ML20094L148
| ML20094L148 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/29/1992 |
| From: | Elms A, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MP-92-250, NUDOCS 9203240374 | |
| Download: ML20094L148 (5) | |
Text
,
)
NORTHEAST UTILITIES o.n..i com + c.ea $*n e 'na c-*ou
'.75C[2I.,'2. 7[I.17 d
]
P o BOX 270 wa.....a.. u **~
H# RTFORD CONNECTICUT D61410270
.'77.!(C.'.C.7 E7.';
4 03) 66 0 6000 L
'J March 10, 1992 MP-92-250 Re: 10Ci R50.71(a)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Reference:
f acility Operating License No. NPf-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of technical specifications Section 6.9.1.5, the Millstone Nuclear Power Station Unit 3 Monthly Operating Report 92-03 covering opera-tion for the month of February is hereby forwarded.
Very truly yours, NORTHEASI NUCLEAR FNLRGY COMPANY
]/ij,n/??
Stephen l. Scace
/
v.
facc-
/
t Director, Millstone Station Attachment cc: T.T. Martin, Region 1 Administrator W.J. Raymond, Senior Resident inspector, Millstone Unit Nos.1,2 & 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3
) 11 [h v
. m,m,
-f
.f 9203240374 920310 g ll\\
PDR ADOCK 05000423
.R PDR
\\
- *** hkC trit A11h4 LI ATUS Rt FC41 COMPilllD BY RE AC1DN t hClhtt Ribb * *
1.
bottil.... 50 423
(* IkAl th0 $1 A105 2.
ktFTA11hG f t R100...f t bRUARY 19??
UUT AGI * [*Llhi H30kl..125.7
+ $?0.3
- 60s.0 3.
U11 L i f f LONT AC1................. A. t. t i na 203 444 53hh 4.
L i t t h 5I D I N E R MAL PDWI R......................................... 3411
- Mllll10NI
- 5.
h AMi l'L A f t R A t l k G ( GR O15 HJC )................................. 1,253 MW
- UAll 3 6.
DillLN titC1RICAL RAllhb (ht1 Mdt )....
........................ 1,153.6 7
MAni>tM Dil'INDAllt CAtACiff (GR0kl Mat).........................
1,1 D4. 2 B.
M A x l HJN Di tt ut ABL t C At At l1 Y (Nt 1 Mvt ).......................... 1,13 7.0 9 I f CHAWttl DCCUR ABOVt lihLt L Att kiPt*1, k! AEt*n art...........
N/A
- 10. POWE R li vil 10 WHIC H Ri L1R ICitD, i f ANY (hti Mst )...............N/ A
- 11. RI Att* f t* Rt51RIC11DN, if ANY....N/A YtAR 10 DAlt CUMUL AllVI 10 t4?!
settenestenen asenesteesseesarse l
- 12. Hours IN RitDRilkG tiR100 696.0 1,440.0
$1,336.0
- 13. NUMBE R OF HOUR $ l'il FI ACIDR WA$ (WillCAL 611.9 611.9 37,159.2
- 14. PLACIOR kt$tRVE $HU1DOWN H3Urs 64.1 828.1 6.466.5
- 15. HOURS LiktRAldR DNLINt 570.3 570.3 36,388.1
- 16. UWii Rt$tRVE $HU1DOWN H00R5 0.0 0.0 0.0
- 17. GR0$$ 1HERMAL thtRGY GtWERAltD (MWM) 1,833,b46.0 1,833,B46.0 118,777,992.0
- 18. GRO$$ (LIC1RICAL tht3GY CthtRAftD (MWH) 631,762.5 631,762.5 40,983,0?4.0
- 19. Wil ELECTRICAL tktRGY stWERAftD (MWH) 508,003.3 589,127,9 39,002,589.7
- 20. UNil $[RVICE FAC1DR 81.9 39.6 70.9
- 21. UNIT AVAILABILITY F#,CICA 61.9 39.6 70.9
- 22. UNil CAPAC11Y F AC108 (UllNG MDC Ntt) 75.6 36.0 66.6
- 23. UNil CAPAC11Y F AC1DR (U$lkG DER hti) 74.5 35.5 65.9
- 24. Uhl1 FORCCD 001Act Raft 18.1 60.4 19.1
?5. UNil f DRCED OUT AGt HOUR $
125.7 B(9.7 3,698.B 5HU1 DOWNS $CHEDULED OVtR htX1 $1K MONTHS (1YPE, DAll, AND DURAllDN OF E ACH).......
h/A If CURRINILY $HU1DOWN, ES11MAltD $1 ARIUP DAlt......N/A
t AVERAGE DAILY UNIT POWER iLVEL DOCKEl NO.
ML423 UNil MRt S(ONEMb1L3 DATE March 3.1922 COMPLETID llY&.Luen 203-4441nw MONTH Iebruary 1932 DAY AVERAGE DAILY POWER LtVIL DAY AVERAGE DAILY i>OW[R llVil (MWE NIT)
(MWI NIi) 1 0
16 1_L40 2
0 17 1140 3
0 18 1131}
4 0
19 1142 5
0 20 1133 6
118 21 1139 7
390 22 1125 8
724 23 1135 9
1128 24 1137 10 1145 25 1136 11 1143 26 1138 12 1144 27 1138 13 1145 28 1136 14 1145 29 1119 15 1140 i
m 4
DOCKET NO. 50-423 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME MILLS 10NE 3 DATE 03-06-92 COMPLt.It.u bi A.
L.
El-s TELEPHONE f203) 444-5358 No.
Date
- e Dura-Reason Method of Licensee System Component Cause and Corrective
(-
tion (2)
Shut down Event Code Code Action to Prevent Prevent Recurrence Hours Reactor (3)
Rept No.
Unit shutr%wn month of 1%1 fue to clogged July,l generetor 91-03 02/01/92 F
125.7 A
4 91-019-00 BI PSP diese service water heat ex-changer caused by mus-sels. Service water sys-tem piping disassemblsd, cleaned and inspected.
Refer to LER for more de-I I
tails.
outage extended November I 22 for erosion / corit-slon inspections.
l l
3: Method 4: Exhibit G - Instructions 1: F: Forced 2: Reasons:
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or Test 2-Manual Scron Entn* Sacets for Licensee 3-Automatic Scram Event Repert (LER) File l
C-Refueling 4-Continued from (NUREG-Ol61)
D-Regulatory Restriction License Exam previous month E-Operator 2 raining &
F-Administrative 5-Power Reduction 5: Exhibit 1 - Same Source G-Operational Error (Explain)
(Duration = 0) 9-Other (Evplain)
H-Other 1
j l
1 1
o REFUEllNG INFORMATION REOUEST February 1992 Y
1.
x of facility: Millstone 3.
T
?
- 2.
Sueduled date for next refueling shutdown: MayJ1.1993
_l
[
3
-' Jied date for restart following refueling: lu]y 16.1993 4
ig or resumption of operation thereafter require a techt ral specificatian other licen.,e amendments?
a.
- ied date for submitting licensing action and supporting information.
o tah i
6.
mportant licensing considerations associated with refueling, e.g., new or different cel design or supplier, unreviewed design of performar.cc analysis methods, signifi-cant changes in fuel design, new operating procedures:
LUh 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a): 19_1 (b): U4Q 8.
The present licen;cd e a fuel pool storage capacity and the size of any increase in licensed storage cai,ocity that has been re oested or is planned, in number of fuel assemblies:
Eresent size - 756.
f No increase reauesteil 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
End of cycle 5.
_