ML20094E926
| ML20094E926 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/02/1995 |
| From: | Mckee P NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20094E933 | List: |
| References | |
| NUDOCS 9511080090 | |
| Download: ML20094E926 (4) | |
Text
-
gs p meoogk UNITED STATES g-NUCLEAR REGULATORY COMMISSION
'f WASHINGTON, D.C. 20666 4 001
\\
/
NORTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY THE WESTERN MASSACHUSETTS ELECTRIC COMPANY DOCKET NO. 50-336 MILLSTONE NUCLEAR POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.190 License No. DPR-65 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee), dated August 31, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; i
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
f l
9511080090 951102 PDR ADOCK 05000336 P
PDR l
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:
4 (2)
Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 190, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance, to be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION l
u
Phillip F. McKee. Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 2, 1995
i l
i ATTACHMENT TO LICENSE AMENDMENT N0.190 FACILITY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336 4
Replace the following page of the Appendix A, Technical Specifications, with the attached page. The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
Remove Insert 6-2 6-2 e
i
I ADRINISTRATIVE CONTROLS FACILITY STAFF (COHfINUED) d.
An individual qualified in radiation protection procedures shall be on site when fuel is in the reactor.
(Table 6.2-1)
~
e.
ALL CORE ALTERATIONS after the initial fuel loading shall be directly supervised by either a licensed Senior Reactor Opera-tor or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
. f.
A site Fire Brigade of at least 5 members shall be maintained onsite at all times.
(Table 6.2-1) The Fire Brigade shall not include 2 members of the minimum shift crew necessary for safe shutdown of the unit or any personnel required for other essential functions during a fire emergency.
g.
Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-i related functions. These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12).
6.3 FACILITY STAFF OUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the mini:aum qualifications of ANSI N18.1-1971 for comparable positions, except for:
a.
If the Operations Manager does not hold a senior reactor operator license for Millstone Unit No. 2, then the Operations Manager shall have held a senior reactor operator license at a
{
Pressurized Water Reactor and an individual serving in the l
capacity of the Assistant Operations Manager shall hold a senior reactor operator license for Millstone Unit No. 2.
b.
The Shift Technical Advisor (STA) who shall meet the requirements of Specification 6.3.1.b.1 or 6.3.1.b.2.
l 1.
Dual-role individual: Must hold a senior reactor i
operator's license at Millstone Unit No. 2, meet the STA i
training criteria of NUREG-0737, Item I. A.1.1, and meet one of the following educational alternatives:
Bachelor's degree in engineering from an accredited 4
a.
j institution; l
b.
Professional Engineer's license obtained by the successful completion of the PE examination; i
Millstone - Unit 2 6-2 Amendment No. 177, Jpg, Jp), 177, 1