Text
_
umerick Cener: ting Etitirn i
a
'PECO ENERGY
- T ;; ; ""a'"'
Sanatoga, PA 19464 4920 1
T.S.6.9.1.6 f
November 13, 1995 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of October 1995 forwarded pursuant to Technical Specification 6.9.1.6.
Also enclosed are two revised report pages (Unit Forced Outage Rate) for Limerick Unit 2 for the months of August and September.
Very truly yours, Midhael P. Gallagher l
Director - Site Engineering drh Enclosures cc:
T. T. Martin, Administrator, Region I, USNRC i
N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS 1