ML20094M931

From kanterella
Jump to navigation Jump to search
Provides Addl Info Re Emergency TS Change Request 184, Incorporating F* SG Tube Repair Criteria.Rept 51-1239602NP-00, Point Beach 2 Repair Roll Qualification, Encl
ML20094M931
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/17/1995
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094M934 List:
References
VPNPD-95-093, VPNPD-95-93, NUDOCS 9511270298
Download: ML20094M931 (1)


Text

,y m

e Wisconsin Electnc POWER COMPANY 231 W Michigon. PO Box 2046. Milwaukee.WI S3201-2046 (414)221 2345 VPNPD-95-093 10CFR50.4 10CFR50.90 November 17, 1995 Document Centrol Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P2-137 Washington, D.

C.

20555 Gentlemen:

DOCKETS 50-266 AND 50-301 ADDITIONAL INFORMATION REGARDING EMERGENCY TECHNICAL SPECIFICATIONS CHANGE REOUEST 184 INCORPORATION OF F* STEAM GENERATOR TUBE REPAIR CRITERION POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 On November 9, 1995, we submitted Technical Specifications Change Request 184, " Incorporation of F* Steam Generator-Tube Repair Criterion."

Enclosed with that submittal was the proprietary version of B&W Nuclear Technologies (BWNT) Document 51-1239602-00,

" Point Beach 2 Repair Roll Qualification Report."

We stated in our November 9, 1995, letter that we would forward a non-proprietary version of the report under separate cover.

This letter forwards BWNT Document 51-1239602NP-00, the non-proprietary version of the above mentioned report.

If you require additional information, please contact us.

Sincerely,

..)

Bob Link Vice President Nuclear Power KVA Attachment cc:

NRC Resident Inspector NRC Regional Administrator 1

9511270298 951117 PDR ADOCK 05000266 AsubsMm ofHisamhEwarCorporadon l