forhern Nucien' Operating Company Post 0%Ce Box 1295 Bam.ngWn, Alabama 35201

  • Te cphone POS 868 5086 n

Southern Nudear Operatina Company A o. woooaro Vice Presdent

""S#"'"*"'"

Farley Propet March 13, 1992 Docket No. 50-348 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 1

Washington, D. C.

20555 Joseph M. Farley Nucl ar Plant Unit 1 Monthly Operatina Data Report

~

'ientlemen:

Attached is the February 1992 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, bbe rnke

'J. D\\. Woodard w)

AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter dr. S. T. Hoffman Mr. G. F. Maxwell F

PDR ADOCK 05000348 R

PDR

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS February 1992 l

There were no unit shutdcwns or major power reductions during the month of February.

The following major safety-related maintenance was performed during the month:

1.

Miscellancous corrective and preventive maintenance wa:; performed on the diesel generators.

e p

OPERATING DATA REPORT DOCKET NO. 50-348 DATE ~Rarth 4, 1972 COMPLETED BY D. E.' Horey TELEPHONE (205)B99-5156 OPERATING STATUS Notes

1. Unit Name:

Joseph M. Farley - Unit 1

1) Cumulative data since
2. Reporting Period:

February 1992 12-1-77, date of

3. Licensed Thermal Power (MWt):

2,652 commercial operation.

4. Nameplate Rating (Gross MVe):

86D'

5. Design Electrical Rating (Net HVe):

829

6. Maximum Dependable Capacity (Gross HWe):

855.7

7. Maximum Dependable Capacity (Net MVe):

812.0

8. If Changes occur in Capacity Ratings (Items Number 3 Through"7) Since Last Esport, Give Reasons:

N/A

9. Povet Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 696 1,440 124,896
12. Number Of Hours Reactor Vas Critical 696 1,440 97.350.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,65UTU~
14. Hours Generator On-Line 696 1,446~~

95,704.3-

~

15. Unit Reserve Shutdovn Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MVH) 17844,169.0 3,815,517.3 245,220,141.5
17. Gross Electrical Energy Generated (MVH) 601,116 17245,220 ~79,029,982
18. Net Electrical Energy Generated (MVil)

-~570,742 1,182,442

~74,597,240-~~

19. Unit Service Factor 100.0 100.0 7676~
20. Unit Availability Factor 100.0 100.0

'76.6

21. Unit Capacity Factor (Using MDC Net) 101.0 101.1

' 737B~

22. Unit Capacity Factor (Lsing DER Net) 98.9 99.1 72.0
23. Unit Forced Outage Rate 0

0 7.0

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, end Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 Form 2/34

DOCKET NO.

50-348 UNIT 1

DATE March 4, 1992 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWo-Net)

(MWe-Net) 1 823 17 819 2

825 18 816 3

825 19 818 4

823 20 824 5

820 21 824 6

824,

22 820 7

823 23 817 8

816 24 817 9

809 25 815 10 824 26 820 11 824 27 822 12 823 28 821 13 820 29 619 14 817 30-15 817 31 16 818 INSTRUCTIONS on this format, list the average daily unit power level in MNe-Net for each day in the reporting month. Compute to the r.earest whole megawatt.

Form 13/21

UNIT SCL N AED POWER EEDUCTIONT Ch7 30.

%-344 InrIT RAME J. O. FAPLEY - 9 erit 1 _

e

~

DATE Mart % 4 1997 '

COMFEETED ST D.

W.

WJRET REPORT MorrTH FYRFCART TEL.EFEOWE (195489e-5154 I

I i

i l

i METnCo or i LICENSEE I i

1 cusE. coe:EcTIvE I

l l

l l DC,2ATION l E7EET l SYSTEM l COMPOKENT l

ACTIOff TO

[

li 3223o 2 l $ NUTTING 1 Do-s mEAcTom' I aEromT e I cooE' I cooE' I

remwT mEcurr-xE I

luo.

i. DATE I rTrE

] wmsi lThere were ne unit shutdowns or majer power reductions durine ** month of February.

I l

l j

l l

i l

i i

i i

i i

i l

i i

i i

i i

I I

i i

1 i

i i

i i

l i

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

1 1

I I

i i

i I

I I

I I

i i

i I

I I

I i

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

i i

i i

i I

1 1

I I

I I

I I

I I

i 1

1 1

l l

l 1

I I

I I

I I

I I

(

l i

I I

I I

I I

i i

i I

i i

i i

i i

i i

i i

I I

i i

i l

i i

l I

i i

i I

I I

I I

I I

I i

i i

I I

i 1

1 I

I I

I I

I I

I I

I I

I i

i I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i i

I I

I I

7: Forced Reasen:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Emplaint 1-Marsal for tre=>aration of Data B-Meistenance er Test 2-Manual Scrae.

Entry sheets for Liceesee C-Refueling 3-Automatic scram.

Ew.et Reportit.ER) File i m EG-f D-Re% story testrictica 4-Other (Explais)

S161)

E-Cperator Training & License Examination 4

F-Administrative Eshibit 2 -Sese source G-operational Error (Emplain) 3--other (Explain) l L

_._