Monthly Operating Rept for Feb 1992 for Waterford 3
ML20094J990
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/29/1992
From: Burski R, Centolanzi P
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0127, W3F1-92-127, NUDOCS 9203170253
Download: ML20094J990 (7)


Text

~

1 I

g.

2:~ ENTERGY E"'i!" """""'""*'

K& v 1 A ~'ONO N SD4 739 0774 R. F. Burski iw nod 1

/. iN ' :t ,

W3F1-92-0127 A1.05 "

QA March 13, 1992 U.S. Nuclear Regulatory Con. mission -

ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which cosers the operating statistics for the month of February,1992. This report is submitted per Section 6.9.1.G of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours,

' f) y:, Jow,};

RFB/TJG ssf Attachment ec: R.D. Martin, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds J.T. Wheelock (INPO Records Center)

NRC Resident Inspectors Office b

  • i 9203170253 920229 PDR b R ADOCK 05000382 j PDR /

O NRC NONTIILY OPERATING REPORT

SUMMARY

0F OPERATIONS WATERFORD 3 FEBRUARY-1992 The unit operated at an average reactor power of 69,9% and experienced one-

-planned maintenance outage during the period. _

I LW310204B b.)

. . . . ., . , .- . . ~ . . . ~ . . - . = . - . . . . . - - . - _ - _ . - . ~ - . - _ . - .

. 's PRESSURIZER SAFETY.. VALVE FAILIIRES-AND CllALLENGES-WATERFORD 3 During the month of February 1992, there were no pressurizer safety valve failures.or challenges.

b d-a W310204B

^

. - ~ , . ,i, ,.n. -

- .- . . - . - - - - ~ . - . . . ~ . . . ,. -. ..~_. - - - , ~ . . _ . . . . - - . - . .-

.: ll ,

OPERATING DATA REPORT

-- UNIT NAME: WATERFORD_3 ,

CITY / STATE: KTLLONA/LA _

DATE: MARCil, 1992

~

OPERATING-STATUS 1, Docket: 50-382 - - - Notes

2. Reporting Period: FEBRUARY,1992-
3. Utility

Contact:

PATRICK CENT 0LANZI Phone Number: (504)~739-6683 __

4. Licensed-Thermal Power (MWL): 3390
5. Nameplate Rating (Gross tiwe): '1200
6. Design Electrical Rating (Net HWe): 1104
7. Maximum Dependable Capacity (Gross MWe): 1120
8. Maximum Dependable Capacity (Net MWe): 1075
9. If Changes occur' in- Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
10. Power- Level-To Which Restricted,= if Any (Net MWe): NONE

~11. Reasons For' Restrictions, If Any: N/A _

This Month Yr.-to-Date Cumulative

12. }!ours.In Reporting Period. _

- 696.0 1,440.0 56,401-.0 13 . Number of Hours Reactor Was-Critical- -498;8 _ 1,242.8 j 46,329.2 14..: Reactor Reserve Shutdown llouro -

15. Ilours Generator on-Line 492.8 -1,236 8 . 45,617.6
16. Unit Reserve Shutdown llours .

W310204B v w daw'1 -w *31-'es -t9-?'**--T9' m m4 rea " 7 r== g - v'= efa ma e -9mha T e--r yr 'N ff*,C"W1 1

. - . _ . - . . . . . _ . . . - . - . - - - - - ~ - ~ . - - . - - - - ~ ~ - .

OPERATING DATA REPORT (Continued) i This Month Yr.-to-Date Cumulative  !

17. Gross Thermal Energy 1,649,550 4,166,763 149,716,238 Generated (tMI)
18. Gross Electrical Energy _ ,553,270 1,400,370 50,271,790 Generated (MWil) ,
19. Net Electrical Energy _ 526,007 3 339,295 47,888,755 Generated . (MWil) -
20. Unit Service Factor 70.8 -85.9 -80.9

.21. Unit Availability Factor 70.8 85.9 80.9 3

22. Unit Capacity Factor ~

70.3 ~ ~

86.5 .

79.0 (Using MDC Net)

23. -Unit. Capacity Factor 68.5 84.2 76.9

.(Using; DER Net)

'24. Unit Forced Outage Rate 0 . 0 ,,_

0.0 4.2 25,- Unit'.. Forced Outage Jiours

_ _.;0; , _ _

13 984.8

26. Shutdowns Scheduled over Next 6 Months (Type, it; and Duration of Each): ,
27. If Shut Down At End of Report Period, Estimated Date of Startup:
28. Urif ts In Test Status (Prior-to i r srcial: Operation):

Forecast Achieved INITIAL CRITICALITY 3/04/85-INITIAL ELECTRICITY 3/18/85; COMMERCIAL OPERATION 9/24/85 c-

.W310204B

F 1.7 f. ~ 4 __ -

AVERAGE DAILY UNIT POWER LEVEL  ?

DOCKET NO. 50-382 UNIT WATERFORD 3 DATE MARCll,_1992 COMPLETED fly IH RICK CENT 0LANZI TELEPil0NE 504-739-6683 ___

MONTil FEBRUARY 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1- 1093 17 -32 ,

2~ 1092- 18 3 1092 19 -12 4_ 1093' _ _____

20 -12 5' 1043 21 -14 6 ._

1092 22 -17 7 1093 23 -27

.8 1092 24 -38

-9 1092 25 308 10- 1092 26 1085 11 1091 27 1091 12 1088 28 1092 .

13' '1087 29 1092 14 1091 30- N/A ,

15: 1092 31 N/A-16 1039 INSTRUCTIONS On this format =, ~1ist the average daily unit power level in MWe-Net for each day in'the reporting month. -Compute to the nearest whole megawatt.

-W310204B-

UNIT SliUTDOWNS AND' POWER REDUCTIONS-' L

' REPORT FOR FEBRUARY 1992 f.

DOCKET NO '50-382 UNIT NAME WATERFORD~3 DATE MARCli 1992 .

COMPLETED BY ' PATRICK- CENTOIANZI

' TELEP110NE 504-739-6683 4

Method of' Licensee Cause & Corrective ,

Duration Shutting Event System Component ' Action'to No. Date Type l (IIOURS) REASON 2 Down Reactor 3 . Report # Code 4 Code 5 Prevent Recurrence ,

92-01'.920216- ;S 2l03.2 .B 1 N/A AB SG Scheduled Maintenance Outage I to repair leakage

i. from Steam Generator  !

Manways:

4 .

1 2 3 F: Forced Reason: Method S: Scheduled A-Equipment Failure-(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

. C-Refueling 3-Automatic Scram. '

D-Regulatory Restriction 4-Continuation 4 E-Operator Training & 5-Load Feduction IEEE Std. 805-1984 License Examination 9-Other 5

'F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)  !

.II-Other (Explain). ,

I

-W310204B 4 ,

_ _ _ _ r_. .Lr , _