ML20094K937
| ML20094K937 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 02/29/1992 |
| From: | Feigenbaum T, Nardone P PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-92029, NUDOCS 9203230316 | |
| Download: ML20094K937 (6) | |
Text
4
'Ne@ Hampshire
- Y
{
h Ted C. Feigenbaum Ps euder.1 ond CL;ef Emen vtae Of ficer NYN 92029 March 12,1992 United States Nuclest ' cgulatory Commission Washington. DC 2l0 55 Attention:
Document Co
1 Desk
Reference:
Facility Ope
,ic e n ': t N PIL 8ti, Docket No. 50 443
Subject:
Monthly Operating Report (ientlemen:
linclosed please find Monthl) Operating iteport 92 02.
This report addresso the operating utid shutdown experience rela'ing to Seabrook Station Unit I for the month of February,1992 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.H.1.5.
Very truly yours, c:f.A4y*./w Ted C. I cigenbaum I?nclosure TCF: AI.I./t ad cc:
Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road Kinc. of Prussia, PA 19406 M r. Gordots I? lidison, Sr. Project Manager Project Directorate 13 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr Noel Dudley NRC Senior Resident inspector P.O. Ilox 1149 Seabrook, Nil 03874 9203230316 920229 PDR ADOCK 05000443
/[- <
R PDR New Hampshire Yankee Division of Public Service Company of New Hampshire
/c g P.O. Box 300
- Seabrook, NH 03874
- Telephone (603) 474-9521 j
i
- ~ - - -. ~. - -.. _ _ -. - -. -
i
)
1 1
New ilampshire Yankee March 12,1991 l
i i
i i
t i
1 i
i t
i i
s s
i liNCl.OSUl(I? TO NYN 92024 i
6
?
E a
5i e
p N
s 4
V I
.l
?
l 1
=
[:~..
_------n.,-,~...-,,n,.,,,,,.,,,,,
OPERATING DATA REPORT DOCKET NO.,
50-443 UNIT,,fenbrook 1 DATE 03/12/92 COMPLETED BY _P.
Narpone 1
TELEPHONE (603) 474-9521 j
(Ext. 4074)
{
pf ERATING STATUS.
1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period FEBRUARY 1992 3.
Licensed Thermal Power (MWt):
3411 l
4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Rating-(Net MWe):
1148 6.
Maximum Dependable Capacity (Gross MWe):
1200
- i 7.. Maximum Dependable Capacity (Net MWe):
1150 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Not ADDlicable 9.
Power. Level To Which Restricted. If Any:
None l
- 10. Reasons For Restrictions. If Any Not ADD 11 cable This Month Yr.-to-Date Cumulative
- 11. Ilours In Reporting Period 696.0 1440.0 47089.0
- 12. INmber Of liours Reactor Vas Critical 696.0 1440.0
,,,,,,,,13 8 0 5. 5
.13. Reactor Reserve Shutdown liours 0.0 0.0 953.3
- 14. Hours Generator On-Line
-696.0 14 4 0. 0,,,,,
1196,4_d 15.. Unit Reserve Shutdown Hours.
0.0 0.0 0.0
- 16. Gross Thermal Energy. Generated (MWH) 2373536 4907537 37977397
- 17. Gross.Elec. Energy Generated (MWH) 830Q33 1715617 13086866
- 18. Net Electrical F.nergy Generated-(MWH)
-798697-1649248 12557623
- 19. Unit Service Factor 100.0 100_.0 78.9
- 20. Unit Availability Factor 100.0 if0.0 78.9
- 21.-Unit Capacity Factor (Using.MDC Net) 99.8
,_.9 9. 6.
7 4. Q,.
- 22. Unit Capacity Factor (Using DER Net) 100.0 99.8 74.8
- 23. Unit forced Outage Rate
_,,_,,,,,,,,g._0,,,,,,
0,0 7.5
- 24. Shutdowns Scheduled Over Next 5 Months (Type, Date. and Duration of Each):
None scheduled
~
- 25. If Shut Down.At End Of Report Period Estimated Date Of Startup: Not Applicabbe
- NOTE: ' Cumulative
- values based on total hours starting 08/19/90, date Rsgular Full Power operation begen, 1 of 4 1'*ft14-WP--tlx*t am.*3-t==4?
r 1ey v'-r um 's e-T eig ytrum t-w*r-t%a.#-.p.ees s e-wadit--ea:s.Ng.ge.
errmy cyquir.,
em: a en m ' M ae e A--mE-sam 4
]
AVERAGE DAILY UNIT POWER LEVEL
.i 1
DOCKET NO.
50-443 l
UNIT Seabrook 1 DATE _.03/12197 i
C0FtPLETED BY P.
Nardono TELEPHONE 1603) 474-Q521 s
E (Ext. 4074) m "BR UAR Y_g __19 9 2._
f
- RAGE DAILY POWEl. LEVLL DAY AVERAGE DAILY ?O hn LEVEL
[
9 (MWe-Net)
(ifde -fle t )
1147 16 1149 i
'.147 17 1148 3
1147 18 1148 4
,1147 19 1149 1146 20 lj48 6
[147 21 1148 7
414G 22 1147 4
8 1147 23 1148 9
1147 24 1147 10 1147 25 1147
..f 11 1148 26 1148 11 1147 2 '/
1149 13 1147 28 1149 14 1_1_4,8 29 1147 l
15 1147 m
. INSTRUCTIONS tn this format, list the average daily unit power level in Ffle-Net for each day in the e
re,,urting month.. Compute to the nearest whole megawatt.
2 of 4 A
E_
o,.
t UNIT.. SHUTDOWNS AND.-POWER, REDUCTIONS
-DOCKET WO.-
_30 44i n
-UNIT Seebrcok 1-D.iTE
'03/12H2-
+-
i REPORT MONTH:
FEBRUARY. 1992
-COMPLETED.Bf' P. Nardond-
-: #1 TELEPHONE (603) 474-9521
- (Ext. 4074)'
.i Tio.
Dai.e >
Type '
Duration-Reason'.
Method of
' Licensee Cause & Corrective:
~(Hours)
. Shutting l Event Action to 3
Down Reactor Report f" Prevent Recurrence Page 1-of l'-
d
.i NO ENTRIES FOR THIS MONTH l
-k
+
1 2-3 F:
Forced
- Reae~u Methode S:
Scheduled A-Equipment; Failure (Explain)'
l-Manual i
i B-Maintenance or Test 2-Manual Scram l
C-Refueling.
3-Automatic Scram D-Regulatory Restriction 4-Continued frca
+
l E-Operator
- raining & License Examination previous month
.F-Administrative 5-Power Reduction-G-operational' Error (Explain)
(Duration - 0)
H-Other.'(Explain) 9-Other (Explain) l 3
-f 4 I
t; t
~..
. _. _. ~ _
m. _
_ 4 -- c ;* -.;
DOCKET NO, 5M43
' 41#
UNIT _Seabreyi '
-DATE 03_l17/97-COMPhETED DY.
P. Nordone
']
TELEPHONE 1603) 4 74r_9_5 21 -
(Ext. 4074)
REFUEttNG INFORMATION REQUEST
=1,=Name-of facility:- Seabrook Unit 1
. j
-2.=5cheduled dateLfor.next refueling. shutdown:
09/19/92 3i: Scheduled date for restart following refueling ^11/14/92
~
14.;Will.efueling or resumption of' operation thereafter require a technical 1
specification change.or other license amendment?
Yes,-Reactor Coolant System Narrew Range RTD Bypass Elimination
- 5.' Scheduled.date(s) for submitting licensing action and supporting information:
' March 15, 1992
- 6. Ime,rtant licensing considerations ssociated with refueling, e.g.,
i new or.different fuel-design or te. plier, unreviewed design or i=
' performance analysis methods, signtiicant changes in fuel design, new operating procedurent
' Next. refueling will be the initial start of the eighteen-month g
fuel-cycle schedulo, 7.'
The number of fuel assemblies (a) in!the core and (b) in the spent
-fuel storage pooli:
(a)f'In Cores-195 (b) 60 8.'The.present licensed _ spent fuel pool storage capacity and the site of
'any increase in licensed storage capacity that has been requested or issplanned,Lin numberfof fuel assemblies Present licensed capacity:- 1236 No increase in storage capacity requested or planned.
i
-[9 4 The' projected date'of the last refueling that can be discharged to.
- he spent' fuel. pool assuming the present licensed capacity
' Licensed 1 capacity of 1236 fuel assemblies based on two annual-and twelve eighteen-month rafuelings with' full core-4
=
Joffload capability.
The current licensed' capacity is adeounte until at least the year 2010, 4 of 4 i
pt r
m g, wvv r-m er