o POW 34-04 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 34-07 APPROVED BY:
/)
STATION MAN AGER l
A 8409220171 040731 PDR ADOCK 05000280 s'
f R
PDR II i
=
i j
' Section P_ age _
Operating Data Report - Unit #1 1
Operating Data Report - Unit #2 2
Unit Shutdowns and Power Reductions - Unit #1 3
Unit Shutdowns and Power Reductions - Unit #2 4
Lead Reductions Due to Environmental Restrictions - Unit #1 5
Imad Reductions Due to Environmental Restrictions - Unit #2 6
Average Daily Unit Power Level-Unit #1 7
Average Daily Unit Power Imvel-Unit #2 8
Summary of Operating Experience 9,
10 Amendments to Facility License or Technical Specifications 11 Facility Changes Requiring NRC Approval 12 12 Facility Changes 'lhat Did Not Require NRC Approval 13 Tests and Experiments Requiring NRC Approval 13 Tests and Experiments 'Ihat Did Not Require NRC Approval 14 Other Changes, Tests and Experiments Chemistry Report 15 Description of AllInstances Where hrmal Discharge Limits Were Exceeded 16,
Fuel Handllog 17,18 Procedure Revisions ht Changed the Operating Mode Described in the PSAR 19 Description of Periodic Tests Which Were Not Completed Within the Time Limits Specified in Technical Specifications 20
11 Section M
Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Mechanical Maintenance 22-24 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit # 2 - Mechanical Maintenance 26 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Electrical Maintenance 28 Maintenance of Safety Related Systems During Outage or Reduced Power Perio& - Unit # 2 - Electrical Maintenance 30 Maintenance of Safety Related Systems During Outage or Reduced Power Perios - Unit #1 -Instrument Maintenance 32 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 -Instrument Maintenance 34 Health Physics Summary 35 Procedure Deviations reviewed by Station Nuclear Safety and Operating Committee af ter Time Limits Specified in T.S.
36 l
m Pago 1 of 36 OPETATING DATA REPORT DOCKET NO. 50-280 CQfPLETED BY.y* G*G *n DATE TELEPHONE 804-357-3184
_ PERATING STATUS 0
- 1. UNIT NAME SURRY UNIT
- 1
- 2. REPORTING PERIOD 7/01/84 TO 7/31/84
- 3. LICENSED THERMAL POWER !MWT) 2441
\\ ~ ~~~ ~~~ ~ ~~~ ~ ~ ~ l
- 4. NAMEPLATE RATING (GROSS MWE) 847.5 l NOTES l
S. DESIGN ELECTRICAL RATING INET MWE) 788 6 MAXIMUM DEPENDABM CAPACITY (GROSS MWE) 811
-7 MAXIMUM DEPENDABM CAPACITY ' NET MWE) 77S
- 8. IF CHANGES OCCUR IN CAPACITY MTINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT GIVE REASONS
- 9. POWER GVEL TO WHICH RESTRICTED IF ANY N/A (NET NVE)
- 10. REASONS FOR RESTRICTIONS. IF ANY N/A THIS NONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 5111.0 101759.0
- 12. NUNBER OF HOUM REACTOR WAS CRITICAL SS6.1 3796.8 62889.7
- 13. REACTOR RESERVE SHUTDOWN HOUM 0.0 9.3 3774.5
- 14. HOUM GENEMTOR OW-LINE 553.0 3733.8 61601 0 15 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 3736*2
- 16. GROSS THEMtAL ENERGY GENEMTED (MWH) 1032229.1 8416246.9 1~43342551.2
- 17. GROSS EMCTRICAL ENERGY GENEMTED IMWH) 321605 0 2706160.0 46026003.0
- 18. NET EMCTRICAL ENERGY GENEMTED (NWH) 300179 0 2562327.0 43640063.0
- 19. UNIT SERVICE FACTOR 74.3 */*
73.1 */*
60.5 */*
- 20. UNIT AVAILABILITY FACTOR T4.3 */*
73.1 */*
64.2 */*
- 21. UNIT CAPACITY FACTOR (USING NDC NET) 52*1 */*
64.7 */*
55.3 */*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 51 2 */*
63.6 */*
54.4 *!
23.' UNIT FORCED OUTAGE MTE 0.0 7.2 */*
20.8 */ -
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS Befue11ng 9-28-84 75 Days (TYPE.NTE.AND DUMTION OF EACH)
- 25. IF SHUT DOWN AT END OF REPORT PERIOD,.
ESTIMATE DATE OF STARTUP
- 26. UNITS IN TEST STATUS FORECAST ACHIEVED
- PRIOR TO CO.9tERCIAL OPEMTION)
INITIAL' CRITICALITY INITIAL EUCTRICITY COMMERCIAL OPEMTION
,p Pago 2 of 36 OPERATING DATA REPORT DOCKET NO. S0-281 DATE O2 AUG B4 COMPLETED By V.
H.
Jones TELEPHONE 804-357-3184 CPERATING STATUS
- 1. UNIT NA!G SURRY UNIT 2
- 2. FEPORTING P"RIOD 7/01/84TO 7/31/84
- 3. LICENSED THEM44L POWER tMWT) 2441 l ~~ ~ ~ ~ ~~ ~ ~~ ~ ~~ l
- 4. NAMEPLATE RATING ' GROSS MWE) 847.S l NOTES l
S. DESIGN FJECTRICAL RATING r. NET MWE) 188
- 6. MAXIMUM DEPENDAB2 CAPACITY (GROSS MWE) 811
- 7. MAXIMUM DEPENDABLE CAPACITY ' NET MWE) 175
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS N/A IITEMS 3 T* ROUGH 7) SINCE LAST d
REPORT, GIVE REASONS
- 9. POWER GVEL TO WHICH RESTRICTED. IF ANY N/A (NET MWE)
- 10. PEASONS FOR RESTRICTIONS, IF ANY N/A THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 5111.0 98639.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 730.9 4358.3 62929.2
- 13. REACTOR RESERVE SHUTDOW HOURS 0.0 0.0 328.1
- 14. HOURS GENERATOR ON-LINE 725.7 4304.6 61880.6
- 15. UNIT RESERVE SHUTDOW HOURS 0.0 0.0.
0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 17.34983.1 10149620.1:144865493.0
- 17. GROSS ELECTRICAL ENERGY GENERATED IMWH) 549485.0 3239005.0 47033864.0
- 18. NET ELECTRICAL ENERGY GENERATED iMWH) 52012%.0 3068743.0 44575803.0
- 19. UNIT SERVICE FACTOR 97.5 e/e 84.2 */e 62.7 e/e
- 20. UNIT AVAILABILITY FACTOR 97.S */e 84.2 e/e 62.7 */e
- 21. UNIT CAPACITY FACTOR 'USING MDC NET) 90 2 ~/e 77.5 e/e S8.3 e/e
- 22. UNIT CAPACITY FACTOR (USING DER NET) 88.7 */*
76.2 */*
S7.4 */*
- 23. UNIT FORCED OUTAGE RATE 2.5 * /*
15.8 e/o 14.2 e/o
- 24. SHUTDOWNS S:HEDULED OVER NEXT 6 MONTHS FALL MAINTENANCE-11/13/84-(TYPE,DATE,AND DURATION OF EACH) 10 DAYS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATE DATE OF STARTUP
- 26. UNITS IN TEST STATUS FORECAST ACHIEVED
- PRIOR TO CO?NERCIAL OPERATION)
INITIAL CRITICALITY INITIAL ELECTRICITY COMv2RCIAL OPER4 TION
50-280 DOCKET NO.
tMIT 500UTDOWNS ANDl'0WF.R RElpOC110NS UNIT NAME Surry 1 q
- HA1E August 3,
1984 COMrl.ETED gy V.
H.' Jones REPORT MONilg July, 84 1El.ErtlONE 804-357-3184 "h
t.lcensee
[4 k
Cause A Cmieceive u
- h }Ig k1 J
i W.
Dele E
'I 4
Aethe lo goc Event a
N h
M jg Repal #
A fu g.,,,,,g g,c.,,,c, 84-8 07-21-84 8
191.0 B
1 Unit was shut down for scheduled snubber outage.
i 4
i m
1 0o*
l
-m
)
4 o
Melleml:
Exleihls G-lastsucilims I
2 m
l Mannel fos Psepasselon of Data F: Imced Messun:
w i
5: Scheduled A-Eigelenient Fellme(Esplein) 7-Menuel Sesem.
Enity $heces fm Licensee e
S.Meintessence of Test i
3 Autosustic Setem.
Event Repas (LER) File GNUREG-3 i
C Refueling 4-Olleet (Esplein) 0161)
D Regoletosy Restalcolose E-Opeistne Tesining & IJcense Emmeninethni i
F-Adadmisttotive Estelble I Sense Sousee G.Opeestional Esewe (Esplein)
P'll7)
IIOlies (Esplein)
e
.o 1
imEM.-
81 UNITsitu1 DOWNS AND POWER REDUCHONS UNIT NAME Y
.DATE August 3.
1984 V.H.
Jones COMrt,ETED OY l-REroRTMcNatt my, iaem 3,,,pp,,ans 8o4-357-3184 l
i 4
1 "h
m Lkensee
$4 Coww & Cweeceive jg
}Qc Acekne su No.,
osee E.
Event
- wq hevene Recweence g=
,y a$
gge kepine #
f
(
I 84-19 07-18-84 F
18.3 A
1 Unit was shutdown to balance the #2 L.P.
turbine due to excessive vibration. Three one pound balancing weights were added j
to the #2 L.P. turbine and the unit was returned to power. Turbine will be i
Inspected during refueling outage for reasori that caused initial vibrations.
I' j
a I
)
f j
l 1
l
[
l s
I mo ao*
i j
l I
3 4
o 1
2 i
Meelumi:
Enhihle G-latesucchms m
j F: Fmted Reason:
145aneel fi., reepeeselon =( psea v
a A-Eque enene I selme(Emplain) 5-Maineenance of Test 244enest sceeni.
Entey $lieets fw liensee 5: ScheduleJ s
os i
3 Ameonisele Sessne.
Event Repose (LER) File (NUREG-l r-Refectina D Reguleemy Restsicolon 44Mber (Emplain) 0161)
E-Oreesem Teatning & IJeense Enesminsehm 5
F-Adsuheesesselve Estelble i.Sanie Sewce G-Oresselonel Erew (Emplain) t4l77)
IlDoher(Eaplean) 1 i
Pogo 5 of 36 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO.1 MONTE: Julv. inna
- DATE, TIME HOURS-
' LOAD. MW.
REDUCTIONS. MW MWH REASON 4
NONE DCSING 'liIbREiuubG PERICO.
r J
(
/
P f
._ t
+
I.
o
..m e
s 1
-,)
<s k
,. - r
/
/ t.
t I
4-l s
i r,,,g
- I p -
1 n
o i-
'I k,
g
- ^
MONTELY TOTAL e
a
< s
.66....
__r,_
C
Pago 6 of 36 LOAD REDUCTIONS DUT TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 2 MONTE: July,1984 M,
TI!E HOURj-LOAD MW REDUCTIONS. MW MWH REASON NCH DURING SHIS Rilu cuiG PERIOD.
9 e
9 e
4 0
e e
MONTHLY TOTAL m
)
Page 7 of 36 DOCKET NO 50-280 UNIT SURRY I DATE 8-1-84 COMPLETED BY Vivian H. Jones AVERAGE D4ILY UNIT POWER LEVEL MONTH: JULY 84 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MVE-NET)
DAY U!WE-NET) 1 568.9 17 562.1 2
572.5 18 556.5 3
570.5 19 559.8 4
571 8 20 552.6 5
571.0 21 7.3 6
570.6 22 0.0 7
572.8 23 0.0 8
571.0 24 0.0 570.8" 25 0.0 9
s 10 573.4.
26 0.0 11 572.5 27 0.0 12 568.6 28 0.0 13 569.7 29 296.2 14 567.0 30 421.5 15 560.6 31-435.0 16 564.7 DAILY UNIT POWER LEVEL FOM INSTRUCTIONS ON THIS FOM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWE-NET EOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORT-ING MONTH. NOTE THAT BY USING MAXIMUM DEPENDABLE CAPACITY FOR THE NET ELEC"TRICAL
- RATING OF THE UNIT, THEP3 MAY BE OCCASIONS WHEN THE DAILY AVERAGE POLTR EXCEEDS THE 100 e/o LINE.!OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE I
DAILY WIT P0kTR CUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE A?PAPENT ANOMALY.
T, I.
Psgo 8 of 36 DOCKET NO 50-281 UNIT SURRY II D4TE 8-1-84 COMPLETED BI Vivian H. Jor.es AVERAGE DAILY UNIT POWER LEVEL
!DNTH: JULY B4 AVERAGE DAILY POWER UVEL AVERAGE DAILY POWER GVEL DAY (MVE-NET)
DAY tMWE-NET)
~
1 732.5 17 665.1 2
729.7 18 41 5 3
728.0 19 646.5 4
731.3 20 728.5 5
726.8 21 722.3 6
724.0 22 716.6 7
728.7 23 726.1 8
715.0 24 725.5 9
710.2 25 723.9 10 727.6 26 727.1 11 728.2 27 721.7 12 727.8 28 726.3 13 727.6 29 733.5 14 723.4 30 731 0 15 720.0 31 724.0 16 724.5 DAILY UNIT POWER LEVEL FOR4 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWE-NET FOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORT-ING MONTH. NOTE THAT BY USING MAXI 4UM C"?'ENDABG CAPACITY FOR THE NET ELECTRICAL RATING OF THE UNIT. THERE MAY BE OCCAS[79i WHEN THE DAILY AVERAGE POWER EXCEEDS THE 100 */o LINE (OR THE RESTRICTED POC:t EVEL LINE). IN SUCH CASES. T?R AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT AN0!'ALY.
Pago 9 of 36
SUMMARY
OF OPERATING EXPERIENCE MONTH / YEAR July,1984 l
Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE 07-01-84 0000 This reporting period begins with the unit at 80% power (610 MW's) due to rod B-6 being stuck.
07-20-84 2145 Commenced plant shutdown at 150 MW/HR for scheduled snubber outage.
07-21-84 0133 Unit off the line.
0230 Reactor shutdown.
1812 RCS < 350*/450 psig.
07-22-84 014 3 RCS < 200*F.
07-28-84 0040 RCS > 200'F.
0607 RCS > 200*F.-
2226 Reactor critical 07-29-84 0037 Unit on the line, increasing power at 3%/hr.
0731 Holding at 50% power (320 MW's) for flux maps.
1220 Commenced power increase.
1937 Holding at 60% power (390 MW's) for flux maps.
212 0 Unit at 69% power (460 MW's) after main steam reheaters placed in service, holding power for "A" main feed pump bearing repair.
07-31-84 2400 This reporting period ends with the unit at 65% power (470 MW's), holding due to MFD pump 1-FW-P-1A out of service.
l I
l
\\
Pag 210 cf 36
SUMMARY
OF OPERATING EXPERIENCE MONTH / YEAR July,1984 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT TWO 07-01-84 0000 This reporting period beings with the unit at 100% power (775 MW's).
07-08-84 0396 Commenced power reduction for load following at 150 M W's/HR.
0453 Holding power at 84% (660 MW's).
0710 Commenced power increase at 150 MW/HR.
0800
'Jnit at 100% power (775 MW's).
07-09-84 0041 Commenced power reduction for load following at 150 M W's/HR.
014 3 Holding power at 84% (660 MW's/HR).
0440 Commenced power increase at 150 MW's/HR.
0990 Unit at 100% (775 MW's).
07-16-84 0847 Turbine bearing vibrations alarming, indicating a vibration problem with #2 L.P. Turbine.
07-17-84 1930 Commenced plant shutdown at 150 MW/HR to allow balancing #2 L.P. Turbine.
07-18-84 014 9 Unit off the line.
0221 Reactor shutdown.
1525 Reactor critical.
2005 Unit on the line.
2054 Unit at 35% power (230 MW's), holding for chemistry.
2234 Commenced power increase.
2340 Holding at 60% power (420 MW's) for return of "B" main feed pump.
07-19-84 0500 Commenced power increase.
0759 Unit at 100% power (770 MW's).
07-31-84 2400 This reporting period ends with the unit at 100% power (770 MW's).
Page 11 of 36 AMENDMENTS TO FACILTrY LICENSE OR TECHNICAL SPECIFICATIONS July, 1984 NCNE DURING 'IHIS MANG PERICO.
l l
l l
l
Page 12 of 36 FACILITY CHANGES REQUIRING NRC APPROVAL July, 1984 NCNE DURING HIIS REwxruG PERIOD.
FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL NCliE DURING HIIS REPORI'ING PERIOD.
-ry
-,n,-.
w--
c-
- w
j
. ~.,.
Page 13 of 36 TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL July, 1984,
NCNE DURING WIS hn4G PERIOD.
TESTS AND EXPERIMENTS THAT I
DID NOT REQUIRE NRC APPROVAL NCNE DURING EIS REPORTING PERIOD.
~.....
Page 14 of 36 OTHER CHANGES. TESTS AND EXPERIMENTE July, 1984 NONE DURING 'IHIS REPORTING PERIOD.
l 4
I 4
1
?
e 4
t.
l r
I i
f.
l,-
k
(
L 6
f a,
l' e
E l.._
- i v-e s.
l-l I
h i
?
I; i
I i
eV.+6-E.-,e-eesame-.-
..,-4.w..
w..-
. we-e--w w w.,-
em w m m,. m y.w w, wry,_
,,___.._,w.mr,,_
y, w. w w yw-m
- y,
Page 15 of 36 POW 28-06 VIRGINIA ELECTRIC AND POhT.R COMPANY SURRY POWER STATION CHEMISTRY REPORT July 19 84 FyU COON UNIT NO. 1 UNIT NO. 2 ANALYSIS MAXIMUM MINIMUM AVERAGE MAXIMUM MINIMUM AVERAGE Gross Radioact., uCi/mi 1.89E+0 5.60E-2 9.20E-1 4.67E-1 4.62E-2 8.85E-2 Suspended Solids, pos 0.0 0.0 0.0 0.0 0.0 0.0 Gross Tritium, uCi/ml 7.65E-2 1.65E-2 4.72E-2 2.65E-1 2.45E-2 8.35E-2 (A)
(A)
(A)
Iodine 131, nCi/ml L 2.45E-1 1.42E-2 4.53E-2 7.83E-4 3.19E-5 1.84E-4 131 133 I
j7 0.47 0.19 0.35 0.77 0.08 0.19 (A)
Hvdrogen, ec/ke 39.1 3.6 24.1 47.0 26.9 33.2 Lithium, com (B) 2.12 0.60 0.96 1.28 0.98 1.10 Boron-10, com*
224 34 84 130 87 97 Oxygen, (D.O.),pom 50.005
- 50. 005 sd.005 50.005 50.005 50.005 Chloride, com 50.02 50.02 50.02 50.02 50.02 s0.02 pH 9 25'C 7.10 6.37 6 R4 6_R4 6_99 6.76
- Boron-10 = Total Boron x 0.196 NON-RADIOACTIVE CEEMICAL (C)
RELEASES, POUNDS.
T.S.
4.13.A.6 l
Boron 112 i
Phosphate i
l Sulfate Chromate n_n 50% NaOH Chlorine REMARKS: (A) Unit 1 off line frca 7-21 to 7-29 (B)Lithiun AMitinna finie 1 1 s > enne _7-o l
2987 gms. 7-21; 840 gms. 7-27; 470 gms. 7-29; Cation bed in service on 7-12 Unit 1.
Unit 2: 388 gms. 7-17; 180 ams. 7-19; Cation bed in service on 7-17. 7-25, 3 7-29 Unit 2.
(C) 'Ihe levels of these chmicals should create no adverse environ-mental inpact.
l
e Page 16 of 36 DESCRIPTIDN OF ALL INSTANCES WHERE THERMAL DISCHARGE LIhn WERE EXCEEDED July, 1984 NCNE IXJRING 'IHIS 1<.i:Tuc2IG PERIOD.
l t
-l I
l
~
Page 17 of 36 FUEL FANDLING UNIT f I
DATE NO. OF ANSI NO.
NEW OR SPENT FUEL SHIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEI NGE DURHiG 'IHIS MmuriG PERIOD.
i l
Ft/EZ, HANDZ,ING UNIT #
DATE NO. OF ANSI NO.
NEW OR SPENT FUEL HIPPED / RECEIVED ASSEMBLIES PER S$!PMENT INITIAL ENRICEMENT SEIPPING CASK ACTIVITY LEVE NCNE IXIRING HiIS REP)RTING PERIOD.
l O
Page 19 of 36 PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR July, 1984 NCNE EURIN3 'IHIS REPORTING PERIOD.
1 I
l
Page 20 of 36 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN Tus TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS July, 1984 NCNE DURING 'IHIS REPORTING PERICO.
l l
t 1
t l
1 1
i Page 21 of 36 O
e MADTTENA'4CE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. I MECHANICAL MAINTENANCE i
I i
l I-l l
t l
l
1
?f MAEnTERANCE OF SAFETE RELATED SESTEMS DURERC 00 TACE OR REDUCED POWER PERIODS Unita 1 y
- ] DEPTs MECH i
RETSERVDT SES COMP MA RKRO SUMMA RE WKPERP MR i' 01/02/8% CS SVETCR 1-CS-V-12%
LEAK ON PEPE MEPPLE
- - REMOVED CLEANED AND ENSTALLED
%DG16053G 3 fj 01/02/84 CS VA L VE 1-CS-123 LEAK OE PEPE NIPPLE REMOVED CLEANED AND J RSTALLED MEPPLE %0G160535
- 01/02/8% MS BOTTLE MA REPLACE BOTTLE M2 PRESSURE LOV REPLACED M2 BOTTLE
%06291955 s.
01/03/8% CH PUMP.
1-CR-P-1R FIX OEL LEAKS OR ELB0V-.---- ~~--- TICRTERED TITTERCS
%01010855 01/03/8% CH VALVE 1-CR-MOV-18GTC TECNTER PACKERC CLAND ADJUSTED PACKING
%0103180G 0 ' ! ~. OTin3/8% CH VA l V*
1-CH-MOV-18G1D TECHTER PACKING CLARD ADJUSTED PACKING
%Q1031805
[
01/03/8% te Disbes R/A REPLACED SWACLOK REPLACED SWACELOK RUT OM VENT LINE
%05100806
!l 01/05/8% SE VA L VE 1 -S E -MO V-18 G1 A REPACK VA L VE A DJUSTED PACKING
%01032200 lt 01/05/8% FP PUMP 1-FP-P -
SEAL LEAKINC-
- - - - - ~ ~ -- ----- - A DJUSTED PA CKIRC- -- - - -
%06301050 01/01/8% CH VA L VE 1-CH-128 RUSTE VALVE STEM / PACK CLAED ADJUSTED PACKIRC
%01050511
%D1031525 01/01/8% Si VALVE 1-SE-1G1 ACED BUELD-UP ON VALVE / CAP LEAKS --- -ADJUSTED PACKENC -
01/09/8% SE CACE 1-SE-PE-100 LEAK /ACET BUILD-UP DESASSEMRLED AND CLEAR 4010%093%
01/11/8% CH VA L VE 1-CR-VALVE-305 PACKING LEAK / ACID BUELD-UP ADJUSTED PACKERC
%01031510 g
s.
01/11/8% FP E NDECA T RA LEVEL INDICATOR SEAL LEAKEMC
-- -TE CR TEN ED SEA L ~-- --- -
%CG301100 ll 01/11/8% IA VA L VE 1-IA-TV-100 PACKEMC LEAK OE VALVE ADJUSTED PACKIRC
%01020835 01/11/8% CC VA L VE 1-CC-102A REPACK OR REPAER VALVE ADJUSTED CLAND 40G211160 g
01/11/8% CH STRA ERER 1 -CR-TK-5 FABRECA TE BASKET -
-- ~ ~~ ~ --- FA BRECATED BASKET-STRA ERER 6060901%5 01/12/84 HSS SMUBBER RA DESSAMBLE. SEUBBER AND IESPECT ENSPECTED AND DISCARDED
%0511003%
.l 01/12/8% HSS SMUBBER WA DESSANBLE ARD IRSPECT S8UBBER IRSPECTED AMD DISCARDED 405110033
~,. 01/12/8% HSS SNUBBER NA DISASSEMBLE AND EMSPECT-SMUBBER
- ERSPECTED ARD DESCARDED
%05110032 f 01/12/8% MSS SMUBBER MA DISASSEMBLE AND INSPECT SEUBBER INSPECTED AND DESCARDED
%0511C031
%05110030 MS S0V 1-NS-102A*B REPLACE BOTTLE
- - - - ------ ~~ -~~ - REMO VED EMPTE BOTTLE 60G181201 1l01/13/8%
BAD PACKENG LEAK /AQJUST DJ PACKIRC 2 FULL FLATS 401051105 ll 01/16/8% HSS SMUBBER RA DESASSEMBLE ARD ERSPECT SWUBBER TORE DOWN SMUBBER FOR IRSPECTION
%05110023
. 01/1G/84 HSS SMUBBER RA DESSAMRLE AND,IESPECT-SNUBBER TORE-90WR -SMUBBER FOR -IRSPECTION
%05110022 g'
01/16/8% HSS SMUBBER WA DESASSEMBLE AND IMSPECT SMUBBER TORE D0VE SMUBBER FOR 1RSPECTION
%05110021 01/1G/8% HSS SMUBRER RA DESSAMBLE ARO ENSPECT SNUBBER TORE D0VM SNUBBER FOR TESPECTIOM
%05110031 g
E1/16/8% HSS SMUBRER RA DESSAMRLE AND ERSPECT SNUBRER-~ ---. - TORE DOWM -SMUBBER FOR ERSPECTION
%05110036
'l 01/16/8% HSS SMUBBER RA DESSEMBLE ARD IRSPECT SRUBBER TORE DOWN SMUBBER FOR ERSPECTE0M
%05110006 g
01/1G/8% HSS SMUBBER MA DESASSEMBLE ARD IRSPECT SRUBBER DESASSEMBLED/IMSPECTED SMUBBER
%05110020 g
DESASSEMBLE ARD ENSPECT-SWUBBER --- ~~-TORE -DOVR SRUBBER FOR IRSPECTION
%D5110018 01/1G/8% HSS SRUBBER RA DESASSEMBLE AND INSPECT SRUBBER TORE 00VR SMUBBER FOR IMSPECTIOR 605110011 ll 01/1G/8% RSS SMURBER MA 01/16/8% RSS SNUBBER MA DESASSEMBLE AND IRSPECT SMUBBER TORE D0VM SMUBBER FOR IMSPECTEnn
%0511001s nn g
0 01/11/8% CV Lint 1-CV MOVED BOLTJD LENG MOVED BOLTED LERE
%0113092G V'
01/20/8% CY PEPE 3/n CV-G1+152 ROLE EM PEPE CUT GUT AND REPLACED DEFECTIVE
%01130919 01/21/8% Sk PUMP 1-SV-P-10A PACKEMC LEAK OR PUNP REPLACED SEAL
%DG102221 405041%58 o
REPLACED CASKET _)
07/22/8% CS ELANCE 1-CS--1R SUCTIOR FLANCE LEAK Vn wm 07/23/8% MSS SMUBBER RA DISSAMBLE AND ERSPECT SMUBBER TORM DOWN FOR IMSPECTION 605110015 01/23/8% SV PUMP 1-SV-P-18 EMSUFFICIEuT DESCRARCE FLOW CLEANED IMTAKE SCREEN OR PUMP
%01191311
i I'e
~ '
NAINTENANCE OF SAFETY RELATED-STSTEMS DURENG 00 TACE OR REDUCED POWER PEREODS I
URITs 1
(;
DEPts MECR RETSERVDT STS COMP MARKE0 SUMMA RE WKPERF MR
(
01/2%/8% RSS SRUBBER 1-SRP-RSS-30 TELL RESERVOIR TO 95 PERCER'T FULL-
- FELEED RESERV0ER -
401211039
=
07/2%/8% RSS SMUBBER 1-SMP-RSS-29 TEGRTEM FETTERCS TECRTER UP FETTINGS
%01211031 01/2%/8% RSS SRUBBER 1-SRP-RSS-GOB TEGRTER NOUNTING BOLTS
'TECRTER MOUNTERC BOLT N01213036
(
g - 01/2%/8% RSS SNUBBER 't-SRP-RSS-598 TEGRTEP NOURTENG BOLTS '
- ------ - TEGHTER NOUNTINC BOLT -
- %01211035 e
q - 01/2%/8% NSS SMUBSER 1-SRP-RSS-5GA TECRTER REAR BRACKET SCREV TECRTER REAR RRACKET SCREV
%0121103%
01/2%/8% RSS SEUBBER 1-SRP-RSS-t%B FELL RESERV0ER FELLED RESERV0ER
%01201328 r
91/2%/8% RSS SNUBBER NA DESASSEMBLE ARD EMSPECT SMUBBER TEAR DOWN AND EMSPECT SMUBBER
%0511002%
01/24/8% RSS SRUBBER MA DESASSEMBLE AED ERSPECT SMUBBER TEAR DOWN FOR ERSPECTIONS
%05110013 01/2%/8% RSS SMUBBER MA DESASSEMRLE AWD INSPECT SNUBBER TEAR DOWN FOR INSPECTIONS 405110012 g
07/26/84 RSS SMUBBER RA DESSAMBLE ARD ENSPECT SMUBBER ~~~ ~~ -TEAR DOWN FOR INSPECTEON
%05110028 01/2%/8% RSS SMUBBER NA DESASSEMBLE ARD EMSPECT SNUBBER TEAR 00VR FOR INSPECTIOR
%05110021 01/2%/8% RSS SMUBBER WA DESASSEMBLE AND EMSPECT SRUBBER TEAR 00VM FOR ENSPECTIONS
%0511002G g
l 07/24/84 RSS SRUBBER RA DESASSEMBLE AND ENSPECT SNUBBEk - --TEAR DOWM-FOR EMSPECTE0N
%05110025 07/2%/8% RSS SNUBBER MA DESSAMBLE AND IRSPECT SMUBBER TEAR DOWN AMD INSPECT SMUBBER
%05110035 l
01/2%/8% RSS SRUBBER RA DESSAMBLE AND IMSPECT SRUBBER TEAR DOWN FOR IMSPECTION
%05110U29 g
07/24/84 RSS SMUBBER kA DESASSEMBLE AND IRSPECT SMUBBER-TEAR DOWN FOR EMSPECT10NS
%05110001 01/2%/8% RSS SMUBBER WA DESASSEMBLE AND ERSPECT SRUBBER TEAR D0VW FOR INSPECTIONS
%05110006 01/2%/8% RSS SMUBBER WA DESASSEMBLE AND ERSPECT EMUBBER TEAR DOWW FOR ERSPECTION
%05110005 g
07/2%/8% SE VA L VE 1 -S E-MO V-18 61 A VALVE REEDS TO 88 REPACKED REPACKED VA LVE -
401010800 07/24/84 BC VA L VE 1-RC--102 PACKENC LEAK REPACKED VA LVE
%0605083%
01/25/8% CS FLANCE 1-CS-P-1A REPAER DREP LEAK OR PLANCE REPLACED CASKET
%0616063G g
%01250%01 01/25/8% SE ERLET 1-SE-MOV-18GTB VATER LEAKERC FROM LANTERN REMC ~ ~~ REPACKED VLV -
01/26/8% CS PUMP 1-CS-P-1A DESCRARCE FLANCE LEARS RET 0RQUED FLANCED BOLTS
%01250111 07/26/8% CS PUMP 1-CS-P-1A SUCTE0W FLANCE LEAKS CRECKED SUCTION FLANCE 401250110
'g 01/2G/8% MS VA LVE 1-MS--101 NEEDS REPACKED
- - - - REPACKED VA LVE
%060%1509 01/2G/8% BD ELEMENT 1-BD-TE-102R SLECRT DREP LEAK UNDER LACCERC REPLACED CASKETS 40G081922 01/2G/8% SE VA LVE 1-SE--331 VALVE RAS PACKERG LE AK TECRTEM CLAND
%0G180%39 g
01/26/8% RC VA LVE 1 -RC--% 5 REPACK VA LVE -
- -- - TECHTERED CLARD 401210%18 g
01/26/8% RC VA L VE 1 - RC-MO V-15 9 5 A DJUST PACKENG CLANDS NEED A DJUSTED
%D1210%16 01/26/8% RC VA L VE 1-RC--88 VALVE RAS SMALL PACKENG LEAK REPACKED VA LVE
%01210%%3 01/26/8% CR VA L VE 1 -CR-R V-12 0 3 INLET FLANCE IS LEAKERG INSTALLED MEV VA LVE 4012104%2 01/26/8% RC COOP 1-RC--G9 PACKENG ADJUSTMENT REQUIRED ADJUSTED PACKERC
%01210%%1 07/26/8% TV VA LVE 1-TV-RCV-155A REPACK VALVE REPACKED VA LVE
%D1192001 g
01/21/8% FW PUMP 1-FW-P-3B COUP BOLTS /MUTS CROSS THREADED-
- REPAERED COUPLENC CUARD AND
%01161%00 07/21/8% CC VA L VE 1-CC--1 CRECK VALVE LEAKS TRR0!'CR DESASSEMBLED CLEARED BLUED
%011309%9 l
01/28/8% BD VA L VE 1-80--21 PACKING LEtt REPACKED VALVE
%01230%39 on g
e 01/29/8% RR VA LVE 1-RR-MOV-1100 ADJUST PACKIRC TICRTERED CLAND
%D125012%
01/30/8% RSS SMUBBER 1-SRP-RSS-32 FEK BUSREb C FEK BUSRENG ON SMUBBER
%01250903
($
z
.01/30/8% SE SMUBBER 1 - S E-RSS-101 REEDS LOCI. NUT CM NOUNTENG
- PLACED JAM NUT 06 BOLT
%01251100 01/30/8% CR FLANCE 1 - CR-MESC-R A FLARCE LEfK/TECRTEM ORLE TEGRTEMED FLANCE 401210922 0
01/30/8% RR SMUBBER 1-RR-RSS-21 FELL RESERV0ER TELL RESERVOIR
%D1251%%5 g
01/30/8% SE SRUBBER 1-SE-RSS-228 TECRTER TURE TETTENCS TECRTEMED FETTENCS
%012%1158
(,
01/30/8% S1 SRUBBER 1-SE-RSS-20 TEGRTEM TUBE TETTENC TICRTENED TETTENCS 4012%1151 as 01/30/8% RC VA LVE 1-RC--55 REPACK VA L VE REPACKED VA LVE
%012%11%9 g
01/30/8% RSS SMUBBER 1-SRP-RSS-GB FELL RESERV0ER FELLED SMUaBER
%D1240%n8 L
.~
a
< b, NAINTENANCE OF SAFETE RELATED SESTEMS DURING-00TAGE OR REDUCED POWER PERE 00s -
l UEETt 1
('
DEPTs NECH I
jl RETSERVOT STS COMP NA RERO SUNNART WKFERF MR f 01/30/8% RC SNUBBER ~ 1-RC*RSS-158 FELL CONN 0R RESERV0ER FELLED RESERVOIR
%012%12%2 RC SNUBBER 1-RC-RSS-15%
FILL CONNOR RESERVOIR FELLED RESERV0ER
%012412%1 g.I'll01/30/8%
i.
- 1-RC RSS-122 FETTINGS 5 'SRUBBER LEAR tiCNTEttD' tiff!VCS
.%01231G30 I
01/30/8% RSS SNUBBER j 01/30/8% RC SNUBBER t-RC-RSS-123 FITTERC AND SWUBBER LEAK TECRTEMED FITTINGS 601231G21
'3 '
01/30/8% SI SNUBBER t -SE-RSS-2 3 TECRTEN FITTENCS-
~~ --
TECHTENED TETTINGS 401241159
}; 01/30/8% RR SMUBRER 1-RR-RSS 105 LEAK OE END CAPS OF RESERVOIR TECHTERED TETTERCS
%012%t2%G I
01/30/8% RC SNUBBER t -RC~ RSS -12 5 FITTENCS ARD SNUBBER LEAK TEGRTERED FETTING
%01231626 01/30/8% RSS SMUBBER '1-WAP-RSS-1%2 NEED ADDETE00AL VASRER OR-N0UNTING--- ADDED WASMER TO R00 ETE
%01231553 01/30/8% RSS SNUBBER t-WFP-RSS-9 FILL RESERVOIR / REPLACE WASRER FILLED RESERV0ER 401231552 lI
, lf 01/30/8% RC ^SMUBBER t-RC-RSS-12%
FETTENCS TO SRUBBER LEAK TECRTEE FITTING
%01231G28 FELLED RESERV0ER 401232551
, 01/30/R% RSS SMUBBER t-WAP RSS-t%3A FELL RESERVOIR -
^\\ 01/30/8% RSS SNUBBER 1-PS-MSS-2h REPLACK VERE WITR COTTER PER REPLACED COTTER PEN
%01230330 01/30/8% RC SNUBBER 1-RC-RSS-1%G TELL CONN 0E RESERV/TEGRTER FETTENCS FELLED RESERV0ER 401230301 q
- I 01/30/8% RC SMUBBER t-RC-RSS-138 FELL CONN 0N RESERV/TECRTEE-FILLENCS--TEGRTERED-FITTINGS / FILLED RESERVOIR 401230305
}( t c 01/30/8% RC SWUBBER t-RC-RSS-111
!!LL SMUBBER RESERV0ER FILLED RESERV0ER
%012%022%
- 01/30/s% RC SNUBBER 1-RC-RSS-1%1 FELL CONN 0s RESERVOIR FELLED RESERVOIR
%012313%1 l;t 01/30/8% RSS SNURBER t-SRP RSS-32 SNUBBER PER - BUBRING LOOSt - --------- A DJUSTED BUSRING
%01230020 lg I' 01/30/8% TV VA LVE 1-FW -130 VA LVE LEAKS TRRU VREW SRUT REPLACED PIPE CAP
%01222111 CR VA LVE t-CR--31%
VALVE RAS SMALL PACKING LEAK ADJUSTED PACKING AND CLEAMED
%01210%%%
l01/30/8%
01/30/8% RC VALVE 1-NC-RCV 155GA SMALL PACKING LEAK ~ ---
---A DJUBTED PACKING AND CLMANED -
401210819 1
lg l 01/30/8% RC VA LVE 1 - RC-MO V-1593 ADJUST PACKING ADJUSTED PACKING
%01210411 j
01/30/8% EPCR NC SET 1-EPL-NESC-2 UNCOUPLE / REMOVE PLEWREEL/A LECR '
COUPLED AND ALEGEED N0 TOR
%0120105%
RENOVED OLD SNUBRER 401111432 i 01/30/8% CC SMUBBER t-CC-RSS-3324 REPLACE SNUBBER
- - ~ ~ ~ ~ - - - ~ ~
l RC SNUBBER 1-RC-RSS-162 READ TRE RESERV. LVL/ REPORT TO'ENCR RESERV0ER LEVEL AT 100 PERCENT
%01191022
,g ;l 01/30/8%
l 01/30/8% RC SNUB 9ER 1-RC-RSS-1GG READ THE CONNON FLUID /RESERV0IR LVL RESERVOIR LEVEL AT 100 PERCENT
%01191021 01/30/8% RC SNUBBER 1-RC-RSS-110 READ THE FUILD RESERV0ER LEVEL----- RESERV0ER LEVEL AT 100 FERCERT
%01191020 I'? 01/30/8% RC S$UBBER t-RC-RSS-150 TELL CONN 0W RESEkv0ER FILLED RESERV0IR
%012%12%0
+
4 01/30/8% RSS SNUBBER 1-VCC-RSS-02 FELL RESERV0ER FELLED RESERVOIR 4001212%0
): 01/30/8% RSS SMUBBER t-WCC-RSS-03 FELL RESERV0ER
- FILLED RESERV0ER
%012%12%a J g Ii 01/30/8% RSS $NUBBER 1-VAP-RSS-1%18 FILL RESERV0ER FELLED RESERV0ER 401231550 g
i
- t 01/30/8% RSS SNUBBER t-SRP-RSS-1 TECRTER FETTIRCS AND FILL RESERV TECRTENED FETTENCS / FILLED RESERVOIR %01231G05 I'
01/30/8% SE SNUBBER 1 SE-RSS-25 TECRTEN FITTING OR TUBE- ~~ ~~
- TEGRTENED FITTERCS
%012%1201 e
01/30/8% SE SNUBBER 1-SE-RSS-21 FELL REDRAULIC FLUID RESERVOIR FELLED RESERV0ER N01241209 ll
%012%0%0%
on
01/30/8% RSS SNUBBER t-WFP-RSS-1 FELL RESERV0IR UWABLE TO ADO ARE FLUID 401240%02 e
01/30/8% RSS SNUBBER 1-VFP-RSS-15 FILL SMUFRER RESERVOIR FILLED RESERV0IR
%012%0228 6'
t 01/30/8% RSS SMUBBER 1-SNP-RSS-38 FELL SMUPBER RESERVOIR FELLED RESERVOIR 401240221
- ~
01/30/8% RSS SMUBBER 1-SRP-RSS-58 FELL SNUBBER FELLED SNUBBER
%0124022G 01/30/8% RSS SNUBBER 1-SRP-RSS-9 FILL REMOTE RESERV0IR FELLED RESERV0IR N012%0225 o
m LJ 0%
,i !
4
Page 25 of 36 a
MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 MECHANICAL MAINTENANCE
NA ENTENANCE OF SAPETT RELA TED STSTEMS DUREMC QUTAGE. 0R REDGCED POWER PERE 0DS UNITS 2 l
- l DEPTs t'ECH
.s RETSERVDT STS COMP MARKN0 SUMMART VEPERP NR I
il l
01/11/8% CS ' VA L VE 2-C$-GG VALVE LEhKS BT/htth1R OR REPLACR PLACED PIPE ChP 00 DRAIM
%01120833
'l 91/19/8% SW PEPE 2 SV 11G-21R N0 BRACE /NESSENG PEPE SUPPORT REPLACED BRACE
%01122300 0
206011%05 8
306211120 I
I fl If l
l!
'?
~,,. _ _
,l 1
I
?
s.
I
?.
l.
N 0,0 M
O He f
4.4 I
e
Page 27 of 36 MAINTENANCE OF SAFETY RELATED SY5rrEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 ELECTRICAL MAINTENANCE t
4 l
l I
-~
MAINTENANCE OF SAFETE RELATED SEST8MS DURINC OUTACE OR REDUCED POWER PERE 0DS UNETs 1 DEPTs ELEC CETSERVDT STS COMP MA RKN0 SUMMART VKPERF MR 01/02/8% CW VA L VE 1 - CV-MO V-10 00 VALVES TORQUES OUT INVESTICA TE VALVE CLOSED SAT IN BOTR
%06262311 I
I f
01/11/8% RP UNDICA T l-RP-N9 CHECK COEL T N 5 NUT 5 kN NOW M-09
~T0dk RE55 STANCE READENCS OH 406221335 01/12/8% VS CHILLER 1-VS-E-%A REPAER CABLES FOR COMPRESS 0k ADD REAT SHRENK TO ENDS OT 4011910%$
01/1%/8% SE VA L VE 1-SE-MOV-18698 REPLCE 3 NISSENG BOLTS / CASKET REPLACED NESSENG BOLT
%011301%$
01/23/8% SE VA LVE 1-SE-MOV-18%2 REPA1R/REPLACK FLEX TECRTERED TLEE COMMECTOR 6071301%G 07/21/8% SW 1 -S V-P - 10 A DISCON/RECOM NOT0h FOR MECR DISCONNECTED / RECONNECTED MOTOR
%01210901 01/2%/8% TW VA L VE 1-FW-NOV-151D REPLACE 1 15CH %5 DECREE COMMECTOR REPAERED TLEX TO LINET SWITCH
%06200605 01/25/8% RD VALVE 1-BD-TV-100C WRONC INDECATION ADJUST LEMETS CECLE/ SAT
%D1210950 01/25/8% CR TAKK 1-CR-TK-5 DEECAND RECOM DISCONNECT AND RECOMMECT/ COMPLETE
%01221000 01/2G/8% RP BREAKER 1-RP-BKR-A/B REPLACE TENING CIRCUITRE REPLACED LEADS ON RTA AND
%D1201231 I
01/26/8% RS PUNP t-PS-P-tn A ROTAtte R L!CRT !$ OR/tkP etr
- ntS0lDtht0 hM0 KEN VERE 40616233G 01/2G/8% RC V! BRA TIO 1-RC--VIB/A MONET0R SPIKED TRER RETURNED NORM REPLACED Pr0 REMET 0R N0D0LEAND
%D105105%
01/2G/8% RN MONET0R 1-RM-RI-128 MO CREEN LIGHT PROBLEM PAS CLEARED ETSELF AMD'
%01080109 01/26/8% TV BREAKER 1 - TV-MO V-151 A INCREASE OVERLOADS TO SEtt 102%
REPLACED OVERLOADS WITH CORRECT SIZE %01251001 01/26/8% TV BREAKER 1-FW-MOV-1510 REPLACE OVERLOADS WITH 818E 102%- -- -REPLACED OVERLOA DS WITH CORRECT
%D125100%
01/26/8% TV RREAKER 1 - TV-MO V-151 R REPLACE OVERLOADS VITH SEEE 102%
REPLACED OVERLOADS WITH CORRECT SE3E 401251002 01/26/8% FW BREAKER 1 - FW-MO V-1517 REPLACE OVERL0 ADS VITR SEEE 102%
REPLACED OVERLOADS WITH CORRECT SEEE %01251006 01/2G/8% TV RREAKER 1 - TV-NO V-151 E REPLACE OVERLOADS WITH SESE 102%
REPL ACED OVERLOA DS WITR CORRECT SEZE 401251005 01/26/8% RC VA LVE 1 - RC-M0 V-15 3 5 VALVE WELL NOT OPEN INSTALLED NEW TORQUE AND TESTED SAT %012G115%
01/21/8% FW RREAKER 1-FW-BER-151D PERTORM TEP 5 PERFORMED TEP-5 BREAKER 607211235 W
00 so CD O
Pb s,a m
9
I Page 29 of 36 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 ELECTRICAL MAINTENANCE 8
l l
Page 30 of 36 July, 1984 NCNE DURING 'IHIS REPuxru1G PEICD.
-e
--,.,n--,.-.-----,
e I
Page 31 of 36 9
4 MAENTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 INSTRUMENT MAINTENANCE 6
I l
l t
i t
l
.... -. -... -,,.,. - -,-... - ---., ~ -, -, -,,,.... - -.. -
I i,
t
'I' NAINTEMARCE OF SAFETT RELATED SESTEMS DURINC QUTAGE DR REDUCED POWER PERIODS
!l
&#ETs 1 DEPTs INST l
l RETSERVOT STS COMP MA RKN0 SUMMA RE WKPERT MR t
~ - ---- BG MECR STUCK AND CARNOT DESLODGED
%061%11%1 01/02/86 RC R0D 1-RC-1RPI B-G R0D STUCK AT 30 STEPS ---
HS VA L VE t -MS - PCV-10 2 9 REMOVE /ERSTALL EMSTRUMENTATION REMOVED AND REENSTALLED
%060n0100
,l01/02/8%
l 01/02/8% MS VA L VE 1 -MS - PCV-10 2 A DEMOVE/EMSTALL EMSTRUMENTATION REMOVED AMD ERSTALLED
%06080102 l-01/02/8% MM RECORDER MA DOES MOT PRENT OR STRIP-REC -------- --REPL ACED PRINT REA D AMD 606250538 RESET FAILUBE CODE 406230653 s; 01/02/8% CV MONETOR 1-CV-RE-130-2 MONET0R FAELED
'ls 01/02/8% RP ENDE CA T 1-RP1-N-9 ENDECATIon DRETTED TO 30 STEPS' PROBLEM EN COMMECTOR EW 406230633 1; 01/01/8% CR VMS MA READJUST 2ERO SETTENC ~ ---- - -- --- - REA DJUSTED S ERO ROG2815%0 01/05/8% RM MONETOR 1-RM-RE-160 FLOW FAULT LOCKED ER REPAERED LOOSE TITTING ON
%01020850 01/05/8% CR ENDECA T 1-CR-LE-161
% TO 5 PERCENT DEVIATE 0W REPLACED RESTRICTOR ASST AND
%062G0%28 01/05/8% VC MONE TOR ' RM-VC-131 CRECK N0M E TOR - REA D0V TS ------- ---
REPLACED CHART PROM
.- n01031%11 01/06/8% RM NOME TOR 1-RE-RMS 121 TROURLE ALARM LOCKED ER TOURD NO PROBLEM
%01020G52 i 01/06/8% RM MONET0R 1-RM-RC-131-2 WARMING ALARM NOT SET PROPERLE RESET ALERT SETP0ENT
%01050531 01/06/8% CV ANALTEER 1-CV-R2k-10%
PERPORM CAL-115
- - - - - - -. ----- - PERPORMED KWRP 15 3-1 -2 /CA L 115
%06121100 01/10/8% RC TRA NSME T 1 - RC-TT-1 -% 3 5 VERT TRANSMITTER EQUALEZED AND VERTED TRAWSMITTER
%06291%03 g
01/13/8% TP PUMP 1-TP-P-2 CALIBRATE TEMPERATURE CACE CHECKED CAL OR CACE OPS SAT
%06301121 i* 01/13/8% RC PPESSURE 1-RC-PT-% 55 - CHARWEL READERG RECR/CALEBRAT$
CHECKED-ISQLA TOR AMD A DJUSTED n01010520 lj 01/13/8% MI RANCE 1-ME-SR-32 RECEEVENG SPERES QM ENDEC REPLACED SCR AWD CAPACET0R IW THE
%010%1%25 i: 01/13/8% RM INK PADS 1-RM-RR-100 REPLACE ENK PADS REPLACED EME PADS 401111138 I* C1/13/8% RM RECORDER 1-RM-RR-150 DOESM'T PRENT PROPER-NUMBRAS
CLEARED CONTACTS
- %01111112 II 01/19/8% RP BANK 1-RP-ERPE-M-9 ERPE ERRATIC CHECKED OPERATE 0R/ CHECKED ' SAT
%01080%00 l
01/19/8% SE INDECATO 1-SI-PT-931 RECA LEBRA TE CHECKED ENDECATOR/ SAT
%01120052 CRECKED ENDECATOR/ SAT
- %01120051 g 01/19/8% SE ENDECA TO 1-SE-PT-9 29 RECALEBRATE -- - - - - - -
7-~~~~
14 01/19/8% CC CA UCE 1-CC-PE-139A DESCHARCE PRESS CAUCK PECCED RE REPLACED CACE
%01020155
) 01/19/8% RC MONE70R 1-RC-MOM-B MORITOR COMTEMUQUSLT BLOWS FUSES REPLACED SHORTED TAR AMD BLOVM
%01160710 l 81/20/8% CS CRAMMEL 1-CS-LE-1000 CALEBRATE CHEV kVST CRARMEL - - - - - A DJUSTED ENDICATOR PER P12 s19A
%01180115 t 07/23/8% RM MOMETOR 1-BM-M-159 ALARk SETP0 INT LESS TRAR ENTO TAG CRECKED AND A DJUSTED SETP0ENTS
%012006%1 6 01/23/8% RC EMDECA TO 1-RC-VMS-101B VA LVE FLASRES VETH VA LVE CLOSED ADJUSTED SENSITIVITT
%01190255 07/2%/8% CR CUACC 1-CR==
, GA CE REA DS REGR
~ - ~ ~ ~ -~ ~- -- - - - CA LE BRA TED CA UGE - -
%05312130 iI 07/2%/8% EC DETECTOR 1-EC-- 3 REPLACE DETECTOR REPLACED DETECTOR 406191%16 07/25/8% RM MONITOR 1-RM-MESC-1110 RED MONITOR REC MOT LEMEER REPLACED READOUT MODULE
%010G1%00 i' 01/25/8% SI VA L VE 1 -SE-RCV 18 9 8 SMA LL A ER LEAK AT SWEDCELOCK-TOURD NO A ER LEAKS
%06092109 ll 07/25/8% ME PANEL 1-NE NESC-UPPER EON CHAMBER DEV. A LA RMS RESCALED VE'S 4011011%1 U 07/2G/8% RV COMPA RA T 1 -RP -TC-% 3 2 0 COMPARATOR VELL ROT TREP REPLACED COMPARA TOR
%01191%29 61 01/2G/8% RE MONETOR 1-RE-MESC-151 MORITOR 1R CRTL-RM-SPEKINC-RECR RAD-- REPLACED DETECTOR no1131G18 lI 07/26/8% CR CIRCUET 1-CR-E-C AUTO RATP'S WOM* T REMAIM EK FAST MORITORED OVER A 2%RR PERE 00
%01100556 li 07/2G/8% RC VA L VE 1-RC-PCV-1% 5 5A AIR LEAK REC IRLET TECRTENED ENLET AND QUTLET N06092020 sl 01/2G/8% RC MODULE 11-RC-LC-%15
. MODULE OUTPUT ERRATEC REPLACED ARD CALERRATED DUAL 6012502%9 e
ll La I l b3
- l. '.
o p
b3 6
j 0%
0 I
s e
~.l,
t>
-. r
+,
e
{ '., f '
1
~
t t
t
),
Page 33 of 36 s
\\
I s
s) i
/?
s s
l
- .M_AINTENANCE OF SAFETY RELATED SYSTEMS DURING
'c f OUTAGE OR REDUCED POWER PERIODS I
UNIT NO. 2 i
INSTRUMENT MAINTENANCE k
f e
V a
I
{
(
/
i*
6
(
\\
f i /
(
(,
l l
l l
l
\\
.(
j I
o y:
i
-?
4 f.
'/ '
h I f
, { ['
- i l
\\.
f
\\
6
}
l
\\
i
- /
,s t
h
\\
l
?
t
1 (l
1 llll l'
o
~
>0f Wk O% Wm QD
, ~
. n 4
n 4
1 1
5 1
7 0
4 T
AS D
K KCK NC SD O
O R
I K
R E
E D
P N
RE A
W N
m O
A P
P e
S e
m D
D e
4 E
K C
e U
r T
D a
S e
e.
e m
E
- t U
N R
. P
. K R
V A
e
. O s
k g
e
~
E e
. G e
A T
e 0
=
t.
0 y
e G
A f
E2 e
R r
Ue DT T
W I
n e
$N
+
a MU h
E' T
T S
Y h
g S
i i
D l
ET s
A d
T.
a E
e R
TR R T
A T
M e
E n v F
u a A
s T S
fO EC M
s
/
o R
0
=
E s -
T u c N
n a 9
I A
A M
2 M
Rrpm e o n c o c C a s
rs es Ts T
u D
=
z v s
R
/
t 9
u T
s 1
r T
/
t s
7 l
I lll o a o
r s
Page 35 of 36 HEALTH PHYSICS July, 1984
'Ihere was no single release of radioacitivity'or radiaticn exposure specifically associated with an outage that acctxinted for more than ten percent of the allowable annual values in 10G R20.
A
' n e '%
\\
A
>t 9
j t
'b k
\\
s l
s 1
t.
\\
- t-
e 4
e Paga 36 of 36 PROCEDURE DEVIATIONS REVIEWED BY STATION NUCLEAR SAFETY AND OPERATING COMMf! TEE AmR TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS s
July,1984
~
Number Unit Title Date Date Rev.
Deviated g SNSOC M MP-C-G-160 1, 2 Corrective Maintenance Procedure 6-17-8 4 7-24-84 for Limitorque Valve Operator Size SMB-00 C AL-LW-55 1
Calibration Procedure for 6-24-84 7-10-8 4 F-LW-104A Liquid Waste Effluent EWRP 84-153-1 2
Catalyst Bed Assembly Replacement 6-12-84 7-10-84 Procedure for COMSIP, Inc. Model K-III Containment H2 Analyzers (H2 A/GW 104-01 or 204-1)
MOP 7.18 2
Return to Service of 2-CS-P-1A 6-12-84 7-5-84 l
l t
e VIRGINIA ELECTRIC AND PownM COMPANY RIcnwonn,VIROINIA 20261 W.L.Ssawkes w,,$'[do"',[E,,,
August 15, 1984 Mr. Maurice R. Beebe Serial !!o. 498 Office of Resource Management N0/JDH:acm U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington,-D. C. 20555 50-281 License Nos. DPR-32
Dear Mr. Beebe:
DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of July, 1984.
trulygours, b,'_
W. L. Stewar Enclosure (3 copies) cc:
Mr. R. C. DeYoung, Director (12 copies)
Office of Inspection and. Enforcement Mr. James P. O'Reilly (1 copy)-
Regional Administrator Region II Mr. D. J.' Burke.
NRC Resident Inspector Surry Power Station ff+hk
.