Requests That Encl Page to Fire Hazards Analysis (FHA) Rev 11A Be Use,If Last Page of FHA Rev 11A Sent to NRC on 951120 Blank
ML20094P892
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/22/1995
From: Chastain E
SOUTHERN COMPANY SERVICES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511300213
Download: ML20094P892 (3)


Text

.

Southem Company Sent:es, Ir:c. -

Post Ofte Box 3625 Braingham, Alabama 35202 Telephoto 205 8704011 -

L Southern CompanyServices the soutrem electrc system i

4 Date: November 22,1995 l

Re:

Georgia Power Company's Edwin I. Hatch Nuclear Plant Fire Hazards Analysis Revision 11A From: Elizabeth T. Chastain Publications Services Southern Company Services,Inc.

To:

U.S. Nuclear Regulatory Commission Document ControlDesk Washington,DC 20555 If the last page of the Fire Hazards Analysis revision that was sent to you on November 20 is blank, please use the enclosed copies instead.

If you have a question, please call me at 205 870-6774.

Thank you.

500024 9511300213 951122 PDR ADOCK 05000321

  1. , h 1 x___

_eo.

TABLE 1.6-1

(}

UNIT 1 AND COMMON FIRE H0SE STATIONS (SHEET 1 0F 2)

LOCATION FLOOR ELEVATION H0SE RACK NUMBER A.

Control Buildina 1.

East Corridor 412'-0" HS-C01 2.

Working Floor 112'-0" HS-C02 3.

Working Floor 112'-0" HS-C03 4.

East Cableway 130'-0" HS-CIO 5.

South Corridor 130'-0" HS-C11 6.

North Corridor 130'-0" HS-Cl2 7.

Cable Spreading Room 147'-0" HS-C20 8.

CO, Tank Room 147'-0" HS-C21 9.

Outside Control Room 164'-0" HS-C30 10.

Control Room 164'-0" HS-C31 11.

Outside Control Room 164'-0" HS-C32 12.

Control Room Roof 180'-0" HS-C40 B.

Reactor Buildina

/\\

1.

NW Corner Room 97'-0" HS-R01 l

2.

HPCI Pump Room 87'-0" HS-R02 3.

NE Corner Room 87'-0" HS-R03 4.

SE Corner Room 87'-0" HS-R04 5.

SW Corner Room 87'-0" HS-R05 6.

Torus Room 87'-0" HS-R06 7.

Torus Room 87'-0" HS-R07 8.

Torus Room 87'-0" HS-R08 9.

Torus Room 87'-0" HS-809 10.

NW Corner 130'-0" HS-RIO

11. NE Corner 130'-0" HS-R11
12. SE Corner 130'-0" HS-R12 13.

SW. Corner 130'-0" HS-R13

14. Working Floor - North 158'-0" HS-R20
15. Working Floor - East 158'-0" HS-R21
16. Working Floor - South 158'-0" HS-R22
17. Working Floor - North 185'-0" HS-R30
18. Working Floor - East 185'-0" HS-R31
19. Working Floor - South 185'-0" HS-R32 20.

SW Corridor 185'-0" HS-R33

21. Working Floor 203'-0" HS-R40

-22.

Working Floor 203'-0" HS-R41 23.

Refueling Floor 228'-0" HS-R50 24.

Refueling Floor 228'-0" HS-R51 k's-)T 25.

Refueling Floor 228'-0" HS-R53

26. SBGT Filters 164'-0" HR-R01 B-22 Rev 0 06/86, Rev 3 07/88, Rev 5 07/90, Rev llA 10/95

o TABLE 1.6-1 (SHEET 2 0F 2)

W LOCATION FLOOR ELEVATION HOSE RACK NUMBER C.

Turbine Buildina 1.

Condensate Pump Area 112'-0" HS-T01 2.

East Corridor 112'-0" HS-T02 3.

NW Corner Swgr. Area 130'-0" HS-TIO 4.

East Cableway 130'-0" HS-T11 5.

East Cableway 130'-0" HS-T12 D.

Intake Structure 1.

MCC Area 111'-0" HS-D01 2.

PSW Pump Area 111'-0" HS-002 3.

PSW Pump Area 111'-0" HS-D03 0

l l

l i

l 9

06/86 Revision 0 07/88 B-23 Revision 3 l