ML20095H117
| ML20095H117 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 12/18/1995 |
| From: | Hutchinson C ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20095H119 | List: |
| References | |
| GNRO-95-00134, GNRO-95-134, NUDOCS 9512220134 | |
| Download: ML20095H117 (2) | |
Text
_ _. _ - - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
Entstgy Opsrstions,Inc.
-::=~ ENTERGY "o scx 758 g
Ptri G bson. M3 39150 Tel 601437 2KO C. R. Hutchinson voe Fwner om n Gard cut tu a stre December 18, 1995 U.S. Nuclear Regulatory Commission Mail Station P1-37 g
Washington, D.C.
20555 Attesntion:
Document Control Desk Subj i
Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Operational Quality Assurance Manual (OQAM),
Revision 14 GNRO-95/00134 Gentlemen:
As required by 10CFR50.54 (a) (3), Entergy Operations, Inc. is submitting as Attachment 1, the Grand Gulf Nuclear Station Operational Quality Artsurance Manual (OQAM), Topical Report GGNS-TOP-1A, Revision 14.
The changes incorporated into Revision 14 are administrative in nature, reflecting primarily organizational and title changes.
These changes have been evaluated and determined not to reduce commitments contained in the previously accepted Quality Assurance Program description (OQAM, Revision 13).
Revision 14 of the OQAM continues to satisfy the requirements of 10CFR50 Appendix B and the Regulatory Guides and ANSI Standards referenced in Appendix A to the OQAM.
Identification of the specific changes, along with the reason for the change, and the basis for this conclusion as required by 10CFR50.54 (a) (3) (ii) is delineated in.
As required by 10CFR50.71, I hereby certify to the best of my knowledge, information, and belief, that the information provided herein accurately reflects changes made since the last submittal of the OQAM.
220010 Qooy t
e51 -
..,2220,.
..,2,.
PDR ADDCK 05000416 P
December 18, 1995 GNRO-95/00134 Page 2 of 3 Should you have any questicas, please contact Mr. Gary W.
Ingram at (601) 437-6736.
)
Yours t ly, j_
, af ).
/
)
CRH/WBA/ams attachments: 1)
Operational Quality Assurance Manual (OQAM),
Revision 14 2) 10CFR50.54 (a) (3) (ii) Commitment Verification cc Mr. J. Tedrow (w/a)
Mr. H. W. Keiser (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. L. J. Callan (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr.
P. W. O'Connor, Project Manager (w/2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.
20555 G951206
.