Informs of Extension of Completion Date for Rev of Controlled Matls Program from 951215 to 960301,re Corrective Actions to Prevent Recurrence of Violation Noted in Insp Rept 50-346/95-05
ML20095H173
Person / Time
Site: Davis Besse 
Issue date: 12/15/1995
From: Stetz J
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1-1085, NUDOCS 9512220181
Download: ML20095H173 (1)


Text

_

[

esuvEnson ENEnGY.

f 300 Modeon Avenue John P. Slett Toledo, OH 43652-0001 Vice Preeldent. Nuclear 419-249-2300 Davis-Beses Docket Number 50-346 License Number NPF-3 Serial Number 1-1085 December 15, 1995 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555

Subject:

Extension of Completion Date For Revision of Controlled Materials Program Gentlemen:

Toledo Edison (TE) responded to a Notice of Violation (346/95005-03)

J involving inadequate control of consumable materials by letter dated August 23, 1995 (Serial Number 1-1080). The corrective actions to prevent recurrence identified in Serial 1-1080 included enhancement of the Davis-Besse Controlled Materials Program (CMP). By letter dated September 8, 1995 (Log Number 1-3610), the Nuclear Regulatory Commission (NRC) acknowledged receipt of TE's response and, at that time, identified that no further information was requested.

Further enhancements to the CMP have been identified which include the development of a new Plant Product Database such that the completion date of December 15, 1995 identified in Serial 1-1080 for revision of the CMP cannot be supported. Training of affected personnel, additional procedure changes, and installation and implementation of the Plant Product Database, as well as the originally identified j

enhancements to the CMP will be completed by March 1, 1996.

Extension of this completion date has been discussed with the Davis-Besse NRC Senior Resident Inspector.

Should you have any questions or require additional information, please contact Mr. Peter W. Smith, Acting Manager - Regulatory Affairs, at (419) 249-2366.

Very truly yours, AVA/ eld cc:

L. L. Gundrum, NRC Project Manager H. J. Miller, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector E 0 0 3 8 'i i'Y "^di Si

  • S^f*'Y " ^rd i

operating componies.

9512220181 951215 (l

l Cleveland Electnc Illuminating PDR ADOCK 05000346 0

e Toledo Edison Q

PDR

.