ML20096B462
| ML20096B462 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 08/22/1984 |
| From: | Jens W DETROIT EDISON CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| EF2-72766, NUDOCS 8409040149 | |
| Download: ML20096B462 (8) | |
Text
g-.
?
_. c-! 2d -o L._
^]
.. Wnne H. Jens :
[-
Vice President Y
Nuctear Operations
,..f Qf-reamv2 >
6400 North Chee Highway b
e 7.
Newport, Megan 4H66
'3'
- d*
August 22, 1984-EF2-72766 Director 'of, Nuclear Reactor. Regulation Attention:' Mr.
B. J. Youngblood, Chief Licensing Branch No.l Division of. Licensing U.
S. Nuclear Regulatory Commission.
Washington, D.C.
20555 i.:
Dear Mr. Youngblood:
(-
Reference:
Fermi 2 NRC Docket No. 50-341 i
l
Subject:
Radiation Protection Manager (RPM)
[
Qualifications As you are aware, Edison has selected Mr. John Bobba as the new Fermi 2 Radiation Protection Manager.
To document Mr. Bobba's qualifications, Edison is submitting the following informations a)
A comparison of Mr. Bobba's experience in the radiation protection field with the guidance contained in Regulatory Guide 1.8 (Attachment 1), and b)
A summary of Mr. Bobba's experience in both the naval and commercial nuclear industries (Attachment 2).
This information was previously discussed in a telephone conversation with the NRC staff reviewer (F. Skopec) on l
June 15, 198 4.
Based on the information provided, I
Mr. Skopec indicated that although Mr. Bobba's educational l
background did not completely conform with the guidance of Regulatory Guide 1.8, it appeared that his experience at commercial and naval nuclear ~ plants did provide the desired i
background.
l Mr. Bobba's experience will be appropriately documented in a forthcoming amendment to FSAR.
i -
1 8409040149 840822 fDRADOCK 05000341 PDR 3,
\\\\
l
. l
-Mr.-B[J.--Youngblood j
~
~
. August 22,.1984
EF2-72766
'Page 2 Should you have any additionalLquestions, please. contact' Mr. Keener-Earle at (313) 586-4211.
Sincerely, 1
cc:
Mr.
P. M.-Byron *
'Mr. L. J.
Hueter*
Mr. M. D.. Lynch
- Mr.
F. Skopec*
USNKO,' Document Control'~ Desk
- Washington, D.C.
20555
- With attachments
$/
P
,-cw--em+, - - A
,--c--r y-
,,-=
9
n 4(
P j nm
, i y
- ', J, A
ATTACHMENT 1: REGULATORY' GUIDE 1.8 COMPARISON -
.e The discussion below provides ~a' detailed.~ comparison of Mr. John
^
~
~ '
[P.3 Bobba's qualifications' with those suggested by Regulatory-Guide 1.8.
f The Radiation Protection Manager:*
"shouldLbe an experienced professional _in applied radiation protection'
~
at nuclear facilitiesidealing with radiation protection.problema and' programs similar.to those at nuclear power stations."
As indicated below, Mr. Bobba has had significant experience. in the radiation. protection field at several different -nuclear ' power stations;in various modes oft operation and shutdown.
"should be familiar with-the design features end' operations of nuclear power stations that affect the potential. for-exposures of persons to radiation."
Mr. Bobba has seven years'(1964-1971) of naval experience in which he dealt with the maintenance and operation of a naval (PWR) reactor during which he qualified as an Engineering Watch Supervisor and Engineering Laboratory Technician.' In addition,.
Mr. Bobba has over.four years (1971-1976) of design and systems
.(both primary and secondary) work with Stone and Webster Corporation.. This experience has familiarized Mr. Bobba with the ALARA concerns considered in the initial design of plant systems.
His operations experience with the navy and his subsequent work as an HP. in operating and shutdown plants -(over eight years experience) has provided'him the knowledge necessary to properly
~
implement a radiation protection program.
"should have the technical competence-to establish radiation protection programs and the supervisory capability to direct the work of professionals, technicians'and' journeymen required to implement.the radiation protection programs."
The technical background delineated above, coupled with eight years (1976-present) of health physics (HP) experience at both operating (e.g., Connecticut Yankee) and shutdown (e.g., Calvert Cliffs, TMI, Peach Botton) plants' provide Mr. Bob'aa with the required background needed to establish and implement radiation protection programs. Throughout the twenty years (1964-present)
Mr. Bobba 'has been involved in the naval and comnercial nuclear industries,- he has worked in numerous supervisory positions,-
overseeing the work of professionals, journeymen and technicians.
Mr. Bobbs was ' previously the Fermi 2 General Supervisor Radwaste.
- The quoted passages are from the " Regulatory Position" portion of Regulatory Guide 1.8.
P.
~
n
- r "should have a bachelor's d gree.or ' the equivalent in a science. or
~
engineering subject, including-some formal training in radiation protection."
Mr.' Bobba has an associates degree in mechanical engineering.
s technology.' In addition,; he. attended naval technical schools, including the nuclear power school which involved HP courses ~as part of the curriculum.=
"should have at least. five years of professional experience in applied radiation protection., At least three years of this professional experience.should be in applied radiation' protection work in'a nuclear-f acility dealing with radiological problems similar to those
- encountered-in nuclear power. stations, preferably in an actual nuclear
. power station."-
' A summary of the. work which.Mr. Bobba.has either supervised or been involved with is presented in Attachment 2.
This summary indicates that he has spent eight years in the HP field and is qualified to developg and implement the Fermi 2 radiation Protection Program.-
d I
I
'l y,
-ATTACHMENT 2:
SUMMARY
OF WORK EXPERIENCES ~
10/82 present:
Fermi-15/82 - 9/82' Peach Botton provided station _ Health Physics coverage and station health; physics supervision during RWCU HX repair, NWCU pump-repair, torus modifications and other normal refueling and 4
operational HP functions.
1/82 3/82 Salen Nuclear Power Station - Contractor HP
. Supervisor - for Aux. ~ Bldg for Unit 1 outage and
,~
Unit 2 operation -
4/81 12/81 Peach Bottom provided tstion Health Physics coverage and Contractor HP supervision during sparger removal," recirculation pump motor replace--
ment, torus modifications, and other normal refueling functions.
2/81 - 4/81 Nine Mile Point Unit 1 provided project super-vision and functioned as an assistant'to the HP' supervisor during an extensive up ' grading of the station Health. Physics program responsible for, RWP compliance auditing, contractor HP technicians ~,
overall controlled area decontamination, torus' desludging, laundry and other health physics functions normal to an operational power station.
11/80 - 2/81 Calvert Clif fs. Nuclear Power Station provided '
station HP coverage during a back to back two unit refueling and' maintenance outage.
7/80 - 10/80 Nine Mile Point Unit 1 provided Health Physics consulting services to Chicago Bridge and Iron during torus saddle installation. Responsibi-lities were to minimize the adverse. impact caused
~
by radiological procedures and insure adequate protection was afforded CBI workers. Functioned as a liaison between the station radiation protec -
tion department and CBI, implemented ALARA consi-i derations throughout the project, supervised an
[.
ongoing cleanup / decontamination program thereby minimizing respiratory protection requirements.
{
7/80 Naval Reserve Active Duty - monitored submarine
^
off-crew radiological control and chemistry train-ing. Evaluated lecture content and instructor performance as required by Naval Reactors Branch, USN.
3/80 - 7/80 Peach Bottom Atomic Power Station provided sta-tion HP coverage during refueling and extensive torus decontamination and structural modifications.
l
.. -. w 1/80 - 3/80 Maine.Ycnkoo Atomic Power Plcnt pr3vid:d Ctrtiin HP coverage during refueling and pipe restraint modifications.
-11/79 Calvert Cliffs Nuclear Power Station provided station HP coverage during refueling and pipe restraint modifications.
'8/79 - 11/79 Yankee Rowe Atomic Power Plant provided station HP coverage during -fuel pool modifications and extensive feed system piping replacement.
7/79 Connecticut Yankee Nuclear Power Plant provided station HP coverage during main coolant pump seal replacement during isolated loop operation.
6/79 Naval Reserve Active Duty'- monitored USN radio-logical controls performance, conducted training seminars on civilian decontamination methods for USN radcon personnel, conducted seminars for USN medical personnel on decontamination procedures used to decontaminate people.
4/79 - 5/79 Three Mile Island provided Project supervision and HP coverage during the initial decontamination of the Unit 2 Auxiliary and Fuel Handling building from SR contamination levels down to 104 dpm contamination levels. Provided HP coverage during emergency cooling system piping modification in the fuel handling during the initial decontamina-tion period.
3/79 Maine Yankee Power Plant provided Project super-vision and contractor HP coverage of decontamina-tion of RHR spray building and cubicle. areas.
2/79 Yankee Rowe Atomic Power Plant provided Project supervision during decontamination of spent fuel pool.
1/79 Quad Cities Nuclear Power Station provided Project supervision and contractor HP coverage during desludging and decontamination of Unit 1 torus.
12/78 Nir.e Mile Point Unit 1 provided Project supervi-sion during torus decontamination and desludging.
10/78 Vermont Yankee Atomic Power Plant provided Project supervision and contractor HP coverage during decontamination of 50R reactor building floor drain system.
j 8/78 RG&E Ginna Nuclear rower Station provided Project supervision and contractor HP coverage during sludge removal and decontamination of waste holdup tank.
l 1
6 4 3 16/78 Naval Reserve 'Acdive Duty - monitored USN radio-logical controls performance, coordinated overall efforts between two shipyards and USN personnel, including radiological' controls during steam generator inspections and preoverhaul testing.
3/78 - 4/78 Hillstone Unit 1 - provided station HP coverage of reactor drywell during refueling and extensive i'
drywell ventilation system' modification.
1/78 - 3/78 Vermont Yankee Atomic Power Station - provided contractor HP coverage.during spent fuel pool rack decontamination and disposal operation.
'10/77 12/77 Connecticut Yankea Atomic Power Plant - Provided station HP coverage and contractor shif t super-vision during refueling and prassurizer piping modifications.
6/77 - 9/77 James A. Fitzpatrick Nuclear Power Station -
provided Project supervision and contractor HP coverage during extensive decontamination (including torus desludging).
4/77 - 5/77 Indian Point 2
. provided shif t supervision and station HP coverage during extensive decontamination.
3/77 Yankee Rowe Atomic Power Plant provided Project supervision and contractor HP coverage during spent fuel pool clean up operations.
2/77 Calvert Cliffs Nuclear Power Station provided Project supervision and contractor HP coverage during reactor cavity decontamination.
10/76 - 12/76 James A. Fitzpatrick Nuclear Power Station -
provided contractor supervision and HP coverage during decontamination procedural test on the reactor water clean up cystem.
5/76 - 7/76 Connecticut Yankee Power Plant provided station HP coverage during refueling i,utage.
3/76 Pilgrim Nuclear Power Station 9/71 - 4/76 Stone & Webster Engineering Corporation -
responsibilities consisted of system engineering on a project basis.
8/64 - 8/71 USN Nuclear Power Program qualified Engineering Watch Supervisor and Engineering Laboratory Technician.
9>*.
t
. Education Associate Degree, Mechan'ical Engineering Technology
~Lowell Technological Institute,~Towell, MA Miscellaneous Naval Technical Schools, including Nuclear Power School.
Exceeds-ANSI N18.1 ard ANSI /ANS 3.1 - 1981 for qualification as a Health Physics Supervisor / Radiation Protection Engineer.
/
3 E
1 4
i h
\\
I
.