ML20096A139

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1984
ML20096A139
Person / Time
Site: Mcguire
Issue date: 07/31/1984
From: Reavis J, Tucker H
DUKE POWER CO.
To:
References
NUDOCS 8408300509
Download: ML20096A139 (3)


Text

p m  ;

, op , ,e- ,

~

CORRECTED COPY OPERATING DATA REPORT Ni DOCKET NO. 50-370 DATE ^08-15-84

' COMPLETED BY- J.A. Reavis TELEPHONE 7nd-373-7567 OPERATING STATUS McCnire 2 Notes '* Nameplate Rating

1. Unit Name:

Julv 1. 1984 - Julv 31. 1984 (Gross MWe) calculated as

2. Reporting Period: 1450.000 MVA x .90 power

- 3. Licensed Thermal Power (MWr): 3411 r er Page lii,

4. Nameplate Rating (Gross MWe): 1305*
5. Design Electrical Rating (Net MWe): 1180-
6. Maximum Dependable Capacity (Gross MWe):. '~

.7. Maximi.m Dependable Capacity (Net SlWe):

1180

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None None

9. Power Level To Which Restricted. If Any(Net MWe):
10. Reasons For Restrictions,if Any:

This Month ' Yr to.Date Cumulative

11. Hours in Reporting Period ._

744.0 3 671.0 3 671.0

12. Number Of Hours Reactor Was Critical 400. & 1 ?u _ ? 1 ou ?
13. Reactor Reserve Shutdown flours
14. Hours Generator On.Line 492.9 3 234.1 3 234.1

== --------

15. Unit Reserse Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 558 900 10 681 629 10 681 629
17. Gross Electrical Energy Generated (MWH) 545 101 3 800 131 3 800 131
18. Net Electrical Energy Generated (MWH) 517 564 3 655 155 3 655 155
19. Unit Service Factor 66.3 88.1 88.1
20. Unit Availability Factor 66.3 88.1 88.1
21. Unit Capacity Factor (Using MDC Net) 59.0 84.4 84.4
22. Unit Capacity Factor (Using DER Net) 59.0 84.4 84.4
23. Unit Forced Outage Rate ' 33.8 9.8 9.8
24. Shutdowns Scheduled Over Next 6 Months iType. Date, and Duration of Eacht:

Refueline - January. 1985 - 8 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup: Aunust 20. 1984
26. Units in Test Status tPrior to Commercial Operation): Forecast Achieved l

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8408300509 840731 ("/77)

PDR ADOCM 05000369 co R PDR -

Gf / I

e .

DUKE POWER GOMPANY P.O. ISOx 33t89 CHARLOTTE, N.C. 28242 HALH.TUCKEW TE1.EPHONE vus _ se - (704) o73-4531

.===e - August 23, 1984

, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Re: McGuire Nuclear Station

' Docket Nos. 50-369, -370

Dear Sir:

Please find attached a corrected copy of the Operating Data Report for McGuire Unit 2 for the month of July.

Very truly yours,

$ W Hal B. Tucker JAR: sib Attachments cc: = Regional Administrator U. S. Nuclear Regulatory Commission Region II

'.01 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Phil Ross U. S. Nuclear Regulatory Commission MNBB-5715 Washington, D. C. 20555 INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 Senior Resident Inspector McGuire Nuclear Station Y%Y

'//

4

-Dir:ct:r Office of Inspection and Enforcement August 23, 1934 Page 2 cc:.'Mr.' Ralph Birkel Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555-American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, Connecticut 06032

~

M&M Nuclear-Consultants 1221 Avenue of the Americas

~New York, New York .10020 Ms. Judy.Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross,. Georgia 30092

-