Corrects Inconsistency Noted in Equipment Rental Rates Provided in Table 3.1-3 of Decommissioning Cost Estimate,Per 920109 Telcon W/Nrc.Total Direct/Support Costs Should Be Increased by Total of $600,000
ML20094F335
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/11/1992
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Weiss S
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
P-92063, NUDOCS 9202210248
Download: ML20094F335 (3)


Text

-... -

/

~

@ Public Service'

"A-.

February 11,19!s '.

Fort St. Vrain Unit No.1 P 92063 U.S. Nuclear Regulatory Commission-NITN: Document Control Desk Washington, D.C, 20555 NITN:

Dr. Seymour II. Weiss, Director Non Powv Reactor, Decommissioning and

- Environmental Project Directorate Docket No. 50-267

SUBJECT:

FORT ST, VRAIN DECOMMISSIONING COST ESTIMATE.

CORRECTION TO EQUIPMENT RATE SCilEDULE l

REFERENCES:

(1) PSC letter, Crawford to Weiss, dated June 6,1991 (P-91198)

(2) Telecon,-W. Hug (MKF) to P. Erickson, L Pittiglio (NRC), of January 17,1992 (3) PSC letter, Crawford to Weiss, dated November 15,1991 (P-91392)

L

Dear Dr. Weiss:

1 During the weekly conference call between the NRC and Public Service Company of Colorado (PSC) on January 9,1992, an inconsistency was noted in the equipment rental rates provided in Table 3.1-3 'of the Fort St. Vrain

- Decommissioning Cost Estimate _ (Ref.1). A subsequent conference call was held (Ref._2) to discuss this table and-its application in the individual Work Breakdown Structure (WBS) cost estimates provided in Reference 1.

During this subsequent call, the NRC stated that the equipment rental cost values presented in Table 3.1-3 of Reference 1 appeared to be low and could not be n nADOCK-~,

e a

y 05000267 PDR

o 4

9 P-92063 February 11,1992 Page 2 correlated to the values presented in the cost estimates for individual Wils elements of Reference 1.

h1RF confirmed that the rental rates presented in Table 3.1-3 were low, and that these rates had been based upon ownership or depreciation. During preparation of the cost estimate for submittal to the NRC, MKF neglected to make the Equipment Adjustment to correct the equipment rental rates. The net effect of this error is that the Reference 1 Cost Estimate is understated on " Equipment" in the individual WUS element cost estimates by a total of approximately $600,000.

Therefore, the purpose of this letter is to acknowledge this error and to indicate that it will be absorbed within the available project contingency funds. The

" Total Direct Costs" and " Support Costs" identified in Figure 1.3-1 of Reference 1 should be increased by a total of $600,000, and the total available " Contingency" should be reduced by an equal amount. Ilowever, it is important to note that the overall

  • net" cost of decommissioning as presented in Reference 1 remains unchanged and the total estimated decommissioning cost of $157,472,000 identified in Reference 3 also remains unchanged.

If you have any questions related to the contents of this letter, please contact Mr.

M. H. Holmes at (303) 620-1701.

Sincerely yours,

/0 TV JYugdi D. W. Warembourg Manager, Nuclear Operations DWW:CRB/cb 1

j N:

J P-92063 February 11,1992 Page 3 cc:

Regional Administrator, Region IV Mr. J.B. Baird Senior Resident Inspector Fort St. Vrain Mr. Robert M. Ouillin, Director Radiation Control Division Colorado Department of llealth 4210 East lith Avenue Denver, CO 80220 l

l.

l l.

l

.._