Amend 65 to License NPF-30,revising Surveillance Requirement 4.8.1.1.2.f.(2),concerning Diesel Generator Load Reject Testing
ML20094E560
Person / Time
Site: Callaway 
(NPF-30-A-065, NPF-30-A-65)
Issue date: 01/15/1992
From: Hall J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20094E570 List:
References
TAC-M82112, NUDOCS 9201240259
Download: ML20094E560 (7)


Text

_-_

  1. o tao,

s v

Q UNITED STATES c

j-l NUCLEAR REGULATORY COMMISSION g

wAsHiworoN. o.c. asses

.. ;s UNION ELECTRIC COMPANY CALLAWAY PLANT. UNIT 1 DOCKET NO. STN 50-483 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 65 License No. NPF-30 1.

- The Nuclear Regulatory Comission (the Commission) has found that:

A.-

The application for anendment filed by Union Electric Company (UE,

-the licensee) i ted November 15 1991 complies with the standards N

anf re.quiremenu of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.-

The facility will operate in conformity with the application, the

. provisions of the Act, and the rules and regulations of the Comission; C.

Thereisreasonableassurance'(1)thattheactivitiesauthorizedby t

this amendmant can be conducted without endengering the health and safety of the public, and (ii) that such activities will be conducted q

in compliance with the Comission's regulations;-

D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is In accordance with 10 CFR Part 51 i

of the Comission's regulations and all applicable requirements have I.

been-satisficd.

2.

'According

'the license is amended by chan I

Ilicatedintheattachmenttothi!estotheTechnicalSpecifica-tions as

-license amendment,.and para-graph 2.C.(2) of. Facility Operating. License No. NPF-30 is hereby amended to read as follows:

(

t f

a l

9201240259 920115 PDR-=ADOCK 05000403-

?..--- --- - -.~;- -. - - - -

" - ~

  • 4 o

2 (2) Technics 1 Specification; and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 65, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the license. UE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION g

J s R. Hall, Sr. Project Manager Project Directorate Ill-3 Division of Reactor Projects !!!/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: January 15, 1992 l

l l

l

.. _ _. _ -._-~ --_- _ _ _ _.

ATTACHMENT TO LICENSE AMENDMENT NO. 65 OPERATING LICENSE NO. NPF-30 DOCKET NO. 50-483 Revise Appendix A Technical Specifications by removing the pages identified belcw and inserting the. enclosed pages.

The revised pages are identified by the captioned amendrelt number and contain marginal lines indicating the area of change. Corresponding overleaf pages are provided to maintain document completeness.

REMOVE INSERT 3/4 8 4 3/4 8-4 B 3/4 8-1 B 3/4 8-1 B 3/4 8-2 B 3/4 8-2

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

In accordance with the frequency specified in Table 4.8-1 on a a.

STAGGERED TEST BASIS by:

1)

Verifying the fuel level in the day tank, 2)

Verifying the fuel level in the fuel storage tank, 3)

Verifying the fuel transfer pump starts and transfers fuel from the 1torage system to the day tank.

4)

Verifying the diesel starts and accelerates to at least 514 rpm in less than or equal to 12 seconds.** The generator voltage and frequency shall be 4000 + 320 volti, and 60 + 1.2 Hz within 12 sec-onds** after the start sTgnal.

The diesel generator shall be started for this test by using one of the following signals:

a)

Manual, or b)

Simulated loss *of-offsite power by itself, or c)

Safety Injection test signal.

5)

Verifying the generator is synchronized, gradually loaded to an indicated 6000 to 6201 kW*** for at least 60 minutes, and l

6)

Verifying the diesel generator is aligned tn provide standby power to the associated emergency busses.

b.

At least once per 31 days and after each operation of the diesel where the period of operation was greater than or equal to I hour by checking for and removing accumulated water from the day tanks; At least onr.e per 31 days by checking for and removing accumulated c.

water from the fuel oil storage tanks; d.

By sampling new fuel oil in accordance with ASTM-04057 prior to addition to storage tanks and:

1)

By verifying in accordance with the tests specified in ASTM-0975-81 prior to addition to the storage tanks that the sample has:

    • This test shall be preceded by an engine prelube period and/or other wannup procedures recommended by the manufacturer so that mechanical stress and wear on the diesel engine is minimized.
      • Tiiis band is meant as guidance to avoid routine overloading of the engine.

Loads in excess of this band for special testing under direct mor,itoring or momentary variations due to changing bus loads shall not invalidate this test.

CALLAWAY - UNIT 1 3/4 8-3 Amendment Nc. 21, t

ELE'TRICAL POWER SYSTEMS C

SURVEILLANCE REQUIREMENTS (Continued) a)

An API Gravity of within 0.3 degrees at 60'F, or a specific gravity of within 0.0016 at 60/60'F, when compared to the supplier's certificate, or an absolute specific gravity at 60/60*F of greater than or equal to 0.83 but less than or equal to 0.89, or an API gravity of greater than or equal to 27 degrees but less than or equal to 39 degrees; b)

A kinematic viscosity at 40*C of greater than or equal to 1.9 centistokes, but less than or equal to 4.1 centistokes, if gravity was not determined by comparison with the supplier's certification; c)

A flash point equal to or greater than 125'F; and d)

A clear and bright appearance with proper color when tested in accordance with ASTH-04176-82.

2)

By verifying within 30 days of obtaining the sample that the other properties specified in Table 1 of ASTM-0975-81 are met when tested in accordance with ASTH-D975-81 except that the analysis for sulfur may be performed in accordance with ASTM-01552-79 or ASTH-02622-82.

At least once every 31 days by obtaining a sample of fuel oil in e.

accordance with ASTH-D2276-78, and verifying that total particulate contamination is less than 10 mg/ liter when checked in accordance with ASTH-02276-78, Me; hod A;

f. # At least once per 18 months, during shutdown, by:

1)

Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service; 2)

Verifying the diesel generator capability to reject the ESW pump rrotor load (the largest single emergency load) while maintaining voltage at 4000 1 320 volts and frequency at 6015.4 Hz; 3)

Verifying the diesel g, rator capability to reject a load of 6201 kW without trippit The generator voltage shall not exceed 4784 volts during

,d following the load rejection; 4)

Simulating a loss-of-offsite power by itself, and:

a)

Verifying deenergization of the emergency busses and load shedding from the emergency busses and j

l

  1. The specified 18-month frequency may be waived for Cycle I provided the sur-l veillance 's performed prior to restart following the first refueling outage or June 1, 1986, whichever occurs first.

The provisions of Specification 4.0.2 i

are reset from performance of this surveillance.

CALLWAY - UNIT 1 3/4 8-4 Amendment No. $41,65 l

i i

e 3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1 3/4.8.2, and 3/4.8.3 DTITRIB$ TION A.C. i,0VRCES, D.C. SOURCES. and ONSITE POWER The OPERABILITY of the A.C. and D.C power sourrss and associated distribution systems during operation ensures that $dfficient power will be available to supply the safety-related equipment required for:

(1) the safe shutdown of the facility, and (2) the mitigation and control of accident condi-tions within the facility.

The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix A to 10 CFR Part 50.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation.

The OPERABILITY of the power sources are consistent with the initial :ondition assumptions of the safety analyses and are based upon maintaining at least one redundant set of onsite A.C. and D.C.

power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss-of-offsite power and single failure of the other onsite A.C. source.

The A.C. and D.C. source allowable out-of-service times are based on Regulatory Guide 1.93, " Availability of Electrical Power Sources," December 1974.

When one diesel generator is inoperable, there is an additional ACTION requirement to verify that all required systems, subsystems, trains, components and devices, that depend on the remaining OPERABLE diesel generator as a source of emergency power, are also OPERABLE, and that the steam-driven auxiliary feedwater pump is OPERABLE.

This require-ment is intended to provide assurance that a less-of-offsite power event will not result in a complete loss of safety function ~ of critical systems during the period one of the diesel generators is inoperable.

The term verify as used in this enntext means to administratively check by examining logs or other information to determine if certain components are out-of-service for maintenance or other rnasons.

It does not mean to perform the Surveillance Requirements needed to demonstrate the OPERABILITY of the component.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that:

(1) the facility can be maintained in the shutdown or refueling condition for extended time periods, and (2) sufficient instrumentation and control capability are available for monitoring and maintaining the unft status.

The Surveillaxe Requirements for demonstrating the'0PERABILITY of the diesel generators are in accordance with the recommendations of Regulatory Guides 1.9, " Selection of Diesel Generator Set Capacity for Standby Power Supplies," Revision 1, Noverrber 1978; 1.108, " Periodic Testing of Diesel l

l Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977 as modified by Amendment No. 21, issued May 1, 19871 and 1.137, " Fuel-Oil Systens for Standby Diesel Generators,"

l Revision 1, October 1979.

Each diesel generator (DG) is provided with an l

CALLAWAY - UNIT 1 B 3/4 8-1 Amendment No. W,65 l

ELECTRIC POWER SYSTEMS BASES A.C. SOURCES, D.C. SOURCES, and ONSITE POWfR DISTRIBUTION (Continued) engine overspeed trip to prevent damage to the engine.

Recovery from the transient caused by the loss of a large load could cause diesel engine over-speed, which, if excessive, might result in a trip of the engine. Surveil-lance Requirement 4.8.1.1.2.f(2) demonstrates the DG load response character-istics and capability to reject the largest single load without exceeding predetermined voltage and frequency and while maintaining a specified margin to the overspeed trip as required by Regulatory Guide 1.9, Position C.4.

The Surveillance Requirements for demonstrating the OPERABILITY of the station batteries are based on the recommendations of Regulatory Guide 1.129,

" Maintenance Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants," February 1978; and IEEE Std 450-1980, "IEEE Recommended Practice for Maintenan:.e, Testing, and Replacement of Large Lead Storage Batteries for Generating Stations and Substations."

Verifying average electrolyte temperature above the minimum for which the battery was sized, total battery terminal voltage on float charge, connection resistance values and the performance of battery service and discharge tests ensures the effectiveness of the charging system, the ability to handle high discharge rates and compares the battery capacity at that time with the rated capacity.

Table 4.6-2 specifies the n umal limits for each designated pilot cell and each connected cell for electrolyte level, float voltage and specific gravity.

The limits for the designated pilot cells float voltage and specific gravity, greater than 2.13 volts and 0.015 below the manufacturer's full charge specific gravity or a battery charger current that had stabilized at a low value, is characteristic of a charged cell with adequate capacity.

The normal limits for each connected cell for float voltage and specific gravity, greater than 2.13 volts and not more than 0.020 below the manufacturer s full charge specificgravitywithanaveragespecificgravityofalltheconnectedcells not more than 0.010 below the manufacturer s full charge specific gravity, ensures the OPERABILITi and capability of the battery.

Operation with a battery cell's parameter outside the normal limit but within the Allowable Value specified in Table 4.8-2 is pe iitted for up to 7 d ys.

During this 7-day period:

(1) the Allowable Value for electrolyte level ensures no physical damage to the plates with an adequate electron transfer capability; (2) the Allowable Value for the average specific gravity of all the cells, not more than 0.020 below the manufacturer's recommended full charge specific gravity, ensures that the decrease in rathg will be less than the safety margin provided in sizing; (3) the Allowable Value for an individual cell's specific gravity, ensures that an individual cell's specific gravity will not be more than 0.040 below the manufacturer's full charge specific gravity and that the overall capability of the battery will be maintained within an acceptable lintit;,and (4) the Allowable Value for an individual cell's float voltege, greater than 2.07 volts, ensures the battery's capability to perform its design function.

CALLAWAY - UNIT 1 B 3/4 8-2 Amendment No. 65 l

l

, _. _.