Monthly Operating Rept for Oct 1995 for Wolf Creek Generating Station
ML20094L205
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/31/1995
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-95-0165, WO-95-165, NUDOCS 9511200100
Download: ML20094L205 (7)


Text

_ _.

i*

W4pLF CREEK NUCLEAR OPERATING CORPORATION i

Otto L. Maynard Vece President Plant Operations November 13, 1995 WO 95-0165 U. S. Nuclear M gulatory Commission ATTN: Document Control Desk Mail Station P..-137 Washington, D.

C.

20555

Subject:

Docket No. 50-482:

October, 1995, Monthly Operating Report Gentlemen:

Attached is the October, 1995, Monthly operating Report for Wolf Creek Generating Station.

This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours,

/N W f d/

Otto L. Maynard OLM/jad Attachment

]

cc:

L.

J.

Callan (NRC), w/a W.

D. Johnson (NRC), w/a J.

F. Ringwald (NRC), w/a J.

C.

Stone (NRC), w/a 9511200100 951031 PDR ADOCK 05000482 R

PDR PO Boa 411/ Burkngton, KS 66839 / Phone- (316) 364-8831

/

p

'/

An L' quai Opportunity Employer M f /HC/VE1 L/

)

s.

Attachment to WO 95-0165 Page 1 of 6 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH:

October YEAR:

1995 Docket No.:

50-482 Facility Operating License No.:

NPF-42 Report No.

128

,,Atta6hmsnt to WO 95-0165 1

SUMMARY

The following report highlights the operating experience of Wolf Creek Generating Station for the month of October, 1995.

This report is being provided pursuant to Technical Specification 6.9.1.B.

I.

SUMMARY

OF OPERATING EXPERIENCE The unit operated at or near 100% power, Mode 1, through the month of October, 1995.

II.

MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES NONE i

I e

i

.i j

1 i

Wolf Creek Generating Station Monthly Operating Report October, 1995 page 2 of 6 4

l I

i Atta6hment to t*O 95-0165 OPERATING DATA REPORT DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 11-7-95 TELEPHONE 316-364-8831 OPERATING STATUS 1.

Reporting Period:

October, 1995 Gross Hours in Reporting Period:

745 4

2.

Currently Authorized Power Level (MWt) :

3565 Max. Depend. Capacity (MWe-Net): 1167 Design Electrical Rating (MWe-Net) :

1170 3.

Power Level to Which Restricted (If Any) (MWe-Net) :

N/A 4.

Reasons for Restriction (If Any) : N/A l

This Month Yr. to Date Cumulative l

5.

Number of Hours Reactor was Critical 745 7,184.7 73,152.8 6.

Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.

Hours Generator on Line 745 7,161.1 72,315.7 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 t

9.

Gross Thermal Energy Gener:ted (MWh) 2,637,097 25,119,287 240,151,605 10.

Gross Electrical Energy Generated (MWh) 918,721 8,689,358 83,453,573 11.

Net Electrical Energy Generated (MWh) 881,779 8,325,548 79,700,222 12.

Reactor Service Factor 100.0%

98.5%

82.1%

13.

Reactor Availability Factor 100 0%

98.5%

82.5%

14.

Unit Service Factor 100.0%

98.2%

81.2%

15.

Unit Availability Factor 100.0%

98.2%

81.2%

16.

Unit Capacity Factor (Using MDC) 101.4%

98.1%

78.8%

17.

Unit Capacity Factor (Using Design MWe) 101.2%

97.5%

76.5%

18.

Unit Forced Outage Rate 0.0%

1.8%

4.8%

19.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):

Refuel VIII outage is scheduled to begin approximately March 1, 1996.

20.

If Shut Down at End of Report Period, Estimate Date of Startup:

N/A Wolf Creek Generating Station Monthly Operating Report October, 1995 Page 3 of 6

Att'cthm3nt to WO 95-0165 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 11-7-95 TELEPHONE 316-364-8831 j

MONTH October, 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1183 17 1186 2

1183 18 1185 3

1103 19 1176 4

1184 20 1185 5

1183 21 1186 6

1178 22 1186 7

1183 23 1186 8

1185 24 1186 9

1185 25 1186 10 1184 26 1186 11 1183 27 1172 12 1176 28 1181 13 1182 29 1187 14 1186 30 1188 15 1186 31 1187 16 1185 Wolf Creek Generating Station Monthly Operating Report October, 1995 Page 4 of 6

Attachment to WO 95-0165 UNIT SHUTDCWN AND POWER REDUCTIONS DOCKET NO.

50-48

WOLF CREEK GENERATING' STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 11-7-95 TELEPHONE 316-364-8831 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours)

(1)

OR REDUCING POWER (2)

N/A N/A N/A N/A N/A N/A N/A

SUMMARY

The unit operated at or near 100%

1, for the month of October, 1995.

1)

REASON: A: EQUIPMENT FAILURE (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE
2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)
3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD

9. OTHER i

Wolf Creek Generating Station l

Monthly Operating Report October, 1995 Page 5 of 6 I

t

,,.Atttbhm:nt to WO 95-0165 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH October, 1995

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT N/A N/A N/A Wolf Creek Generating Station Monthly Operating Report October, 1995 Page 6 of 6