 0.0
15. Unit Reserve Shutdovn Hours 4,066 22773 203,025,549.9

~

16. Gross Thermal Energy Generated (HVH) 0.0
17. Gross Electrical Energy Generated (MVH) 36.0 1,11 , .U 66,635,8567U
18. Net Electrical Energy Generated (HVH) (4800) 1,265,13170 63,199,216.0
19. Unit Service Factor 0.0 5373 ~

84l3 0.0 53.3 84,3

20. Unit Availability Factor ~

-21. Unit Capacity Factor (Uning HDC Net) N/A ~ ~ ~ ~ ~

52.'9 81.8

~~~

32. Unit Capacity Factor (Using DER Net) N/A 52.T 4679
23. Unit Forced Outage Rate 0.0 2.3 4.1
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: Hay 9, 1992
36. Units In Test Status (Prior to Commercial Operation): Forecast Achieved l

l

. INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 65/24/81 05/25/81 COMMERCIAL OPERATION 08/01/01 __,07/30/81 l

Form 2/30

.~. . - .. . - ~ - -. --

DOCKET NO. 50-364 IINIT 2 I

DATE Hay 6, 1992 i COMPLETED BY D. N. Morey -~

TELEP:10NE (205)899-5156 MONTH April e DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net) (HVe-Net) 1 0 17 0 2 0- 18 0 ,

3 0 19 0 4 0 -20 0 5 f 21 ,

0 6 0- 22 0 i

7. 0 23 0
8. 0 24- 0 9' __

0 25 0 I 10 0 -- 2 6 0 11 0 27 0 L

12 0 28 0- i i

' 13 ._ 0 29 0 i

i .' , 14' 0 -30 0 15 --

0 31 N/A

g. .

16 0-INSTRUCTIONS On-this format, list the averace daily unit power level in HVe-Net for.each day in- '

- the reporting month. Compute to the nearest whole megavatt.-

Form 13/21.

i=

,. , . . . , - , . ...n.. , , . . - , , , , ,..n. ,n.. . , , - . n . , , . ,- , - , , , - , -

s 1

UNtf StU100WNS AeC POWER REDUCTIONS DOCKET Wo. 50-3M .

unti mA% J. w. f ae:EV - t*tt 2 CATE Ny 6. 1992 -

i

~

CossFtETED 67 D. 4. nopty i-REPORT K0stTW APWIL TELEPMONE (20515C9-5?56 ,

! ................................. ..................... ...... ...... ..................................................................................... .I METHOC OF LICENSEE CAttsE & CORRECTIVE

! DURATION- 5%'TTildG EVEET SYSTFM COMPONEET ACTION TO NO . ' DATE TVPEI (HOURS) REASON 2 DOWN REACTOR 3 REPORT # CODE' CCOEI' FREVEmi RECURPENCE t

, 003 920401 5 719.0l .c 3 N/A N/A ' N/A . The Cycle 8-9 Refueling contirued f ran 920307. l i- i

, i k

W f t I

t  !

t t

i 1

6

]- i

^i F

l i

i t

I 4 .k g

i 6

f i

+ r 3

i 4

i I

4 .............. -

i t

e I

I I F:. Forced 2,,,3cn 3 Method: kahibitC-Instructinns l' S: Scheduled . A-Equipment failure. (Explain) 1-Manual for Preparation of Data B-Maintenance or T(st 2-Manuai scram. En;ry Stats for Licensee f s

C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG- L D-Regulstory Restriction - A-Other (Explain) 01613 E-Operator Training & ticense Examiration f

! }

i F-Achinistrative 5 Exhibit I -Same Sourte I t

G-operational Error (Explain) l (9/T7) H-Other (Explain)

[

f f

' }.

. .- . . .- - . - . - _ _ - _ _ . - .