ML20094J285

From kanterella
Jump to navigation Jump to search
Forwards EPIP Changes,Including Change to Page 2 of EPIP Index Issued 920227,Rev 3b to EPIP-EOF-22 Coversheet Issued 910517,EP Forms Index Issued 920228,Rev 3 to FC-EPF-14 & Rev 3c to EPIP-EOF-22 Issued 910517
ML20094J285
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/06/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094J287 List:
References
LIC-92-083, NUDOCS 9203120285
Download: ML20094J285 (2)


Text

.. - -

e g

a

.4-o

~.

s

.. '. P 3

m-e.

Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 6810?.-2247 402/636-2000 March 6, 1992 LIC 92-083 U. S. Nuclear Regulatory Commission ATTN Document Control Desk Mail Station Pl 137 Washington, DC 23555

Reference:

Docket No. 50-285 Gentlemen-

SUBJECT:

Transmit.tal of Changes to the Fort Calhoun Station (FCS) Emergency Plan implementing Procedures (EPIP)

As required by 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b 154,155,)(156, and 165.5)(iii), the followingFCSEPIPchangesareprovidedforbRCcopies REMOVE EECTION INSERT SEC110N EPIP Index, issued 1/9/92, page 2 EPIP Index, issued 2/27/92, page 2 EPIP-E0F-22 coversheet, R3, ;ssued EPIP EOF-22 coversheet, R3b, 5/17/91 issued 5/17/91 Summary of Chances, Added typographical correction information to coversheet.

8QiOVE SECTION liiSERT SECTION EP Forms Index, issued 1/3/92 EP Forms Index, issued 2/28/92 FC-EPF-14, R2, issued 9/30/91 FC EPF-14, R3, issued 2/28/92 EPIP Index, page 2, issued 1/9/92 EPIP Index, page 2, issued 3/2/92 EPIP EOF-22, R3, issued 5/17/91 EPIP-EOF-22, Roc, issued 5/17/91 Synmarv of Ch uqt1 Change to coversheet only.

Please raturn the transmittal sheets to confirm your receipt of these changes.

10003'7 asm g

rwmag,pgpem 00 Eff W " 3//7 j

U. S. Nuclear Regulatory Comission LIC-92-093 Page 2 If you should have any questions, please contact me.

Sincerely,

/&,.h. b y W. G. Gates Division Manager Nuclear Operations WGG/ sol Enclosure T

c:

LeBoeuf. Lamb. Leiby & MacRae (w/o enclosure)

R. D. Martin, NRC Regional Administrator, Re D. L. Wigginton, NRC Senior Project Manager,gion IV. (Copies 154,155.156)

(w/o enclosure R. P. Mullikin, NRC Senior Resident inspector, (w/o enclosur)e)

5. D. Bloem, NRC Project Engineer (w/o enclosure)

.