e nn Tennessee Vaney Autnor:t/ ost Ooce Box 2000 Saddf-Da>sy Tennessee 37379 P

November 2,1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SON) - IMPLEMENTATION OF STATION BLACKOUT (SBO) COMMITMENTS FOR UNIT 1 (TAC NO. M89658)

The purpose of this letter is to provide the implementation status for SBO J

commitments to NRC. The procedure changes, programs, and modifications for Unit 1 have been completed. The modifications to the turbine-driven auxiliary feedwater level control valves have been completed to satisfy the last action for the Unit 1 SBO implementation. This same modification was completed previously for Unit 2 during the Cycle 6 refueling outage as described in a letter from TVA to NRC dated November 9,1994. This completes the last commitment associated with SON's SBO implementation plan.

Please direct questions concerning this issue to Keith Weller at (423) 843-7527.

Sincerely, n

R. H. Shell Manger SON Site Licensing cc: See page 2 9511060223 951102 PDR ADOCK 05000327 r

P PDR D

e U.S. Nuclear Regulatory Commission Page 2 November 2,1995 cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

.