ML20094F996

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Preoperational Safeguards Insp Rept 50-341/84-18.Corrective Actions Re Design of Main Personnel Access Facility & Potential Design Weakness within Warehouse Withheld
ML20094F996
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/24/1984
From: Jens W
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20094F979 List:
References
EF2-69659, NUDOCS 8408130163
Download: ML20094F996 (1)


Text

,-

,M:

a

~ Wayne H. Jsne.

Vre Presem mw....__

nxi.y wanons Detroit:

~2

. e4oo ne ow goay Newport, M cmgan 48166-wa) seemso

July 24, 1984 EF2-69659 Mr. James G.

Keppler.

Regional Administrator Region III U.S.. Nuclear Regulatory Commission

-799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reference:

Fermi 2 NRC Docket No. 50-341

Subject:

Detroit Edison's Response to Inspection Report No. 50-341/84-18 With this letter, we are providing the information you requested in your letter of June 21, 1994, transmitting Inspection Report No. 50-341/84-18.

This inspection report describes the results of a routine preoperational safeguards inspection conducted by Messrs. T.

J. Madeda and J.

R.

Knicely at Fermi 2 during the period of May 21-25, 1984.

The enclosed response describes the steps taken or intended to be taken to address the matter relating to the design of the main personnel access facility and the matter relating to'the potential design weakness within the warehouse.

The responses are arranged to correspond to the sequence of items listed in'the body of your report.

We trust this response will satisf actorily address your request.

If you have questions concerning this matter, please' contact Mr. Lewis P. Bregni (313) 586-5083.

Sincerely,

/

cc Mr.

P.

M. Byron Mr.

R.

C.

DeYoung Mr.' R.

C. Knop WHEN SEPARATED FROM ENCLOSURES, HANDLE 840813o163 84o800 THIS 700UMEtiT AS DE00iiTROLLED prR ADOCK 05000341 PDR O

gg