ML20095K299
| ML20095K299 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 12/22/1995 |
| From: | Kalman G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20095K303 | List: |
| References | |
| NPF-06-A-173 NUDOCS 9512280232 | |
| Download: ML20095K299 (4) | |
Text
_. _
_ _ ~ _ _ - - -
t
. # cay UNITED STATES E
. NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D.C. 20886 4 001
,.....j ENTERGY OPERATIONS. INC.
j DOCKET NO. 50-368 ARKANSAS NUCLEAR ONE. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.173.:
l License No. NPF-6 1.
The Nuclear Regulatory Commission (the Commission) has found that:
I A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated July 19, 1995, complies with the standards and i
requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; 1
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; j
C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; j
D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9512280232 951222 PDR ADOCK 05000368 P
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-6 is hereby amended to read as follows:
2.
Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.173, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
The license amendment is effective as of the date of issuance, to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION M
+
George Kalman nior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 22, 1995 n
4 1
i l
ATTACHMENT TO LICENSE AMENDMENT NO. 173 FACILITY OPERATING LICENSE NO. NPF-6 DOCKET NO. 50-368 4
i Revise the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contains a vertical line to indicate the area of change.
3 REMOVE PAGES INSERT PAGES 3/4 1-19 3/4 1-19 I
4
REACTIVITY CONTROL SYSTEMS ACTION:
(Continued) g.
With more than one CEA trippable but misaligned from any other CEA in its group by more than 19 inches (indicated position),
be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIPINENTS 4.1.3.1.1 The position of each CEA shall be determined to be within 7 inches (indicated position) of all other CEAs in its group at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.1.3.1.2 Each CEA not fully inserted in the core shall be determined to be OPERABLE by movement of at least 5 inches in any one direction at least once per 92 days.
l I
1
}
1
(
t SAS - UNIT 2 3/4 1-19 Amendment No. -70,4M,M9,173
.