Discusses Schedule for Implementation of Emergency Preparedness Personnel Accountability Project Which Will Address Concerns Identified in Insp Rept 50-354/89-14,per .Implementation of Project Scheduled for Nov 1993
ML20094P500
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/31/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLR-N92027, NUDOCS 9204080183
Download: ML20094P500 (2)


Text

...

Public Service Docthe and Gas

~-

Cornpany Stanley LaBruna.

PutAc Servo Doctoc and Gas Com;wiy P O Box 036. Hancocks Drdge. th 06038 WM39 200 vu ww-t - tww oum w MAR 31 1992 NLR-N92027 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Gentlemen:

SCHEDULE FOR EMERGENCY PREPAREDNESS PERSONNEL ACCOUNTABILITY-PROJECT SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272,_50-311, AND 50-354 In accordance with Public Service Electric and Gas (PSE&G) letter (NLR-N91213) dated December 30, 1991, an approved personnel accountability project will provide a system design-change package with a target schedule for implementation of November 1993.

The project schedule includes detailed engineering, equipment procurement, installation, testing, acceptance, and procedure updates to meet the targeted completion date.

This project:will address concerns identified in Inspection Report 50-354/89-14 and allow PSE&G to consistently account for personnel as a-result of an emergency and meet NRC time guidelines.

As noted in our previous letter (NLR-N91213) interim corrective actions were instituted to reduce the time required for accountability.

Should you have any questions regarding this matter, please do not hesitate to contact us.

Sincerely,

- o ff&w'"

47 C 600.1

/Ah 92040001e3 920331 PDR ADOCK 03000354

' O b-l G

PDR t.

I MAR 31 19T Document Control Desk 2

NLR-N92027 C

Mr. T.

T. Martin, Administrator - Region I U.

S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J.

C.

Stone, Licensing Project Manager - Salem U.

S.

Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr.

S.

Dombek, Licensing Project Manager U.

S.

Nuclear Regulatory Commission MS 14 E-21 Washington, DC 20555 Mr.

T. P. Johnson (SO9)

USNRC Senior Resident Inspector Mr..K.

Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of' Nuclear Engineering CN 415 Trenton, NJ 08625 l

l l

i.

i