Provides Addl Info Re Design & Installation of Emergency Diesel Generators for Units 1 & 2.Agenda Also Encl
ML20095J359
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/24/1992
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M68525, TAC-M68526, NUDOCS 9205010272
Download: ML20095J359 (3)


Text

'

y l

/ B ALTIMORE GAS AND ELECTRIC,

N 1650 CALVERT CLlrFS PARKWAY. LUSBY, MARYLAND 20657-4702 Oconor C CRCCL viet Pae sinc e,t NuttrAR Costmov April 24,1992

..ioi..

U. S. Nuclear Regulatory Commosion Washington, DC 20555 NITENTION:

Document Control Desk SUBJECT-Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 information,1 Meetines for the New Diesel Generators g

REFERENCE:

(a)

Letter from Mr. D. G. Mcdonald (NRC) to Mr. G. C. Creel (BG&E), dated Octobgr 10,1990, Response to Station Blackout Rule n

(TAC Nostf68525 andR>8526)

Gentlemen:

As requested in Reference (a), we would like to provide additional information concerning the design and installation of the new emergency diesel generators for Calvert Cliffs Units 1 and 2. The design of the new diesels and the supporting facilities has progressed to the stage where we beheve that we have beneficial informatien to provide to the Staff. Herefore, we tequest a series of informational meetings with the StalT to discuss various technicalissues. We propose meetings in the areas of scismic design criteria, ASME code requirements, mechanical and electrical design, instrumentation and controls design, and diesel sorveillance requirements. Other topics may be identified during the design process. The intent of these meetings is to provide information in advance of the submittal of the Design Report for Staff approval.

a The first issue that we are prepared to discuss is the seismic desip of the new diesel generator building. A proposed agenda for this meeting is attached. We anticipate that other meetings will follow approximately every other month. As our schedule dewlops, we will continue to discuss the timing of the meetings with yca.

Snould you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, f

O L

)

'kV "h y4lf

',8f(

'0p'l51 GCC/ PSF / psf / dim li l

Attachment n. m 9205010272 920A24 s

PDR ADOCK 05000317 I

_ _ _ _ _ _ _ _ _. _ _._ o

1 Document Control Desk April 24,1992 Page 2 cc:

D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., N RC T. T. Martin. N RC P. R. Wilson. NRC R. I. McLean, DNR J.11. Walter, PSC b

d, l'

t.

d

/

PROl'OSED AGENDA l.

INTRODUCTION II.

lil]lLDING LOCATION AND CONFIGURATION o

III.

SEISh1TC DESIGN PARAh1ETERS (SRP SECTION 3.7.1, REY. 2)

IV.

SEIS51tC SYSTE51 ANAINSIS (SRP SECTION 3.7.2, REV. 2)

V.

QUESTIONS s