Southen Numm Operwig Canpany Post Of'ce Don 1295 Damingtem, Alabama 3S?01 teepw,ne 20s ec.a man n
Souther n Nudcar Operating Company J. D. Woodna EMNf$
February 13, 1992 Docket Nos. 50-348 S -364 V. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555 Joseph M. f arley Nuclear Plant Status of Licensina items Gentlemen:
l Attached for your information are proposed schedules for the submission and i
requested approval of various licensing items.
Attachment I contains a prioritized listing of license amendments and other requests,,. tachment 2 a listing of completed items and Attachment 3 a listing of other NRC related submittals.
Please note that approval of the items associated with ISI, IST, and VANTAGE-5 are needed by the upcoming Unit 2 eighth refueling outage.
Southern Nuclear Operating Company appreciates NRC efforts in the review and approval of licensing amendments granted during the last year.
If you have any questions, please advise.
Respectfully submitted, Nr e
T. Woodard JDW/BHW: map 1392 Attach-ents cc:
Mr. S. D. Ebneter Mr. S. T. Hoffman l
Mr. G. F. Maxwell l
)U pool e
///
m _
...._--__..___---_m____.._
4.
i ATTACHMENT 1 STATUS OF LICENSE AMENDMENTS AND OTHER REQUES15 a
PRDPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL ARC 11[3
_ DATE DAff it)
DATE
._DATF 1AC #
RIMAEKS
- 1. Aemoval of Fire 02 26 91 Aug 1991 79873 Expected Protection Requirements 79874 Mar 1992 f rom t.S., FNP 1 and 2
- 2. VANTAGE $ Fuel Use, 07 15 91 Jan 1992 81025 Needed by FNP 1 and 2 81026 U2 8th R0
- 3. Alternate Tube 02 26 91 Mar 1992 79818 Desired by Flugging Criteria 09 11 91 79819 U2 8th RO for Tube Support 11 13-91 Plate, FNP 1 and 2
- 4. Radiological Mar 1992 Oct 1992 Needed to Effluent T.S.
support Deletion per implementation Generic Letter of new Part 20 i
90-01 rule
- 5. Quadrant Power Tilt Feb 1992 Feb 1993 Ratio Alternate Thimble Use, ThP 1 and 2 (T.S. 3/4.2.4.2)
- 6. 10 CFR 55 Revision. Mar 1992 Mar 1993 Related Changes, FNP 1 and 2 (T.S. 6.4) l
- 7. T.S. Change per May 1992 May 1993 l
G.L. 87 09 for l
T,S, 4.0.3 on surveillance i
- 8. RHR Suction Valve Jul 1992 Sep 1993 Auto Closure Inter-Lock Removal, FN? 1 and 2 (T.S. 3/4.9.8)
- 10. PORY T.S. Changes Sep 1992 N/A Tech Spec l
per Generic Letter change awaiting 90 06 completion of PRA.
Adninistrat ive
. contrtls in place.
'11. Chlorine Detection Oct 1992 May 1993 T.S. Deletion i
- 12. Containment Sep 1992
.Sep 1993 Isolation valves Substitution
..... ~ ~ ~..
- -. -..=.. ~.....
-~.-~...-.s.
.. - - ~... -.-.,....
Attachnent 1 Status of License Anendients ard Other Requests Ppge 2 PROPOSED ACTUAL REQUESTED ACTUAL
-APCo APC0 NRC WRC
$UBMITIAL
-$UBMifiAL APPROVAL APPROVAL WRC
$3 08tE DATE (S)
._DATE DATE 1AC #
PEMARI.}
- 13. Revise MSIV Bypass' Oct 1992 Sep 1993 Valve Stroke lime 4
and EllAS Time Response (f.$. 3.
- 14. T.S. Changea per 12 11 91 Dec 1992 Generic Letter 89 14 (3.25 surveltlance criteria), thP 1 and 2
- 15. Primary to secondary 10-79 91 N/A Per hRC request Leak Rate 140 spd
..e
.ew:
=e-
- e.ar.
y
,,gw 6,_%
o
-<7-y
AllAtkMENT 2 COMPLf1ED LICENSE AMENDMENi$ AND OTHtR Rt0UE$11 ACTUAL ACTUAL APCo NRC SUBMiliAL APPROVAL hRC liLM DAlf ($1_
DATE TAC #
1.
Updated and Additional 12 15 88 05-23 91 71579 IST Program Relief 07 20 89 Requests (Rev. D, 1 & 2),
08 20 90 FkP 2 2.
Additional 151 Relief s 09 09 B8 05-23 91 65489 for second 10 Year 10 04 89 Interval (Rev. 2, 3 & 4),
08 20 90 FhP 1 3.
Additional 151 09-09 88 08 28 91 65482 Reliefs for Second 04 12 90 10 Year Interval 50 15 90 (Rev. 1, 2 L 3),
09 12 90 FhP 1 4.
Updated 151 12-16-88 08 29-91 71578 Program Relief 06 08 89 Reouesta (Rev. 0 04 12-90 and 1), FhP 2 08-15 90 09-12 90 5.
Deletion of Bienniet 07-26 91 10 29 91 Procedure Review 10 01 91 Program 6.
Addition of southern 05 06 91 11 22-91 80371 Nuclear to FNP License, 09 27 91 80372 FNP 1 and 2 10-14-91 7.
Fuct Rack Criticality 07 01 91 12 30 91 80893 Analysis T.S.
10-18-91 80894 VANTAGE 5
m.._..
.. ~. _. - -. -...
..__.,_.m_
.r-i 4
A11ACHMEWI 3 STATUS OF OTHIR.1991/IP92 NRC RELAffD SUBMlTTALS PRDPOSED ACTUAL APCo APCo 7
SUBMITIAL SUDMITTAL 11[5 DATE DATE ($1__
REMARKS
~
12 02 91 heeded by
- 1. It! Relief Requests for Hydrostatic U2 8th RO Testing 2.- 151 Relief Requests 12-30 91 Needed by U2 8th RO
- 3. Energency Response 03 01 92 Data System Survey 4._1991 Annual Report of 03 31 92 Annual report 10 CFR 50 59 Plant Changes,-FNP 1 and 2 5.1991 Annual D/G 03 31 92 Annual report Reliability Report
- 6. ECCs Report per 03 31 92 Annual report
?
10 CTR 50.46
- 7. 1992 tsar Update 07 01 92 Annuot report Y