ML20094P427

From kanterella
Jump to navigation Jump to search
Submits SG Tube Plugging Rept,Per Completion of Eddy Current Testing on 920307 During 13th Refueling Outage.To Date SG a Has 55 Plugged Tubes & SG B Has 54 Plugged Tubes
ML20094P427
Person / Time
Site: Fort Calhoun 
Issue date: 04/03/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-92-127, NUDOCS 9204080119
Download: ML20094P427 (1)


Text

~

_ w.

wJ-.

--me...

e e.,

w

.-i.-

...~.d...f..c

. H. f y.)..

..7-i g L

.-D'.3..ff.} -l.

~

p E

Ornaba Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 April 3, 1992 LIC-92-127 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Statfor: P1-137 Washington, DC 205S5

Reference:

Docket No. 50-285 Gentlemen:

SUBJECT:

Steam Generator Tube Plugging Report Fort Calhoun Station's (FCS) Technical Specification 3.17(3)(i) states, "Following each in-service inspection of steam generator tubes, the r: umber of tubes plugged in each steam generator shall be reported to the Commission within 30 days". On March 7, 1992, during the Thirteenth Refueling Outage at FCS, eddy current testing wt.s completed. As a result of this testing, and in accordance withTechnicalSpecification3.17(5)(i),OmahaPublicPowerDistrictreportsthat no steam generator tubes required plugging. To date, Steam Generator (S/G) A has 55 plugged tubes and S/G B,is 54 plugged tubes.

If you should have any questions, please contact me.

I!V. b. h W. G. Gates Division Manager Nuclear Operations i-WGG:lah c:

LeBeouf, Lamb, Leiby & MacRae l

io D. Martin, NRC Regional Administrator, Region IV l

b. L. Wiggington, NRC Senior Project Manager S. D. Bloom, NRC Project Engineer l

R. P. Mullikin, Senior Resident Inspector l

9204080119 920403 PDR ADOCK 05000285 p