ML20095K940
| ML20095K940 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/21/1995 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20095K942 | List: |
| References | |
| RTR-NUREG-1431 LCV-0603-D, LCV-603-D, NUDOCS 9512290336 | |
| Download: ML20095K940 (2) | |
Text
f
~
y O.
Georgia Power Ccmpany.
40 inverness Corrnst P?rkway Post Offee Box 1295 Birmingharn. Alibama 35201 Telephone 200 877-7122 Georgia Power j
- C. K. McCoy.
Vce Presdent. Nuclear '
Vogtle Protect tre southem electre system
_l December 21, 1995 Docket Nos. 50-424 LCV-0603-D 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 -
VOGTLE ELECTRIC GENERATING PLANT PROPOSED CONVERS!ON OF THE UNIT 1 AND UNIT 2 TECHNICAL SPECIFICATIONS BASED ON NUREG-1431 Gentlemen:
l
\\
By letter dated May 1,
. Georgia Power Company (GPC) proposed to revise the Vogtle Electric Generattn;; Plant Unit I and Uttit 2 Technical Specifications (TS). The proposed changes consisted primarily of a conversion of the existing VEGP TS to the M{'
improved Technical Specifications for Westinghouse plants as represented by NUREG-1431. Encbsed is a revision to our May 1,1995, submittal. This revision is necessary to s-reflect responses to NRC requests for additional information and our letters dated August 9,1995, (LCV-0653), September 22,1995, (LCV-0655), November 20,1995, (LCV-0670). In addition, this submittal incorporates necessary changes to allow implementation of Option B to 10 CFR 50, Appendix J.
Please note that the revision consists of complete replacements for each chapter of the original submittal with the exception of Chapter 4.0. There were no changes to Chapter
)
4.0.
C. K. McCoy l CKM/NJS
/
j, il p-mamw m py+
+
o
'fn c
7 1
4 l
l
- U. S. Nuclear Regulatory Commission LCV 0603-Dl' Page 2 -
Enclosure
. xc: Georgia Power Comnany 1
Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle State of Georgia Mr. J. D. Tanner, Commissioner, Department of Natural Resources 4
7