ML20096C386
| ML20096C386 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 01/10/1996 |
| From: | Richard Anderson NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20096C390 | List: |
| References | |
| NUDOCS 9601170277 | |
| Download: ML20096C386 (1) | |
Text
.
e so n.-m
?
o Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 January 10, 1996 U S Nuclear Regulatory Commission Attn: Document Control Desk 1
Washington, DC 20555 l
l MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Transmittal of NSPNAD 8608-A, Revision 4,
" Reload Safety Evaluation Methods for Aeolication to the Monticello Nuclear Generatino Plant" By letter dated September 29, 1995, the NRC approved Revision 3 of Topical Report NSPNAD-8608, " Reload Safety Evaluation Methods for Application to the Monticello Nuclear Generating Plant". This September 29, 1995 letter, including the Safety Evaluation, and previous applicable Safety Evaluations, were placed in front of Revision 3 and the report was reissued as NSPNAD-8608-A, Revision 4 (same title). Confirmation that this was the only change between NSPNAD-8608 Revision 3 and NSPNAD-8608-A Revision 4 is provided by the fact that there are no sidebars to indicate revisions and by the description of the Revision 4 change given on page 194.
l The purpose of this letter is to transmit copies of NSPNAD-8608-A, Revision 4 for your records. If you have any questions please contact Mel Opstad at 612-295-1653.
g I6 (er Roger O Anderson Director Licensing and Management Issues Enclosure c: Regional Administrator III, NRC (1 report)
Senior Resident Inspector, NRC (1 report)
NRR Project Manager, NRC [2 reports)
Ed Kendrick, NRR Staff Reviewer (3 reports)
,u. s ummuornaamccommmma n.
170067
\\
00 9601170277 960110
)
tg PDR ADOCK 05000263 P
_