Requests Extension for Submittal of Summary Rept for Capsule Matl Pulled from Reactor Vessel During Refueling 4 on 910411.Current Submittal Due on 920411.Requested Extended Submittal Date 921130
ML20094P786
Person / Time
Site: Waterford 
Issue date: 04/02/1992
From: Burskimr F
ENTERGY OPERATIONS, INC.
To: Murley T
Office of Nuclear Reactor Regulation
References
W3F192-0052, W3F192-52, NUDOCS 9204080307
Download: ML20094P786 (2)


Text

.

y g

E ENTERGY a--

A. F. BursM W3F192-0052 A4.0E QA I

April 2, 1992 U.S. Nuclear Regulatory Commission ATTN:

Mr. Thomas E. Murley, Director, Office of Nuclear Reactor Regulation Washington, D.C.

20555-

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 10CFR Part.50 Appendix H.III.A -

Reactor Vessel Material Surveillance Program Requirements - Report of Test Results

Dear Mr. Murley:

The. subject requirement states that a summary of Reactor Vessel

~

capsule-test results.is to be submitted to the NRC within one year after capsule-withdrawal trom the reactor.

Waterford 3 is hereby

. requesting an extension for s"hmittal _of a summary report for capsulu material pulled from the unctor Vessel during Refuel 4 on April _11, 1991.

The submittal is currently due on April 11, 1992.

The requested extended submittal-'date is November 30, 1992.

Test results ' from the contracted test facility (B&W) are now estimated to be complete in mid August 1992.

The test results will then be reviewed and evaluated. The summary will be prepared and submitted to the NRC by November 30, 1992.

During contract negotiations with the test facility in December 1991, the facility indicated that it would not be able to support

-the proposed, March 1992 completion date.

The facility could support a completion date of seven months after receipt of the capsule at their technology center.

The capsule.was rr. moved from the Spent'Puel Storage Pool, installed into the shipping cask and

-secured to the trailer for shipping on December 5, 1991.

Although the capsule had been received by the test facility in December 1991, _

_ testing did not begin until February 1992 due to prior

!i contract' agreements for other testing at the test facility.

Other contributing factors to the requested extension include delays incurred in obtaining the test facility contract, and difficultias

[jd[

9204080307 920402 PDR ADOCK 05000382 P

PDR

t W3F192-0052 10CFR Part 50 Appendix H.::II. A -

Reactor Vessel Material Surveillance Program Requirements-Report of Test Results Page 2

{

April 2, 1992 incurred in arranging for shipping of the capsule.

Efforts are continuing to provide the summary prior to the requested extended submittal date.

Waterford 3 is still a relatively new operating plant, and it is anticipated that the requested additional analysis time, in this case, will not impact the operation of the plant.

Experience gained in processing this first sample capsule at Waterford 3 will be instrumental in avoiding delays in future submittals.

Very truly yours, j n r$

i s

RFB/ OPP /ssf cc:

R.D. Martin, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds NRC, Document Control Desk NRC Fesident Inspectors Office