ML20094K121
| ML20094K121 | |
| Person / Time | |
|---|---|
| Site: | Indian Point, Point Beach |
| Issue date: | 11/13/1995 |
| From: | Link B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19317C100 | List: |
| References | |
| VPNPD-95-090, VPNPD-95-90, NUDOCS 9511160169 | |
| Download: ML20094K121 (1) | |
Text
-
Wisconsin Electnc POWER COMPANY 231 W Michigan Po. Box 2046 Mdwoukee, WI 53201-2046 (414)221 2345 VPNPD-95-090 10 CFR 50.4 10 CFR 50.90 November 13, 1995 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.
C. 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 ADDITIONAL INFORMATION REGARDING EMERGENCY TECHNICAL SPECIFICATIONS CHANGE REOUEST 184 INCORPORATION OF F* STEAM GENERATOR TUBE REPAIR CRITERION POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 On November 9, 1995, we submitted Technical Specifications Change Request 184, " Incorporation of F* Steam Generator Tube Repair Criterion."
In a telephone conference on November 13, 1995, your staff requested additional information to facilitate their review of our submittal.
The requested-information is enclosed.
Please note that in accordance with 10CFR2.790, the enclosed B&W Nuclear Technologies (BWNT) Documents, 51-1232768-00, " Indian Point 2 Re-Roll Design Verification Report," 32-1239608-00, " Point Beach Unit 2 F* Calculations," and memo entitled "RAI 11/13/95" are considered "BWNT Proprietary."
It is, therefore, requested that this information be withheld from public disclosure.
An affidavit supporting this classification signed by J. H. Talyor, Manager, Licensing Services, B&W Nuclear Technologies, will be forwarded under separate cover.
If j
requested, a non-proprietary version of these reports will be forwarded under separate cover.
If you require additional information, please contact us.
Sincerely, sW Bob Li k Vice esident Nuclear Power T.F. l' r
,,3 9511160169 951113 I&
PDR ADOCK 05000266
'l g
p PDR
.4 suhM,n afitinmm Dwrrn Gepnher