ML20094N494
| ML20094N494 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 04/02/1992 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | Pierson R NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19354F218 | List: |
| References | |
| EEN-9246, NUDOCS 9204060391 | |
| Download: ML20094N494 (1) | |
Text
__
~
~
~
I GE Nuclear Energy t'
April 2 1992 MFN No.076 92 Docket No STN 52 001 EEN 9246 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Robert C. Pierson, Director Standardization and Non Power Reactor Project Directorate
Subject:
GE Responses in the Resolution of Selected issues Related to AllWR DSER Chapter 19 (SECY 91-309)
Reference:
Submittal of Amendment 4 to GE's AllWR SSAR, MFN NO. 05-84, dated January 31,1989 Submittal of Amendment 8 to GE's ABWR SSAR, MFN NO. 052 89, dated July 28,1989 Enclosed are thirty four (34) copies of the GE responses to SECY 91-309 Confirmatory item 2, Open item 6 and partial response to Open item 18.
Please note that this material contains information that is designed as General Electric Company proprietary information. This raaterial relates to the Chapter proprietary information that was previously sent to the NRC via the above referenced letter and their corresponding proprietary affidavits.
It is intended that GE will amend the SSAR in these 1 ises in a future amendment.
Sincerely, 0
,[
fh 9
j.
P.W. Marriott, Manager Regulatory and. Analysis Services
.}
i M/C 444, (408) 925-6948 (D
cc:
[ l,, sy(4 p
N. D. Fletcher (DOE)
J. A. Kudrick (NRC) k @-
C. Poslusny, Jr.
(NRC) l R. C. Berglund (GE)
J. F. Quirk (GE) h 070001 1%
wousgD MMb PDR A
PDR A
,