Forwards Corrected Figure 2.2-1 of Unit 2 Cycle 5 Rept & Core Operating Limits Rept for Unit Unit 1,Reload (Cycle 5).GE Rept GE-NE-187-62-1191,dtd Jan 1992 Entitled, Equipment Out-of-Svc in Increased Core Flow... Also Encl
ML20095C082
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/14/1992
From: Shields J
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20095C083 List:
References
NUDOCS 9204230259
Download: ML20095C082 (3)


Text

. - .. . -- - - - . . . - -

m '. Commonwsalth Edison l X ,. 1400 Opus Place l Downers Grove, lilinois 60515 April 14,1992 Dr. Thomas E. Murley, Director Office of Nuclear Reacbr Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk

Subject:

LaSalle County Station Units 1 and 2 Cycle 5 Reload and Core Operating Umits Reports NBG_DochaLNosJ0_37_3_and3_0-374

References:

(a) P.L. Piet (CECO) letter to (USNRC), dated March 18, 1992;"LaSalle County Nuclear Power Station Unit 2 Cycle 5, NRC Docket No. 50-374" (b) W.D. Arndt (General Electric) letter to J.W. Gieseker (CECO), dated December 30,1991; Equipment OOS in ICF Domain, Final Report and 10CFR50.59 Safety Evaluation, LaSalle County Station Gentlemen:

The Reference (a) letter advised you of Commonwealth Edison's review of the Unit 2 Cycle 5 reload and transmitted the Core Operating Limits Report (COLR) for the upcoming cycle. The reload review was performed under the provisions of 10 CFR50.59, and was transmitted to you for your information.

Figure 2.2-1 of the Unit 2 Cycle 5 report, Power Distribution Limits, is inaccurate. The Unit 1 Cycle 5 curve was inadvertently included in this report. A correct Figure 2.2-1 for Unit 2 is enclosed.

Additionally, Reference (b) supaorted operation with the Er.d of Cycle (EOC) Recirculation Pump Trip (RPT) and ~urbine Bypass Systems Out of-Service (OOS) in the increased Core Flow (ICF) domain with Final Feedwater Temperature Reduction for both Units 1 and 2. A copy of this report is attacned. This analysis resulted in a revised Power Distribution Limits curve for the Unit 1 Cycle 5 Core Operating Limits Raport (COLR). The revised COLR re aort is also included as an attachment to this letter. This revision to the Unit 1 Cvc e 5 COLR report was

' performed under the provisions of 10CFR50.59. and is provided for your information.

gr I l 9204230259 920414 -

ADOCK 05000373 PDR P PDR

/

0[

t A/Tv" ZNLD/1734/2 f

If[

. . - .. . ~ . _ . . - .--. -- . . - . -

4 Dr. T.E, Murley 2- April 14,1992 If there are any questions regarding this matter, please contact this office.

Very truly yours,

}p k JoAnn M. Shields Nuclear Licensing Administrator Attachments- Unit 2 Cycle 5 COLR Report Figure 2,2-1, Power Distribution Limits W.D. Arndt (General Electric) letter to J.W. Gieseker (CECO) riated December 30,1991 Unit 1 Cycle 5 COLR Report cc: A, B. Davis - Regional Administrator, Rlli B. Siegel - NRR, Project Manager

- D E. Hills - Senior Resident inspector-LCSC ZN1,D/1734/3