t ENTERGY OPERATIONS,INC.
- j RIVER BEND STATIONf j
l ANNUAL ENVIRONMENTAL OPERATING REPORT (NONRADIOLOGICAL)
August 29,1994 - August 28,1995 i
i l
l i
l Prepared by:
Reviewed by:
0 i &G%>
-AuA Al Owsd S.dtoma P. W. Chapman l
/
Sr. Environmental Specialist Environmental Coordinator (Acting) l l
)
P i
Reviewed By:
Approved by:
r h
}
b AQuu mA i L J. lid lmes' ~ ~)'
M. B. Sellman l
Chemistry
- General Manager Plant Operations
)
i 93_11290219 951121 PDR ADOCK 05000458 6
B-~
_.._. _fDR_.m l
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 TABI E OF CONTENTS PAGE
1.0 INTRODUCTION
/ OBJECTIVES......
I 2.0 ENVIRONMENTAL PROTECTION ISSUES..
1 2.1 Aquatic Issues...
2 2.2 Terrestrial Issues.
2 2.3 Noise Issues.
2 3.0 CONSISTENCY REQUIREMENTS.
2 3.1 Plant Design and Operation..
2 3.2 Reporting Related to NPDES Pemiit and State Certification.
4 3.3 Changes Required for Compliance with Other Environmental Regulations.
4 4.0 ENVIRONMENTAL CONDITIONS.
5 4.1 Unusual or Important Environmental Events...
5 4.2 Environmental Monitoring.
5 4.2.1 Aquatic Monitoring..
5 4.2.2 Terrestrial Monitoring...
5 4.2.3 Noise Monitoring.
5 5.0 ADMINISTRATIVE PROCEDURES.......
6 5.1 Review and Audit.
6 5.2 Records Retention.
6 5.3 Changes in Environmental Protection Plan.
6 5.4 Plant Reporting Requirements.
6 5.4.1 Routine Reports.
6 5.4.2 Nonroutine Reports.,
7 i
...___._. _.~. _ ___ _. -._ _..._. _ _ _
i l
RIVER BEND STATION s
ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 LIST OF TABLES i
i PAGE
~
Table 1.
Nonroutine Reports to Federal and State Environmenta!
Regulatory Agencies..........................................
8-l i
f Photointerpretation Report: A.B rie f A eri al.......................................... 9
' Photography Analysis of River Bend Station l
i L
I i.
I i
1 i
J 1
l 5
i
]
t i
i ii
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 l.0 INTRODUCTION / OBJECTIVES The Annual Environmental Operating Report for the period of August 29,1994 (anniversary of
.j license issuance) through August 28,1995, is submitted in accordance with Subsection 5.4.1 of' Appendix B to River Bend Station Facility Operating License Number NPF-47.
i i
I River Bend Station (RBS) consists of a 936 MWE General Electric boiling water reactor located on a 3,342 acre site in West Feliciana Parish, Louisiana. 4,1 km (2.5 MI) southeast of St. Francisville.
- Waste heat from RBS is dissipated via systems using five mechanical draft cooling towers which draw makeup water from the Mississippi River,3.3 (air) km (2.0 MI) to the southwest. Blowdown from the normal cooling tower system is discharged to the Mississippi River through a submerged pipe about 200 meters (660 ft) downstream from the makeup water intake.
Appendix B to the RBS operating license is the Environmental Protection Plan (Nonradiological),
i or EPP, which has the following principal objectives:
i 2
1.
to verify that the facility is operated in an environmentally acceptable manner, as established in the Final Environmental Statement Related to the Operation of River i
{
' Bend Station (NUREG-1073, commonly referred to as the FES-OL) and other Nuclear Regulatory Commission (NRC) impact assessments 2.
to coordinate NRC requirements and maintain consistency with other Federal, State, and local requirements for environmental protection i
3.
' to keep the NRC infonned of the environmental effects of facility construction and operation and of actions taken to control these efTects.
2.0 ENVIRONMENTAL PROTECTION ISSUES in the FES-OL dated January 1985, the NRC staff considered the environmental impacts associated with the operation of River Bend Station Unit 1. Certain environmental issues were identified which required study or license conditions to resolve environmental concerns and to assure adequate protection of the environment.
1 i
i PAGE1 I
l RIVER HEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 ~
2.!.
i;natic Issues No specific aquuie issues were' identified by the NRC staffin the FES-OL. Environmental concerns which rela e to water quality are regulated by way of the facility's National Pollutant Discharge Elimination System (NPDES) Permit and Louisiana Water Discharge Permit.
2.2 Terrestrial Issues Salt drift deposition from the normal cooling towers may cause changes in, or damage to, nearby vegetation on_ RBS property (FES-OL Section 5.5.1). A monitoring program to identify the extent of impacts and the mitigative actions necessary, if any, is specified in EPP Section 4.2.2.
2.3 Noise issues Operation of the normal cooling towers, the service water cooling tower and mam station transformers at RBS may increase noise levels at nearby residences (FES-OL Section 5.12).
A monitoring program to identify the extent of impacts and the mitigative actions necessary, if any, is specified in EPP Section 4.2.3.
}
3.0 CONSISTENCY REOUIREMENTS 3.1 Plant Design and Oneration In accordance with the EPP, RBS personnel prepare and record an environmental evaluation of any proposed change in plant design or operation or performance of any test or experiment which may significantly alrect the environment. Such evaluations are not performed on activities which do not afTect the environment or are required for compliance with non-NRC environmental regulations.
The environmental evaluation process is administered through programs governing design modification and the development / revision of written procedures. Before engaging in additional construction or operational activities which may significantly affect the environment, a determination is made and recorded as to whether any proposed change involves. an Unreviewed Environmental Question Determination (UEQD). A proposed activity involves a UEQD if it concems:
a) a matter which may result in a significant increase in any adverse environmental impact previously evaluated in the FES-OL, environmental impact appraisals, or in any decisions of the Atomic Safety and Licensing Board; PAGE2 J
=.
RIVER BEND STATION -
ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 b) a significant change in effluent or power levels; or c) a matter, not previously reviewed and evaluated in the documents specified in (a) above, which may have a significant adverse environmental i
impact.
If the activity meets any of these criteria it must either not be performed as proposed or a written evaluation must be prepared and submitted for prior NRC approval.
During this reporting period two modifications were completed which were evaluated for their environmental impact under the design modification program referred to above.
In MR 95-0007 a UEQD was made that addressed the following environmental issues surrounding this proposed modification:
i
- 1. influents and effluents associated with the new Wastewater Treatment Plant
- (WWTP).
- 2. demolition'and disposal of the existing Sewage Treatment Plant (STP).
' 3. new utility system tie-in locations for domestic Water and Circulating Water Blowdown supply lines for the new WWTP.
Based on the results of the Safety Analysis Environmental Evaluation (SAEE), the potential indirect afTects to safety related structures, Systems or Components proved, conclusively, no introduction of any Unreviewed Safety Question (USQ). The UEQD concluded that the EPP will not be affected by the changes made by MR 95-0007. Therefore, based on results of this SAEE, there is no UEQ nor any adverse degradation in the effectiveness of the Environmental Protection Plan (EPP).
i In MR 93-0005 an SAEE was perfomied to evaluate the environmental impact of the installation of seven oil free electric air compressors as a source of station instrument air.
The following environmental issues were reviewed during the c valuation:
- 1. the impact of condensate discharge to the station permitted storm water outfall 006.
7
- 2. the possible environmental impact associated with air emissions.
1 PAGE3
)
i 1
I
4 RIVER BEND STATION l'
ENVIRONMENTAL OPERATING REPORT FOR 1994!!995
' The UEQD concluded that there was no significant impact to the environment as a result of the changes made in MR 93-0003. Therefore, based on the results of the SAEE, there is no UEQ or degradation in the effectiveness of the EPP.
i The records of these environmental detenninations are maintained in the Station Permanent Plant File as part of documentation associated with the modification request program and/or the procedure development system.
Renorting Related to NPDES Permit'and State Certification
[
3.2 i
Violations of the NPDES and Louisiana Water Discharge permits have been reported to the NRC via copies of the nonroutine reports sent to the other agencies pursuant to permit requirements (see Table 1),
j i
On January 27,1992 River Bend submitted to LDEQ a renewal application with i
modifications for Louisiana Water Discharge Permit No. WPO409. Subsequently, the station has submitted to LDEQ five letters which conta:n supplemental information and i
operational change requests. River Bend Station continues to comply with the terms and L
conditions of the previous pemiit, per LDEQ guidance, which was to expire on May 28, j
1992.
3.3 Changes Reauired for Comnliance with Other Environmental Regulations i.
During the period covered by this report the changes in plant design or operation and 1
performance of tests or experiments required to achieve compliance with non-NRC environmental regulations were:
l
- 1. four additional cmergency diesel generators providing back-up electricity during power failure were added to the station Louisiana Air Emission Permit No. 3160-00009-01, which became effective December 16,1994.
- 2. station water discharge permit letters of no objection were issued by LDEQ to allow chemical treatments using a non-oxidizing biocide to control zebra mussel i
infestations in the station make-up water system.
1 PAGE4 i
i
)
d I
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 4.0 ENVIRONMENTAL CONDITIONS 4.1 Unusual or Imnortant Environmental Events During the period covered by this report there were no unusual or important events, causally related to RBS operation, which resulted in significant environmental impacts.
4.2 Environmental Monitoring 4.2.1 Aauatic Monitoring.
Water quality monitoring was perfbrmed in accordance with the requirements established in the station's NPDES and Louisiana Water Discharge pennits.
Results were documented in monthly Discharge Monitoring Reports and nonroutine reports (Table 1), as required, submitted to the USEPA and LDEQ.
4.2.2 Terrestrial Monitoring. - Subsection 4.2.2 of the EPP requires monitoring by aerial photograph beginning two years prior to cooling tower operation and during the fbilowing first and third years of operation. This requirement was completed in 1989 when the " third year" set of stereo color infiared transparencies were monitored. During this reporting period River Bend Station perfbmied terrestrial monitoring with aerial photography, and expanded this monitoring to address a licensing commitment to monitor fbr and report the existence of new oil and gas wells and pipelines within 2 miles of the plant. No changes in vegetative j
communities or individual trees, attributable to salt drift impacts, was indicated.
The only loss of vegetative communities observed was associatc j with the construction of the new WWTP and the low level radwaste building constructed to the North of the substation and just south of the clarifiers. No changes in the number or size of wellheads, pipelines or transmission line right-of-ways were identified within 2 miles of RBS. The photo interpretation report is provided as.
4.2.3 Noise Monitoring. - The requirement to conduct an environmental noise monitoring program (EPP Subsection 4.2.3) was completed during 1986/87 and the results were included in the second Annual Environmental Operating Report. In general, the acoustic environment in the vicinity of RBS proved to be substantially PAGE5
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 more complex than anticipated, but neither the magnitude ofincreases attributable to plant operation nor community reaction exceeded FES-OL predictions.
5.0 ADMINISTRATIVE PROCEDURES 5.1 Reviewand Audit Entergy has provided for independent review and audit of compliance with the EPP. The main group responsible for audits of EPP-related activities, the RBS Quality Assurance Department, reported directly to the Director - Nuclear Safety during the period covered in this report. All findings identified during the reporting period were satisfactorily resolved and did not indicate a significant deterioration on the activities being audited 5.2 Records Retention Records and logs relative to environmental aspects of plant operation and audit activities are retained in the RBS Pennanent Plant File. These records and logs are available to the NRC on request. Records of modifications to station structures, systems, and components determined to potentially affect the continued protection of the environment will be retained for the life of the plant. Other records, data, and logs relating to the EPP will be retained fbr five years or, where applicable, in accordance with the requirements of the USEPA and LDEQ.
5.3 Changes in Environmental Protection Plan There were no requests for changes to the EPP during the period covered by this j
report.
5.4 Plant Renorting Requirements 1
1 5.4.1 Routine Renorts. - This Annual Environmental Operating Report was prepared to meet the reporting requirements of EPP Subsection 5.4.1 for the period from August 29,1994, through August 28, 1995. Summaries and analyses of the results of monitoring programs, including comparisons with related pre-operational studies, operational controls, and previous reports are presented in Section 4.2 above. During the period of this report there were no indications of significant harmful elTects or evidence of trends toward irreversible damage to the environment causally related to the operation of River Bend Station.
PAGE6
illVElt HEND STATION ENVillONMENTAL OPEllATING ItEPOllT FOlt 1994/1995 5.4.2 Nonroutine Itenorts. - All nonroutine events from August 29,1994, through August 28,1995, that were reportable were identified to other federal, state, or local agencies in accordance with their reporting requirements in lieu of requirements of EPP Subsection 5.4.2 (see Table 1).
PAGE 7
.- ~
/
i RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 TABLE 1
' NONROUTINE REPORTS TO FEDERAL AND STATE i
ENVIRONMENTAL REGULATORY AGENCIES DATE TYPE REC 1PIENT(S)*
DOCUMENT 09-09-94 Letter USCOE RBG-40,867 10-25-94 Letter LDIill RIlG-40,983 11-21-94 Letter LDEQ RBG-41,073 11 21-94 Letter USEPA RBG-41,074 12-06-94 Letter USEPA RBG-41,084 12-06-94 Letter LDEQ RBG-41,085 12-07-94 Letter LDilH RBG-41,089 21-94 Letter LDEQ RBG-41.135 02-14-95 Letter LDHH RBG-41,199 02-14-95 Letter LDEQ RBG-41,198 02-17-95 Letter LDEQ RBG-41,161 05-16-95 Letter LDEQ RBG-41,527 09-19-95 Letter LDEQ RBG-41,981
- Agency abbreviations: USEPA =
U. S. Environmental Protection Agency (Region VI)
Louisiana Department of Environmental Quality DEQ
=
LDHH =
Louisiana Department of Health and Hospitals USCOE =
United States Army Corps of Engineers PAGE 8