Responds to NRC Re Violations Noted in Insp Rept 50-417/84-04.Corrective Actions:Bechtel Field Welding Engineering & QC Halted Work on Field Weld 31.Nonconformance Rept NRC 6784 Initiated to Track Cited Condition
ML20095F379
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/06/1984
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20095F359 List:
References
AECM-84-2-0013, AECM-84-2-13, NUDOCS 8408270263
Download: ML20095F379 (2)


Text

S.

4 r

s'

]

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi N

P. O. B OX 164 0 J ACK S O N MIS SISSIP PI 3 9 2 05 34 Jul. 9 A9:I4 NUCLE AR LICEN$1NG & $AFETY DEPARTMENT July 6, 1984 U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323 Attention:

Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 License No. NPF-13 File 0260/16694.4 Violation 417/84-04-01, Failure to Control Welding in Accordance with Applicable Specifications, Criteria, and Other Special Requirements AECM-84/2-0013 Our response to NRC Violation 417/84-04-01, Failure to Control Welding in Accordance with Applicable Specifications, Criteria, and Other Special Requirements, is as follows:

1.

Admission Or Denial Of The Alleged Violation:

MP&L admits to the violation as stated.

2.

The Reason For The Violation If Admitted:

The welders had not been properly instructed in the special GE requirements of weld bead width for welding reactor recirculation piping. The welder failed to recognize the need to replace the malfunctioning flow meter.

3.

The corrective Steps Which Have Been Taken And The Results Achieved:

Upon identification of the excessive bead width by the NRC Inspector, Bechtel Field Welding Engineering and Quality Control halted the work on Field Weld No. 31 (Drawing FSK-P-1304-M001.0-C). Nonconformance report NCR 6784 was initiated to track and disposition the cited condition.

The NCR also noted an additional weld on the reactor recirculation piping system that was installed by the same welders.

8408270263 840801 1 ember Middle South Utilities System PDR ADOCK 05000417 C

PDR

Mr! J. P. O'Railly AECM-84/2-0013 NRC-Psge 2 The NCR has been dispositioned "use-as-is" based on the rationale that the heat input at this location of. the weld is not considered detrimental to

-the corrosion resistance at the' weld root location.

- As a result of the conditions cited-by the NRC Inspector, a meeting was held between MP&L, Bechtel, and the NRC Inspector to discuss actions to be taken to resolve the conditions.. Agreements were reached that the onlyz concern with.the shielding gas condition was the failure of the welder to recognize the need to replace the malfunctioning flowneter when the mal--

. function was identified to him. This reasoning is based on the fact that the shielding ^ and purge gases had been verified by Bechtel Field Welding Engineering, Quality Control, and the. Authorized huclear Inspector earlier on the same day the NRC Inspector observed the violation.

It was agreed that the corrective action would be limited to the training as indicated in part 4 of this response.

'MP&L QA issued CAR 2090 to track this violation.

4'.

Corrective Steps Which Have Been Taken To Avoid Further Violation:

Training was provided to velders, Field Welding Engineers, and Welding Quality Control Engineers. The training addressed welding procedures (Bechtel Specification 9645-M-183.1) and special welding requirements including General Electric. requirements for welding reactor recirculation piping.

5.

The Date When' Full Compliance Will Be Achieved:

Full compliance was achieved on May 23, 1984.

Yours truly, L. F. Dale Director

/11)C RDC:dr.

l H

cc:

Mr. J. B. Richard Mr. R. B. McGehee Mr. Nicholas S. Reynolds, Esq.

Bishop, Liberman, Cook, Purcell & Reynolds 1200 Seventeenth Street, N. W.

i Suite 700 Washington, D. C. 20036 Mr. Richard C. DeYoung, Director Of fice of Inspection & Enforcement t

,U. S. Nuclear Regulatory Commission Washington, D.C._20555 Mr. G. B. Taylor-South Miss. Electric Power Association P. 0. Box 1589 Hattiesburg, MS 39401