ML20094S278
| ML20094S278 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/02/1992 |
| From: | Miller D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20094S280 | List: |
| References | |
| NUDOCS 9204140302 | |
| Download: ML20094S278 (1) | |
Text
___
LCCN W97.-MO42 5gM"M PillLADELPIIIA ELECTRIC COMPANY r
kdhk
- PtACil BOTIOM KlOMIC POWI:R STATION R.' D 1,ik n 20M
% liiM Delta, Pennsylvania 17314
- Pau.m norTois-1wa com aa or tusnrw$
017)456-7014 D. B. Miner, Jrf Vice President April 2, 1992 Docket No. 278 -
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SUBJECr:
Peach Bottom Unit 3 _ insenice inspection
Dear Sir:
In accordance with the Philadelphia Electric Company Second Ten-Year Interval Insenice inspection Program, inservice inspections (Isis) were completed on Unit 3 during the September 14,1991 through January 9,1992 refueling outage, Enclosed is the ' Summary Report for the September 14,1991 to January 9,1992 Periodic Inspection" (NIS 1) and the ' Summary of ASME Repairs and Replacement Completed * (NIS-2).This report is required per Technical Specification 6.9.2.b.
-Sincerely, W6 DBM/MJB/,
/lph-f.
-v 1
Enclosures -
cc:
R. A. Duricelli. Public Senice Electric & Gas (w/o enclosures)
T. M. Gerusky, Commonwealth of Pennsylvania (w/o enclosures)
J. J. Lyash, USNRC Senior Resident Inspector R. I. McLean, State of Maryland (w/o cnclosures)
T. T. Martin Administrator, Region I, USNRC II. C. Schwemm. Atlantic Electric (w/o enclosures)
J.__ Urban, Delmarva Power (w/o enclosures)
J. L. Warren, liartford Steam Boiler (w/ enclosures)
Chief Boiler Inspector, Commonwealth of Pennsylvania (w/ cnclosures)
I 9204140302 920402 PDR ADOCK 05000278 j{
)
O PDR
\\
l m
__