Responds to from Jr Gray Containing Copy of Demand for Infor Transmitted 941110 to NPPD Re Actions Taken During 930309 Refueling Outage
ML20094R001
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/09/1994
From: Jantzen H
NEBRASKA PUBLIC POWER DISTRICT
To: Lieberman J
NRC OFFICE OF ENFORCEMENT (OE)
Shared Package
ML20094Q932 List:
References
FOIA-95-262 NUDOCS 9512040229
Download: ML20094R001 (2)


Text

L e 2L3 y=~' racM """t!c - DIcctcc="_

Nebraska Public Power District Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 December 9, 1994 Mr. James Lieberman Director, Office of Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Lieberman:

The purpose of this letter is to respond to the letter I received from Mr. Joseph R. Gray of your office dated November 10, 1994, which contained a copy of the Demand for Information (DFI) transmitted to the Nebraska Public Power District (NPPD) by letter dated November 10, 1994. As noted below, my recollection is very limited regarding the approval by the Station Operations Review Committee (SORC) on March 9, 1993 of changes to procedures governing reactor pressure vessel (RPV) disassembly. Nevertheless, I feel a responsibility to respond to your office's request.

Exclanation of SORC's Action

- I was a member of SORC o March 9, 1993 as

,e nstrumentation and Control Superviso s and approved the subject procedure changes. However, there was no seaarate I&C technical review of the proposed changes. (I worked for[3obert Brundgar(]at the time.) Accordingly, I did not need to initial my concurrence with the changes on the procedure change notice. I recall few details from the March 9th SORC meeting. At the time, I believe that I was not aware of the earlier procedure changes in 1991.

Back in 1993, SORC tended to function as a management meeting without detailed technical review. However, I do not recall how the meeting on March 9 was conducted. Since that time, NPPD has made a number of improvements in the functioning of SORC, including specific training for SORC members. In hindsight, with the additional training I have since received as a member of SORC, I likely would have focussed more intently on the proposed procedure changes on March 9, 1993 even though they were not in my area of expertise. In addition, in hindsight it m have been app riate for SORC to have specifically addressed (chtUick F (the ssistant Engineering Managgd( concerns with the propose (9 proch ure changes, even though I do not recall him identifying any j

, . M,hu ',

9512040229 951122 l '

PDR FOIA j 1 PATTERS95-262 PDR

+, .

Mr. James Lieberman December 9, 1994 Page 2 information that necessarily would have changed SORC's decision.

From my recollection of the events, including review of related documents, I believe that SORC's decision to approve the procedure changes was appropriate.

Explanation Why NRC Sanctions Are Inanorooriate I believe that no sanctions against me personally are warranted in connection with the November 10, 1994 Demand for Information issued to Nebraska Public Power District. I believe SORC acted appropriately on March 9, 1993 in approving the subject procedure changes. Any sanctions against me would impair my ability.co pursue a career in the nuclear power industry, in which .

I ha made a significant investment professionally, including abou 5 years in nuclear power with Nebraska Public Power Distri t at t e Cooper Nuclear Station as Instrument and Control Superviso I have attended a number of related engineering and management related courses over the years, including several technical courses by General Electric Co. pertaining to GE Boiling Wat r eactors, N-Reactor operations, instrument maintenance, etc. , my present capacity as Instrument and Control Supervisor, I oversee and direct the work activities of the I&C Department to ensu safe, reliable and efficient operation of Cooper Nuclear Statio I af firm that this letter is true and correct to the best of my knowledge and belief. I hereby request that this letter be withheld from placement in the NRC Public Document Room and from disclosure pursuant to 10 C.F.R. S 2.790.

Sincerely, MrianA. Jantze -

Sworn to and subscribed hpeforemethisl[dayof h , 1994. )

i kh.L 4ut.J -

Notary [Public { l My Commission Expires: NNWM MrMNCBAnusmous  ;

ho , 1 l 1998 ___