Discusses post-accident Sampling Sys Being Installed to Address NRC Requirements in NUREG-0737,Item II.B.3.High Radiation Sampling Sys Described in FSAR Will Be Operational on Each Unit Prior to Initial Criticality
ML20095B742
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 08/13/1984
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-TM 9072N, NUDOCS 8408220239
Download: ML20095B742 (1)


Text

_-

/#

cM../,nw.anh(5sion,

L.

r-f7), One'641 rwmnal_ Ptara._"CNint).

(

liknoes

\\

O

'? Addreet Beply to. Post Of' ice iloi 767 i C5sC4QO. lii.tiois 6069#.

,.,. f

.g i.

4, August 13, 1984 U

Mr. Harold R. Denton, Directb'r Of fice of Nuclear Reactor Reigufstion U.S. Nuclear Regulatory Commission Washington, DC 20555

.t S~ubject:

Byron Generating Station Units 1 and 2 Braidwood' Generating Station Units 1 and 2 Post-Accident Sampling System NRC Docket Nos. 50-454/455 and 50-456/457 1

Dear Mr. Denton n

operational the post-accident sa,mpl/nges/ent our schedules for making This,lecter is.provided to docu ystems being installed at Byron and Braidwood stations to address the,NRC Requirements in NUREG-0737, Item II.R.3..,' This commitment will,be incorporated into section E.21 of Appendix E of the FSAR in the next-amendment.

We understand that this letter makes sampling systems ope'ea6111ty license -conditions unnecessary.

.The high radiation sampling system described in the FSAR will be operational on_each unit prior to initial, criticality.

We understand that certain 4as sample lines are being reviewed by I&E and'NRR to determine thsirl adequacy with regard to iodine plateout.

Any modifications necessary to address that issue will be scheduled separately and woulc). probably be traclJad as an I&E open item until complete. j.

j'lebe a'ddressfrurther questions regacding this matter to this office.

t,_.,

j.[

i,/s '

E

/

Very truly yours, p v j

L'pj'2ffhm f

' ~

/

g T. R. Tramm Nuclear Licensing Administrator

),.

./