Text
,
I O1, Ccmmonwealth E(sen '
1400 Opus Place
{
v ' - Downers Grcve, Illinois 60515
.~
l March 13,1992 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 t
- Attn, Document Control Desk
Subject:
Byron Station Units 1 and 2 Regulatory Guide 1.97 Compliance -
Tac Nos. M57198 and MG3250 NBO_D9cketBosm50-45A2ndE0-A55 g
Reference:
(a) May 23,1991 letter from A. Checca to Dr. T.E. Murley :
Dear Dr. Murley:
The purpose of this letter is to provide the NRC Staff notification of completinn of an activity,.to which a commitment was made in prior correspondence. The
_ replacement of the RHR heat exchanger outlet tsmperature instrumentation with environmentally qualified instrumentation was completed on Byron Unit 1 during the Fall 1991 refueling outage, With com aletion of this modification, all commitments made
- for Byron Units l1 and 2 compliance w th Regulatory Guide 1.97 are completed. The letter of Reference (a) indicated all other Byron Unit _1 and 2 commitments were
, completed.
- Please direct any questions you may have concerning these matters to this office.
_ Respectfully, jg fj{
Terence K. Schuster -
Nuclear Licensing Administrator cc:. A.H. Hsia - Project Manager, NRR L W. Kropgavis _- Regional Admin strator -
Senior Resident ins 3ector B ron f gg'g A. Bert 111 9203200245 920313-Ip PDR' ADOCK 0500o454 P~
PDR'
)
-l ZNLD/867/39
-