ML20096A166
| ML20096A166 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 04/30/1992 |
| From: | Haltiwanger J, Skolds J SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9205080117 | |
| Download: ML20096A166 (5) | |
Text
ny -7
?
[
South Carol 6na Electr6c. & Gas Company John L Sk: Ids
- ;g-P O. Box 88 wca Prmdent
[ ' ' s' J. bnsville. So 29065 Nucl2ar Operations (803) 345-4040 -
y e
4<
MAY 0 4 B92 p
Document Control Desk 0
U. S. Nuclear Regulatory Commission Washington, DC 20555 p
Attention: Director, Office of Resource Management 4" "J
-Gentlemen:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 APRIL MONTHLY OPERATING REPORT Enclosed is the April 1992 Monthly Operating Report for the Virgil C. Summer
' Nuclear Station Unit No. 1.
This submittal is made in accordance with the requirements of Technical Specifications. Section 6.9.1.10.
-If there are any questions, please call me at your convenience.
Ve y truly yours, John L. Skolds r
JWH:RJB:JLS: led Attachments c:
- 0. W. Dixon Jr.
J. W. Flitter R. R. Mahan F. Yost
- R. J. 4'hite INP0 Records Center S. O Hneter AN' Library G. " 8.under Marsh & McLennan Genecul Managers NSRC G. J. Taylor RTS. (MON 2000)
NRC Resident Inspector File (818.03-1)
J.~8. Knotts Jr.
-5,--
)
9205000117 720430 PDR ADOCK 0500 5
't.I
~ ~ ~ ' ' " "
NUCLEAR-EXCELLENCE - A SUW4ER TRADITION!
U Q,. _
Q?lD.fW, Mf
- d f-pg
- f..,-
4u..
)$.
1-r--
Director,: Office of Resource. Management-
' April' Monthly. Operating: Report
-Page 1; a
4 s
ATTACHMENT -'I
- AVERAGE.-DAILi
- UNIT POWER LEVEL DOCKET do.
50/395 UNIT V. C. SUMMER I DATE 5/ 1/92 COMPLETED BY J. W. HALT!WANGER TELEPHONE (803) 345-4297 APRIL 1992 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
- ( MWe-Me t ) :.
(NWe-Met)
'1.
892 17.
892 e
2.^
891' 18..
891
' 3 '. '
. 891.
19.
892 4.-
'890 20.
891 i,,
5.
- 8 8 2 --
21.
891 6 '.
891
.22.
890' 17.
891 2 3..-
891
-S.:
891 =
J4.-
891
'94 391--
25.
890:
210. ~.4
~891 26.
889
- 11. '.
890 2 7..
_889
.12. -
886
-28.
890 jg.7
'13.
'889 29.
889
.- 14. --
888-30.
891
.15. -
889-
'16 '
891 l
. a i
e.. -
t
(-
4 a
s
,, a
~
l Director, Office of Resource Management April Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA RF. PORT DOCKET NO.
50/395 UNIT V. C. SUKMER I DATE 5/ 1/92 COMPLETED BY J.
W.
HALT!WANGER TELEPHONE (803) 345-4297 OPERATING STATUS
- 1. Reporting Period:
April 1992 Gross Hours in Reporting Periodt 719
- 2. Currently Authorized Power Level (NWt):
2775 Max. Depend. Capacity.(Ml'e-Net):
885 Design Electrical Rating (MWe-Net):
900
- 3.-Power Level to Which Restricted (If Any)(MWe-Net): N/A 4.. Reasons for Restrictions: N/A THIS HONTH YR TO DATE CUMULATIVE 5 Number of Hours Reactor Critical 719.0 2903.0 57527.6
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 719.0 2903.0 56390.7
- 8. Ur.ft Reserve Shutdown Houts 0.0 0.0 0.0
- 9. Grocs. Thermal Energy Generated (KWH) 1992177 7937859 146506626
- 10. Gross Electricas Energy (MWH) 666500 2660570 48545969
- 11. Net Electrical Energy Generated (NWH) 639869 2552287 46099569 12.~ Reactor Service Factor-100.0 100.0 78.8
- 13. Reactor Availability Factor 100.0 100.0
'78.8
-14. Unit Service Factor 100.0 100.0 77.2
- 15. Unit Availability Factor 100.0 100.0 77.2
~
- 16. Unit Capacity Factor- (Using MDC) 100.6 99.3 71.3 17 Unit Capacity Factor (Design MWe) 98.9 97.7 70.1
-18. Unit Forced Outage Rate 0.0 0.0 6.5
- 19. Shutoowns Scheduled Over Next 6 Months (Type, Date E Duration of Each):
NONE
- 20. If Shut Down at End of Report Period, Estimated Date of Startupt N/A
- 21. Units in Test Status (Prior to Commercial Operation)t N/A
..--___m.
r
?
e Director, Office of Resource Management
, April Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOliNS AND POWER REDUCTIONS DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 5/ 1/92 COMPLETED BY J. W.
HALTIWANGER TELEPHONE (803) 345-4297 APRIL 1992 NO.
DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION / COMMENTS,
NONE 1.0 REASON A: Equipmant Failure B: Maintenance or. Test C Refueling D Regulatory Restriction E: Operator Training and License Examination F: Administrative G Operational Error H: Other-(Explain) 2.01 METHOD 1: Manual 2: Manual Scram 3: Automatic Scram-4: Continuation (Use initial-Date) 5: Power Reduction (Duration 0.0)
- 9. Other (Explain)-
l' l
l I-I
n Director, Office of Resource Management April Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 5/ 1/92 COMPLETED BY J.
W.
IIALTIWANGER TELEPHONE (803) 345-4297 APRIL 1992 V.
C. Summer Nuclear Station operated at approximately 100% power for the entire month of April.