Text
<
Commonwealth Idwin Company firantwom! Generating Station Route #1, llox 84 liraceville. 11.60407 % I9 TclHI04 W 2801 a
November 27,1995 BW/95-0115 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Comed Braidwood Station Unit 1 Fifth Refuel Outage Steam Generator Inservice Inspection Report Docket No. STN 50-456
References:
(1) Letter BW/95-0110 from Comed's Braidwood Statior. to U.S. Nuclear Regulatory Commission, Category C-3 Report per Specification 4.4.5.5.c dated November 13,1995 Gentlemen:
In the " Corrective Measures to Prevent Recurrence" section of the referenced letter, Comed indicated it will not continue the Secondary Side Boric Acid program for Braidwood Unit 1 Cycle 6. Since this time, Comed has reversed this decision.
Braidwood Unit I will continue the Secondary Side Boric Acid program at least until its mid-cycle outage. This program willinclude boric acid soaks during unit startup along with on-line addition during normal power operation. Comed's evaluation of the Secondary Side Boric Acid program during Unit 1 Cycle 5 determined that the program is not detrimental to the Steam Generator tubes.
Please direct any questions regarding this decision to Doug Huston, Braidwood Licensing Supervisor, (815) 458-2801, extension 2511.
Very truly yours, A
. J. Tulon N
Station Manager Braidwood Nuclear Station TJT/DG/dla l
obw/s.teno\\bwdletts. doc cc: Sr. Resident Inspector-Braidwood
'*'*****'*i'*"*"***"**
01011 a" Regional Administrator, Region III (q047 9512010256 951127 dD PDR ADOCK 05000456
,.Q
.PDR A Um,com (omp...my
_