Text
.
Mf
.3 REVTED CV"m~rONDE
\\
i 1
PHILADELPHIA ELECTRIC COMPANY A
2301 MARKET STREET P.O. BOX 8699 Olg E T P~
PHILADELPHIA. PA.19101 gggg JOHN S. MEMPER sneen an no an asssanca WL.. il w.'
Mr. A. Schwencer, Chief ~
Docket Nos.j0CKQijg2[8#,
Licensing Branch No. 2 50-353'ol-Division of Licensing U. S. Nuclear Regulatory Co mission Washington, D.C. 20555
Subject:
Limerick Generating Station, Units 1 and 2 Information for Auxiliary Systems Branch (ASB)
Regarding SER License Condition #7: Cmpliance with NUREG-0612 (Phase II, Heavy Ioads).
Reference:
(1) Letter, A. Schwencer (NIC) to E. C. Bauer, Jr.
(PB00), dated 2/6/84.
(2) Letter, J. S. Kmper (PECo) to A. Schwencer, dated 7/26/84
Enclosures:
(1) Limerick Overhead llandling Systems Final Report (Revision 3)
(2) Revision 3 Change List (3) Coments on the Phase II Draft Technical Evaluation Report File:
GOVT l-1 (NRC)
Dear Mr. Schwencer:
We are pleased to provide the following information to support the resolution of SER license condition #7.
Pursuant to - your request in Reference. (1), the Enclosure (1) report has been revised to address concerns identified in your draft technical evaluation report (TER) on the control of heavy loads (Phase II). 'Ihe TER was transnitted with Reference (1).
Our revised report demonstrates empliance with the guidelines of Sections 5.1.2 through 5.1.6 of NUREG-0612, " Control of Heavy Ioads at Nuclear Power Plants" (Phasa II).
Consistent with SER License Condition #7, the Enclosure (1) procedure for the mntrol.of heavy loads will be fully inplemented before startup after the second refueling outage. However, consistent with our Reference :(2) ommitments, before the standby gas treatment i
system (SGTS) is mu=cted to the refueling floor, we will handle any load over irradiated fuel in acmrdance with the appropriate Enclosure (1) procedures.
840"310007 B40818
.-P7' ADOCK 05000352
.c PDR s
w y
_ s
g
- 0 -6
.~
- t...
s
, -For your, information,: ? Enclosure (2) lists the significant
' ncdision 3 changes to our final report.
Enclosure (3) offers our owmnate and clarifications to correct' minor errors contained in the Fbase 'II draft TER..
Should any additional 'information be requ' ired, please do not hesitatd to contact us.
-Sincerely,
&JK -4
~
y;'.
~d i-h
\\
JIIA/gra/07268401 cc: See Attached Service List b
e o
e N
N P
t t
_b
[T
~,
~
f
-g-cc: Judge Lawrence Brenner, (w/o enclosure)
Judge Richard F. Cole (w/o enclosure)
Troy B. Conner, ~Jr., Esq.
(w/o enclosure)
Ann P. Hodgdon, Esq. _
(w/o enclosure)
Mr. Frank R. Romano-(w/o enclosure)
Mr. Robert:L.' Anthony
'(w/o enclosure)
Charles W. Elliot, Esq.-
(w/o enclosure).
Zori G. Ferkin, Esq.
(w/o enclosure)
- Mr. Thomas Cerusky (w/o enclosure)
Director, Penna. Emergency (w/o enclosure)
Management Agency Angus R. Love, Esq.
(w/o enclosure)
David Wersan, Esq.
(w/o enclosure)-
Robert J. Sugarman, Esq.
(w/o enclosure)
Spence:W. Perry, Esq.
(w/o, enclosure)
Jay M. (;utierrez, Esq.
(w/o enclosure)
Atomic Safety & Licensing (w/o enclosure)
Appeal Board Atomic Safety &' Licensing (w/o enclosure)
Board Panel Docket'& Service Section (w/o' enclosure)
Marthn W. Bush, Esq.
(w/o' enclosure)
Mr. James Wiggins (w/o enclosure)
Mr. Timothy R. S. Campbell (w/o enclosure)
Ms. Phyllis Zitzer (w/o' enclosure)
Judge Peter A. Morris
-(w/o enclosure) 3 j
Ni.