ML20096B760
| ML20096B760 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/06/1992 |
| From: | Woodard J SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9205120261 | |
| Download: ML20096B760 (2) | |
Text
then Nxiev Opewg Comrany IO!:1 OthC$ DOW 1hl!s Omungham, AW>ama 31P01 Telet#one ?05 b68 !>080 n
J. D. Woodard h
h
.V vee Precaent May 6, 1992 t'+" M c'" o n t" W *'"
ra w ircyct Docket No. 50-364 U. S. Nuclear Regulatory Conunission ATIN: Document Control Desk Washington, DC 20555 Joseph M. farley Nuclear Plant - Unit 2 SEccial Report No.92-002. Steam Generator Tqbe Pluanino Gentlemen:
Joseph M. f arley Nuclear Plant, Unit 2, Special Report No.92-002 is being submitted in accordance with Technical Specification 4.4.6.5.a.
If you have any questions, please advise.
Respectfully submitted, (4)ha tn Woodard JDW/ REM: map 2360 Enclosure cc:
'Mr. S. D. Ebneter Mr. S. i. Hoffman Mr. G. F. Maxweli 9205120261 920506 p t/.7 gDR ADOCK 0500 4
'//
f Special Repoi 92-002, Unit 2 Steam Generator Tube Plugging The following steam generator tube plugging report is being submitted in accordanco with Technical Specification 4.4.6.5.a.
The eddy current testing results of the Unit 2 eighth refueling outage are as follows.
SLQ h SIG B SJk_C Plugged Tubes 11 21 10 Repaired Tubes 18 0
11 F* Tubes 16 36 165
-The plugging and repair work was completed on April 22, 1992.
The complete results of the steam generator tube inservice inspection will be reported in accordance with Technical Specification 4.4.6.5.b.