Amend 177 to License DPR-59,providing one-time Extension to Fire Barrier Penetration Surveillance Interval Required by TS 4.12.F.1
ML20094F291
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/10/1992
From: Capra R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20094F294 List:
References
NUDOCS 9202130147
Download: ML20094F291 (4)


Text

__

s.CA OI Gog o

UNITED STATES l ' 3.,,, ',)

NUCLEAR REGULATORY COMMISSION g

-t W ASHINQ10N, D. C. 20%6 o

54'. s f

POWER AUTHORITY OF THE STATE OF NEW YORK l

DOCKET NO. 50-333 JAMES A. FlJZPATRICK NUCLEAR POWER PL ANT 6!!ENDMENT TO FAcIllTY OPERATING LICH(E Amendment No.177 License No. DPR-59 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Power Authority of the State of New York (the licensee) dated December 19, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety af the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:

9202130147 920210 PDR ADOCK 05000333 p-PDR

I f.,

e (2) Technical Specifications The Technical Specifications contained in Aapendices A and B, as revised through Amendment No.177, are here)y incorporated in the license.

The licensee shall operate the facility in accordance with i

the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

~R u a. [p Robert A. Capra, Director

~

Project Directorate I-l Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: February 10, 1992 o..n--

r -m 3--,

- - g n

-y,e yn, y y--~,,,.-

y

--,3 3

y

,.-,q--,_,.,,-,,

w y.---_ -.

-,w g

e-,,,,,-

4m--w y-g-p.ww v-

i I-f ATTACHMENT TO llCENSLAMENM[8] NO.177 FACILITY OP[ RATING LICENSE NO. DPR-b9 00CKET NO. 50-333 Revise Appendix A as follows:

Remove Pagg insert Paug 244g 244g

.- ~,

JAFNPP 2.

If the fire protection Wems smoke md/or heat detectors in Tabies 3.12.1 and 3.122 cannot be restored to an operable status within 14 days, a written report to the Commission outlining the action taken, the cause of snoperability and plans and schedule for restonng the detectors to an opwdie status shall be prepared and subrnitted wtbin 30 days.

F.

Fire Barrier Penetration Seals F.

Fire Bamer Penetration Sea!s 1.

A!! fce barrier penetrations, inc!udog cable penetraton 1.

A!! fire barrier pereL4 ion seals for each protected area barriers, fire doors and fire da.ymw in fire zone shafi be v:sua!!y inspected once/1.5 years to verfy boundanes protecting safety related areas shall be functional integnty. Fbr those fire bamer-famLaGu s, that r

are not in the as-desk W cer65ca, an evaluation shall be f

functional.

pufc=med to show that the modi 5 cation has not degraded l

l the fire rating of the fire bamer penetration?

l 2.

With one or more of the required fire bamer purruiudions 2.

Any repair of fire bamer permbauon seafs shafi be foGowed non-functional, within one hour estabiish a continuous fire by a visualinspection.

watch on at least one side of the affected penetration or verify the operability of fire detectors on at least one side of the non-functonal fire bamer and estab!ish an houriy fire watch patrol. Restore the non-funcbonal fJe bamer penetration (s) to functionas status within 7 days or, in lieu of any other report required by Specification 6.9A prepare and submit a Special Report to the COTirassion pursuant to Specification 6.9_B within 30 days outlining the action taken, the cause of the non-funcbonal pene*Jation and plans and schedule for restoring the fire barrier penetration (s) to functional status.

The current surveiHance interval for visuaDy insg-c,Urg fire bamer penetration sea's is extenced until May 15,1992.

This is a crn.: Ems extensson, effectve only for this inspection interval The next surveinance in'.erval began September 27,1991.

d Amendment No.

1 77 29

-